Delaware Aqueduct Leak

v Tunnel is 45 miles long


v Tunnel hundreds of feet
below grade
v Delivers >50% of NYC
water supply

~4
mi .5
les

DRAFT
1
Tunnel in Wawarsing w/ Geology
v Deep buried glacial valley
v Seismic faults along alignment
v Series of shales, sandstones, and limestones, tilted at 30o and 90o

DRAFT
Tunnel in Roseton w/ Geology
v Primarily Wappinger Limestone, folded and faulted
v Traversed by two major fault systems

DRAFT
Tunnel Leak Investigations
Over $27 million of investigation work (1998-2010) including:
v

v
Geological investigations
v
Tunnel flow monitoring
v
Well monitoring
v
Monitoring of surface expressions
v
Automated Underwater Vehicle (AUV) inspections

Sample pictures from AUV

DRAFT
Wawarsing AUV Images
Centerline Crown of
Crown of of Tunnel Tunnel
Tunnel 9:00 Invert 3:00

Direction of Flow
IMAG ~20’

E
NOT
AVAIL
ABLE

42’ - 5”

PHOTO TAKEN JUNE


Sta. 281+88 (1.3 miles south along tunnel from Shaft 2)
5, 2009
DRAFT
Wawarsing AUV Images

Sta. 282+60 (1.3 miles south along tunnel from Shaft 2)

DRAFT
Roseton AUV Images

PHOTO TAKEN JUNE


5, 2009 Sta. 1487+23 (~1.3 miles south along tunnel from Shaft 5A)

DRAFT
v
Roseton AUV Images
5,200 linear feet (LF) of cracking in Roseton (485 LF in Wawarsing)
v
Deepest segment of tunnel ~850 feet below ground surface
v
Largest percentage of leakage as indicated in AUV investigations
and backflow tests

PHOTO TAKEN JUNE


Sta. DRAFT
1492+92 (~1.4 miles south along tunnel from Shaft 5A)
Proposed Bypass Spans Problematic Area

New Bypass Tunnel Shaft 5 Connection


Existing Tunnel Shaft 6 Connection
9 DRAFT
10

3D Rendering of Bypass
Concept
HUDSO Shaft 5A
N RIVER

Existing
Shaft 6 Tunnel

Shaft 6 Launch Shaft

DRAFT
11

3D Rendering of Bypass
Concept
HUDSO Shaft 5A
N RIVER

Tunnel
Reception
Existing Shaft
Shaft 6 Tunnel

Connection Shaft 6 Launch Shaft


Shaft

Bypass
Tunnel

Tunnel Launch
Shaft

DRAFT