SCHEDULE FOR MANDATORY TESTS


S.NO TYPE OF MATERIAL USED FREQUENCY OF TESTING
.

1.) Water testing as per IS456 After every 3 Months.

2.) Stone aggregate based on the particle


analysis:
After every 45 CUM.
a.) 40mm

b.) 20mm After every 45 CUM.

c.) Coarse sand After every 40 CUM.

d.) Fine sand After every 45 CUM.

3.) Bulkage of sand:

a.) Coarse sand After every 20 CUM.

b.) Fine sand After every 20 CUM.

4.) Silt Content:

a.) Coarse sand After every 20 CUM.

b.) Fine sand After every 20 CUM.

5.) Slump After every 15 CUM.

6.) Bricks compressive strength, Water After every 5000 Nos.


absorption, Efflorescent and
Dimension.
7.) C.C Cube ( Compressive strength):

a.) Mass Coc. After every 20 CUM.

b.) Beam/Slab i/c Walls After every 20 CUM.

c.) Column. After every 5 CUM.

d.) Others After every 5 CUM.

8.) T.M.T Bar: Physical as well as Chemical


as per IS 1786 Fe415:
After every 25 MT.
a.) Up to 10mm Diameter

b.) Up to 16mm Diameter After every 35 MT.

c.) 16mm and above Diameter After every 45 MT.

9.) Flush door: End emersion test, Knife


test, Adhesion test:

a.) Up to 50 Nos.

b.) 50-150 Nos.

c.) 151-300 Nos.

d.) 301 to 500 Nos.

e.) >500 Nos.