Sie sind auf Seite 1von 2

Sr.

Environmental Mitigation Measures Compliance Description Remarks


No frequency
Main Disposal Station
10. Water sprinkling to reduce dust. Spray of water is being done
thrice a day as well as if any
3 times/day dusty condition is observed
contractor is directed to take
immediate actions
11. Removal and disposal of debris of existing structure at Dismantling of structure has
a safe place. Not applicable not been started
12. Disposal of sewage if any in a way that does not create Sewage disposal problem has
nuisance for the nearby inhabitants. Not applicable not arisen

Force mains

13. Water sprinkling during excavation to reduce dust Still there is no any dusty
pollution. complied condition is observed because
of saline soil
14. Restoration of all excavated earth, its compaction and As excavation is not yet
restoration to the original state. Addition of earth being completed but however
transported from outside if the need arise. short poles with installation
Work is in progress of tape are being erected
along the holes excavated of
dewatering
All other disposal stations except Main and
Ostagahi
15. Removal of any debris at a safe place away from
population. Work not started
16. Disposal of sludge from existing disposal station away
from population at a safe place as indicated by TMA. Work not started