contractor at construction site. As, these tests are a compulsion, therefore they
should be done within the time/units specified as per the schedule.
A detailed report is to be sent to the head office after the completion of each
test within a stipulated period of time.
a.) Up to 50 Nos.
10.)
11.)
12.)
13.)
14.)
15.)
16.)
17.)
18.)
19.)
20.)