Sie sind auf Seite 1von 38

DUBAI ELECTRICITY & WATER AUTHORITY

JEBEL ALI POWER AND DESALINATION STATION 'M' REPORT NO.:


Contract No. : CNE/001/2006 PAGE: 1 OF 2
DATE: ___________________

11kV MV SWGR TEST REPORT


Ref No.: __________________

LOCATION / AREA : DRAWING NO :


KKS NO : MAKER:
CALIBRATION
TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER
DATE
Meg Ohm Meter
Digital Micro Ohm meter
Circuit Breaker Analizer

11kV SWGR VACUUM CIRCUIT BREAKER TEST


1. General Data
Type
Rated Voltage
Rated Current
Rated Breaking Capacity
Duty Cycle
Serial No.
Aux. Voltage
Motor Voltage

2. Visual Check
Not
Description OK Accepted

Visual Check for External Damage


Visual Check of operation mechanism components: operation mechanism
Visual Check of operation mechanism components: control switch, position
indicator

3. Insulation Resistance Test


Breaker Closed Breaker Open
R-E R-R
S-E S-S
T-E T-T

COMMENTS:

Accepted by Name Signature Date


HHI
DOOSAN
FICHTNER
DEWA
DUBAI ELECTRICITY & WATER AUTHORITY
JEBEL ALI POWER AND DESALINATION STATION 'M' REPORT NO.:
Contract No. : CNE/001/2006 PAGE: 2 OF 2
DATE: ___________________

11kV MV SWGR TEST REPORT


Ref No.: __________________

LOCATION / AREA : DRAWING NO :


KKS NO : MAKER:
CALIBRATION
TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER
DATE
Meg Ohm Meter
Digital Micro Ohm meter
Circuit Breaker Analizer

11kV SWGR VACUUM CIRCUIT BREAKER TEST

4. CB Close / Open Timing Test


Main Contacts
Phase
Closing Time msec Opening Time msec
R
S
T

5. Contact Resistance Measurement


Phase Current injected A Contact Resistance µΩ
R
S
T

COMMENTS:

Accepted by Name Signature Date


HHI
DOOSAN
FICHTNER
DEWA
DUBAI ELECTRICITY & WATER AUTHORITY
JEBEL ALI POWER AND DESALINATION STATION 'M' REPORT NO.:
Contract No. : CNE/001/2006 PAGE: 1 OF 5
DATE: ___________________

11kV MV SWGR TEST REPORT


Ref No.: __________________

LOCATION / AREA : DRAWING NO :


KKS NO : MAKER:
CALIBRATION
TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER
DATE
Meg Ohm Meter
DC mA Ammeter
CT Injection kit

11kV SWGR CURRENT TRANSFORMER TEST


1. Data
Phase R S T
Serial No.

Winding Resistance @ 75
CT No. Purpose Ratio Class
°C
T2-1
5P20
CL PX
T2-2

2. Insulation Resistance Test: 500V DC for 1 min

Sec to all other core & Primary Earth Primary to Sec. Earth
CT
R S T R S T

3. Polarity Test:

S1-S2
CT No.
R S T
T2-1
5P20
CL PX
T2-2

COMMENTS:

Accepted by Name Signature Date


HHI
DOOSAN
FICHTNER
DEWA
DUBAI ELECTRICITY & WATER AUTHORITY
JEBEL ALI POWER AND DESALINATION STATION 'M' REPORT NO.:
Contract No. : CNE/001/2006 PAGE: 2 OF 5
DATE: ___________________

11kV MV SWGR TEST REPORT


Ref No.: __________________

LOCATION / AREA : DRAWING NO :


KKS NO : MAKER:
CALIBRATION
TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER
DATE
Meg Ohm Meter
DC mA Ammeter
Single Phase Variac
CT Injection kit

11kV SWGR CURRENT TRANSFORMER TEST


4. Winding Resistance in ohms @ 75 °C (room temperature °C)

S1-S2 Ohms S1-S2 @ 75 °C


CT
R S T R S T
T2-1
5P20
CL PX
T2-2
ZCT

5. Magnetizing Curve Test


T2-1
R S T
Current (mA) Voltage (V) Current (mA) Voltage (V) Current (mA) Voltage (V)

COMMENTS:

Accepted by Name Signature Date


HHI
DOOSAN
FICHTNER
DEWA
DUBAI ELECTRICITY & WATER AUTHORITY
JEBEL ALI POWER AND DESALINATION STATION 'M' REPORT NO.:
Contract No. : CNE/001/2006 PAGE: 3 OF 5
DATE:

11kV MV SWGR TEST REPORT


Ref No.: _____________

LOCATION / AREA : DRAWING NO :


KKS NO : MAKER:
SERIAL CALIBRATION
MAKE / MODEL
NUMBER DATE
Meg Ohm Meter
DC mA Ammeter
Single Phase Variac
CT Injection kit
11kV SWGR CURRENT TRANSFORMER TEST
5P20
R S T
Current (mA) Voltage (V) Current (mA) Voltage (V) Current (mA) Voltage (V)

CL PX
R S T
Current (mA) Voltage (V) Current (mA) Voltage (V) Current (mA) Voltage (V)

T2-2
R S T
Current (mA) Voltage (V) Current (mA) Voltage (V) Current (mA) Voltage (V)

COMMENTS:

Accepted by Name Signature Date


HHI
DOOSAN
FICHTNER
DEWA
DUBAI ELECTRICITY & WATER AUTHORITY
JEBEL ALI POWER AND DESALINATION STATION 'M' REPORT NO.:
Contract No. : CNE/001/2006 PAGE: 4 OF 5
DATE: ___________________

11kV MV SWGR TEST REPORT


Ref No.: __________________

LOCATION / AREA : DRAWING NO :


KKS NO : MAKER:
CALIBRATION
TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER
DATE
Meg Ohm Meter
DC mA Ammeter
CT Injection kit

11kV SWGR CURRENT TRANSFORMER TEST

6. Ratio Test

Current Inejcted In Current Measured at Secondary A


Phase
Primary A T2-1 5P20 CL PX
R
S
T

Current Inejcted In Current Measured at Secondary A


Phase
Primary A T2-2
R
S
T

COMMENTS:

Accepted by Name Signature Date


HHI
DOOSAN
FICHTNER
DEWA
DUBAI ELECTRICITY & WATER AUTHORITY
JEBEL ALI POWER AND DESALINATION STATION 'M' REPORT NO.:
Contract No. : CNE/001/2006 PAGE: 5 OF 5
DATE: ___________________

11kV SWGR MV TEST REPORT


Ref No.: __________________

LOCATION / AREA : DRAWING NO :


KKS NO : MAKER: HHI
CALIBRATION
TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER
DATE
Meg Ohm Meter
DC mA Ammeter
Single Phase Variac
CT Injection kit

11kV CT CIRCUIT LOOP RESISTANCE MEASUREMENT

7. Bus Bar Protection CT Circuit Loop Resistance (RL)

Measured RL at Room
Phase Calculated RL at 75°C
Temp.( 24°C)

COMMENTS:

Accepted by Name Signature Date


HHI
DOOSAN
FICHTNER
DEWA
DUBAI ELECTRICITY & WATER AUTHORITY
JEBEL ALI POWER AND DESALINATION STATION 'M' REPORT NO.:
Contract No. : CNE/001/2006 PAGE: 1 OF 3
DATE: ___________________

11kV MV SWGR TEST REPORT


Ref No.: __________________

LOCATION / AREA : DRAWING NO :


KKS NO : MAKER:
CALIBRATION
TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER
DATE
Meg Ohm Meter
DC mA Ammeter
Single Phase Variac
CT Injection kit

11kV SGWR POTENTIAL TRANSFORMER TEST


1. Data
Phase R S T
Serial No.
Ratio
Class
Burden (VA)

2. Insulation Resistance Test: 500V DC (Result in Giga Ohm) for: 1 min. room temp. °C
IR Value (Giga Ohms)
Winding Connections Remarks
R S T
Primay - Ground
Secondary - Ground
Primary - Secondary

3. Polarity Test
Polarity
Phase
Core-1
R
S
T

COMMENTS:

Accepted by Name Signature Date


HHI
DOOSAN
FICHTNER
DEWA
DUBAI ELECTRICITY & WATER AUTHORITY
JEBEL ALI POWER AND DESALINATION STATION 'M' REPORT NO.:
Contract No. : CNE/001/2006 PAGE: 2 OF 3
DATE: ___________________

11kV MV SWGR TEST REPORT


Ref No.: __________________

LOCATION / AREA : DRAWING NO :


KKS NO : MAKER:
CALIBRATION
TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER
DATE
Meg Ohm Meter
DC mA Ammeter
Single Phase Variac
CT Injection kit

11kV SWGR POTENTIAL TRANSFORMER TEST

4. Winding Resistance Measurement


Secondary Winding
Phase Primary Winding (KΩ)
Core-1 (Ohm)
R
S
T

5. Voltage Ratio Test: Primary Injected Voltage : VAC 1 -Phase


VT Ratio=11,000/1.73/110/1.73

Applied Volt Sec. Measured


a-n Standard Ratio Measured Ratio Remarks
1 - phase Voltage

R 100
S 100
T 100

COMMENTS:

Accepted by Name Signature Date


HHI
DOOSAN
FICHTNER
DEWA
DUBAI ELECTRICITY & WATER AUTHORITY
JEBEL ALI POWER AND DESALINATION STATION 'M' REPORT NO.:
Contract No. : CNE/001/2006 PAGE: 3 OF 3
DATE: ___________________

11kV MV SWGR TEST REPORT


Ref No.: __________________

LOCATION / AREA : DRAWING NO :


KKS NO : MAKER:
CALIBRATION
TEST INSTRUMENT: SERIAL NUMBER
DATE
Meg Ohm Meter
DC mA Ammeter
Single Phase Variac
CT Injection kit

11kV SWGR POTENTIAL TRANSFORMER TEST

6. Magnetization current Measurement

Voltage Applied
Phase Magnetizing current in Primary Secondary Voltage
in Primary

R
S
T

7. Zero sequence voltage measurement

Voltage Applied Secondary Zero sequence Voltage


Phase Magnetizing current
in Primary (open delta)

RS
ST
TR

COMMENTS:

Accepted by Name Signature Date


HHI
DOOSAN
FICHTNER
DEWA
DUBAI ELECTRICITY & WATER AUTHORITY
JEBEL ALI POWER AND DESALINATION STATION 'M' REPORT NO.:
Contract No. : CNE/001/2006 PAGE: 1 OF 11
DATE: ___________________

11kV SWGR MV TEST REPORT


Ref No.: __________________

LOCATION / AREA : DRAWING NO :


KKS NO : MAKER:
CALIBRATION
TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER
DATE
Meg Ohm Meter
Relay Test Unit

11kV SWGR MULTIFUNCTION RELAY


REF543 PROTECTION RELAY
SERIAL No. :

1. Visual checks

Conditions of Relay

Installation and wiring checking

Relay connected to local earth bar

Status Input

Relay Auxiliary supply

2.Insulation Resistance measurement on Control & Aux. circuits

IR value (500 V DC for 1 min ):

COMMENTS:

Accepted by Name Signature Date


HHI
DOOSAN
FICHTNER
DEWA
DUBAI ELECTRICITY & WATER AUTHORITY
JEBEL ALI POWER AND DESALINATION STATION 'M' REPORT NO.:
Contract No. : CNE/001/2006 PAGE: 2 OF 11
DATE: ___________________

11kV MV SWGR TEST REPORT


Ref No.: __________________

LOCATION / AREA : DRAWING NO :


KKS NO : MAKER:
CALIBRATION
TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER
DATE
Meg Ohm Meter
Relay Test Unit
Three Phase relay test kit

11kV SWGR MULTIFUNCTION RELAY


3.PROTECTION FUNCTIONS
1. DATA
1.1 REF543-Inputs
Input - Analog Type Ratio

CT

2. OVERCURRENT IDMT CHARACTERISTICS (51)


2.1 Settings
Main Setting Second Setting Setting Range

Iset / In 0.05….40.00 In
K 0.05….1.50
Curve Type NI,VI,EI,LI
Used Sensors 1….6
2.2. Check on Overcurrent IDMT Characteristic: Curve VI
Pick up Current Drop off Current TMS Operating Time
Sl.No.
A A Setting 2*Is 5*Is
1
2
3

3. EARTH FAULT IDMT CHARACTERISTIC (51N)


2.1 Settings
Main Setting Second Setting Setting Range

Iset / In 0.05….40.00 In
K 0.05….1.50
Curve Type NI,VI,EI,LI
Used Sensors 1….6

COMMENTS:

Accepted by Name Signature Date


HHI
DOOSAN
FICHTNER
DEWA
DUBAI ELECTRICITY & WATER AUTHORITY
JEBEL ALI POWER AND DESALINATION STATION 'M' REPORT NO.:
Contract No. : CNE/001/2006 PAGE: 3 OF 11
DATE: ___________________

11kV MV SWGR TEST REPORT


Ref No.: __________________

LOCATION / AREA : DRAWING NO :


KKS NO : MAKER:
CALIBRATION
TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER
DATE
Meg Ohm Meter
Relay Test Unit
Three Phase relay test kit

11kV SWGR MULTIFUNCTION RELAY

b. Check on Earthfault IDMT Characteristic: Curve NI


Pick up Current Drop off Current TMS Operating Time
Sl.No.
A A Setting 2*Is 5*Is
1

4. CB TRIP, SIGNALING

CB Trip OK: Signaling OK

COMMENTS:

Accepted by Name Signature Date

HHI

DOOSAN
FICHTNER
DEWA
DUBAI ELECTRICITY & WATER AUTHORITY
JEBEL ALI POWER AND DESALINATION STATION 'M' REPORT NO.:
Contract No. : CNE/001/2006 PAGE: 4 OF 11
DATE: ___________________

11kV MV SWGR TEST REPORT


Ref No.: __________________

LOCATION / AREA : DRAWING NO :


KKS NO : MAKER:
CALIBRATION
TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER
DATE
Meg Ohm Meter
Relay Test Unit
Three Phase relay test kit

11kV SWGR MULTIFUNCTION RELAY


3.PROTECTION FUNCTIONS
SERIAL No.
1. DATA
1.1 SPAU 140C
Input - Analog Type Ratio

2. RESTRICTED EARTH-FAULT CURRENT (87B-R)


2.1 Settings
Main Setting Second Setting Setting Range

Iset / In 0.5 … 5 % In
Time 35 msec

2.2. Measurement
Pick up Current Drop Off Tripping Time
1

3. RESTRICTED EARTH-FAULT CURRENT (87B-S)


3.1 Settings
Main Setting Second Setting Setting Range

Iset / In 0.5….5% In
Time 35 msec
3.2 Measurement
Pick up Current Drop Off Tripping Time
1 0.042

COMMENTS:

Accepted by Name Signature Date


HHI
DOOSAN
FICHTNER
DEWA
DUBAI ELECTRICITY & WATER AUTHORITY
JEBEL ALI POWER AND DESALINATION STATION 'M' REPORT NO.:
Contract No. : CNE/001/2006 PAGE: 5 OF 11
DATE: ___________________

11kV MV SWGR TEST REPORT


Ref No.: __________________

LOCATION / AREA : DRAWING NO :


KKS NO : MAKER:
CALIBRATION
TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER
DATE
Meg Ohm Meter
Relay Test Unit
Three Phase relay test kit

11kV SWGR MULTIFUNCTION RELAY

4. RESTRICTED EARTH-FAULT CURRENT (87B-T)


4.1 Settings
Main Setting Second Setting Setting Range
Iset/ In 0.5…5% In
Time 35 msec

4.2 Measurement
Pick up Current Drop Off Tripping Time

5. UNDER VOLTAGE LOW SET PROTECTION U< (27)


5.1 Settings
Main Setting Second Setting Setting Range
Start Value 0.1 …. 1.2 Un
Time 40 …..300000 msec

5.2. Measurements
Time at rated Voltage
Pick up Voltage V Drop Off Voltage V
(msec)
1

6. CB TRIP, SIGNALING

CB TRIP OK SIGNALING OK

COMMENTS:

Accepted by Name Signature Date


HHI
DOOSAN
FICHTNER
DEWA
DUBAI ELECTRICITY & WATER AUTHORITY
JEBEL ALI POWER AND DESALINATION STATION 'M' REPORT NO.:
Contract No. : CNE/001/2006 PAGE: 6 OF 11
DATE: ___________________

11kV MV SWGR TEST REPORT


Ref No.: __________________

LOCATION / AREA : DRAWING NO :


KKS NO : MAKER:

TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER CALIBRATION DATE

Meg Ohm Meter


Relay Test Unit
Three Phase relay test kit

11kV SWGR MULTIFUNCTION RELAY


4.Mechanical Functional Test

Earth Switch Circuit Breaker Lock Lever Key


Results Status
Service Test
Closed Open Closed Open Open Close
Position Position
CB Insertion not
1 1 1 1
Possible
CB Insertion not
1 1 1 1
Possible
CB Insertion not
1 1 1 1
Possible

1 1 1 1 CB Insertion Possible

CB Disconnection not
1 1 1 1
Possible
CB Disconnection not
1 1 1 1
Possible
CB Disconnection
1 1 1 1
Possible
CB Closing Not
1 intermediate 1
Possible
CB Door Not Posible
1 1 1 1
Open
CB Door Not Posible
1 1 1 1
Open
Cable comp Door not
1 _ _ _ _ _ _
posible to close
Cable comp Door not
1 _ _ _ _ _ _
posible to open
Note: Everytime CB is moved to rack in or rack out position, rack in / out key turn and hold to Anticlockwise (30 deg)

COMMENTS:

Accepted by Name Signature Date

DOOSAN
EMPLOYER/ENGINEER
DUBAI ELECTRICITY & WATER AUTHORITY
JEBEL ALI POWER AND DESALINATION STATION 'M' REPORT NO.:
Contract No. : CNE/001/2006
PAGE: 7 OF 11

DATE: ___________________

11kV MV SWGR TEST REPORT


Ref No.: __________________

LOCATION / AREA : DRAWING NO :


KKS NO : MAKER:
CALIBRATION
TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER
DATE
Meg Ohm Meter
Relay Test Unit
Three Phase relay test kit

11kV SWGR MULTIFUNCTION RELAY


5.Electrical Functional Test
(i) SS1 Local/ Remote Control Key in Remote

Circuit Breaker
Action Results Status
Service Test
Closed Open
Position Position

1 1 Local Closing CB Not Closed

1 1 Local Closing CB Opened

1 1 Remote Closing CB Closed

1 1 Remote Opening CB Opened

1 1 Local Closing CB Not Closed

1 1 Local Opening CB Opened

Emergency
1 1 CB Opened
Opening

1 1 Remote Closing CB Closed

1 1 Remote Opening CB Opened

COMMENTS:

Accepted by Name Signature Date


HHI
DOOSAN
FICHTNER
DEWA
DUBAI ELECTRICITY & WATER AUTHORITY
JEBEL ALI POWER AND DESALINATION STATION 'M' REPORT NO.:
Contract No. : CNE/001/2006
PAGE: 8 OF 11

DATE: ___________________

11kV MV SWGR TEST REPORT


Ref No.: __________________

LOCATION / AREA : DRAWING NO :


KKS NO : MAKER:
CALIBRATION
TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER
DATE
Meg Ohm Meter

Relay Test Unit


Three Phase relay test kit

11kV SWGR MULTIFUNCTION RELAY

(ii) SS1 Local/ Remote Control Key in Local (A Type)

Circuit Breaker
Action Result Status
Test Service Closed Opened

1 1 Local Closing CB Closed

1 1 Local Opening CB Opened

1 1 Remote Closing CB Not Closed

1 1 Remote Opening CB Opened

1 1 Local Closing CB Closed

1 1 Local Opening CB Opened


Emergency
1 1 CB Opened
Opening
1 1 Remote Closing CB Not Closed

1 1 Remote Opening CB Opened

Note: REF Key in No Control mode bay control no action

COMMENTS:

Accepted by Name Signature Date


HHI
DOOSAN
FICHTNER
DEWA
DUBAI ELECTRICITY & WATER AUTHORITY
JEBEL ALI POWER AND DESALINATION STATION 'M' REPORT NO.:
Contract No. : CNE/001/2006 PAGE: 9 OF 11
DATE: ______________
11kV MV SWGR TEST REPORT

LOCATION / AREA : DRAWING NO :


KKS NO : MAKER:
SERIAL CALIBRATIO
TEST INSTRUMENT: MAKE / MODEL
NUMBER N DATE
Meg Ohm Meter
Relay Test Unit
Three Phase relay test kit
11kV SWGR MULTIFUNCTION RELAY
6. LED Checking
FUNCTION OF SIGNALLING LEDs
NR DESCRIPTION OFF GREEN YELLOW RED STATUS
READY Internal self test FAULT NORM _ _
ALARM LOCK ( 86 ) NORM _ _ TRIP
INTERLOCKS ERROR
1 ARC FAULT CABLE ZONE _ NORM _ TRIP
2 ARC FAULT C.B ZONE _ NORM _ TRIP
3 ARC FAULT BUS ZONE _ NORM _ TRIP
4 C.B SPRING CHARGED _ CHARGED DISCHAR _
5 C.B TRIP COIL _ NORM FAULT _
6 REF 543 PROT _ OK OFF
7 87B/ ARC NORM TRIP
8 Alarm page 1 of 3/see > page2 _
page 3
1 51 NORM _ _ TRIP
2 51N NORM _ _ TRIP
3 27 NORM _ _ TRIP
4 VT fuse
5 MCB
6 VENT
7 87B A /ARC
8 Alarm page 2 of 3/see > page1
page 3
1 PROT. GTG TR
3 Alarm page 3 of 3 /see page 1
page 2
COMMENTS:

Accepted by Name Signature Date


HHI
DOOSAN
FICHTNER
DEWA
DUBAI ELECTRICITY & WATER AUTHORITY
JEBEL ALI POWER AND DESALINATION STATION 'M' REPORT NO.:
Contract No. : CNE/001/2006 PAGE: 10 OF 11
DATE: ___________________

11kV MV SWGR TEST REPORT


Ref No.: __________________

LOCATION / AREA : DRAWING NO :


KKS NO : MAKER:
CALIBRATION
TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER
DATE
Meg Ohm Meter
Relay Test Unit
Three Phase relay test kit
11kV SWGR MULTIFUNCTION RELAY
7. Binary Input
Binary Input Initiating Device Result
BI01 CB On
BI02 CB Off
BI03 CB test Position
BI04 CB service Position
BI05 Earting Switch off
BI06 Earting Switch On
BI07 Trip Coil Supervision Alarm
BI08 Watchdog
BI09 Arc Fault
BI10 Protection Trip
BI11 Selector switch remote
BI12 CB tripped Arc F50/51,F87B & CB Open
BI13 Spare
BI14 Protection Activated (F50/51,F87B& Arc)
BI15 ARC fault Control Compartment
BI16 ARC fault Main Bus Compartment
BI17 ARC fault C.B. Compartment
BI18 ARC fault Cable Compartment
BI19 F27/59 Protection Trip
BI20 F87B Protection Trip
BI21 Protection Activated
BI22 MCB Trip & No Control Voltage

COMMENTS:

Accepted by Name Signature Date


HHI
DOOSAN
FICHTNER
DEWA
DUBAI ELECTRICITY & WATER AUTHORITY
JEBEL ALI POWER AND DESALINATION STATION 'M' REPORT NO.:
Contract No. : CNE/001/2006 PAGE: 11 OF 11
DATE: ___________________

11kV MV SWGR TEST REPORT


Ref No.: __________________

LOCATION / AREA : DRAWING NO :


KKS NO : MAKER:
CALIBRATION
TEST INSTRUMENT: MAKE / MODEL SERIAL NUMBER
DATE
Meg Ohm Meter
Relay Test Unit
Three Phase relay test kit

11kV SWGR MULTIFUNCTION RELAY


8. Binary Output (A Type)
Binary Output Initiating Device Result
BO01 Closing QC
BO02 Opening QO
BO03 Prot trip (86)
BO04 Cubicle remote position
BO05 Spare
BO06 CB Tripped
BO07 Group alarm control MCB trip
BO08 Aux. Supply On
BO09 ARC Fault

COMMENTS:

Accepted by Name Signature Date


HHI
DOOSAN
FICHTNER
DEWA
DUBAI ELECTRICITY & WATER AUTHORITY
JEBEL ALI POWER AND DESALINATION STATION 'M' REPORT NO.:
Contract No. : CNE/001/2006 PAGE : 1 OF 1
DATE: ___________________

11kV MV SWGR TEST REPORT


Ref No.: __________________

LOCATION / AREA : DRAWING NO :


KKS NO : MAKER:
SERIAL CALIBRATION
TEST INSTRUMENT: MAKE/MODEL
NUMBER DATE
Relay Test Unit

11kV SWGR SYNCHRO CHECK RELAY


SYNCHRO CHECK RELAY SPAU140 C
SERIAL No. :
1. Visual checks

Conditions of Relay

Installation and wiring checking

Relay Test connected to local earth


bar
Status Input

Relay Auxiliary supply

Relay check at extreme limit of


voltage

2.Relay Test

Voltage applied in terminal Voltage applied in terminal Close Permissive

Voltage Degree Hz Voltage Degree Hz Ok Not Ok

High

Low

COMMENTS:

Accepted by Name Signature Date


HHI
DOOSAN
FICHTNER
DEWA
DUBAI ELECTRICITY & WATER AUTHORITY
JEBEL ALI POWER AND DESALINATION STATION 'M' REPORT NO.:
Contract No. : CNE/001/2006 PAGE : 1 OF 4
DATE: ___________________

11kV MV SWGR TEST


REPORT Ref No.: __________________

LOCATION / AREA : DRAWING NO :


KKS NO : MAKER:
SERIAL CALIBRATION
TEST INSTRUMENT: MAKE/MODEL
NUMBER DATE
Digital Multimeter
Primary Current Injection Test

11kV SWGR - CALIBRATION OF METERS & TRANSDUCERS

CT Ratio: Input:
Aux. Supply: Range:
1. Calibration of Ammeter
Data of Ammeter:
Current injected Ammeter Calculated
Sl.No. Phase % Error
A reading AMP
1 R
2 R
3 R
4 R
5 S
6 S
7 S
8 S
9 T
10 T
11 T
12 T

COMMENTS:

Accepted by Name Signature Date


DOOSAN
EMPLOYER/ENGINEER
DUBAI ELECTRICITY & WATER AUTHORITY
JEBEL ALI POWER AND DESALINATION STATION 'M' REPORT NO.:
Contract No. : CNE/001/2006 PAGE : 2 OF 4
DATE: ___________________

11kV MV SWGR TEST


REPORT Ref No.: __________________

LOCATION / AREA : DRAWING NO :


KKS NO : MAKER:
SERIAL CALIBRATION
TEST INSTRUMENT: MAKE/MODEL
NUMBER DATE
Digital Multimeter
Primary Current Injection Test

11kV SWGR - CALIBRATION OF METERS & TRANSDUCERS


2.Calibration of Voltmeter
VT Ratio: Input:
Aux.Supply: Output range:
Data:
Voltmeter Calculated
Sl.No. Phase Voltage applied V % Error
reading voltage
1 R
2 R
3 R
4 R
5 S
6 S
7 S
8 S
9 T
10 T
11 T
12 T
3. Calibration of Energymeter Input: Aux. Supply:
CT Ratio: VT Ratio: Output:

Voltage Current
Test Registered
Sl.No. applied injected PF Calculated KWH % Error
Duration KWH
V A
1
2
3

COMMENTS:

Accepted by Name Signature Date


DOOSAN
EMPLOYER/ENGINEER
DUBAI ELECTRICITY & WATER AUTHORITY
JEBEL ALI POWER AND DESALINATION STATION 'M' REPORT NO.:
Contract No. : CNE/001/2006 PAGE : 3 OF 4
DATE: ___________________

11kV MV SWGR TEST


REPORT Ref No.: __________________

LOCATION / AREA : DRAWING NO :


KKS NO : MAKER:
SERIAL CALIBRATION
TEST INSTRUMENT: MAKE/MODEL
NUMBER DATE
Digital Multimeter
Primary Current Injection Test

11kV SWGR - CALIBRATION OF METERS & TRANSDUCERS


1. Calibration of Ammeter Transducer
DATA:
CT Ratio: Input:
Aux. Supply: Output:

Current injected Transducer Calculated


Sl.No. Phase % Error
A output mA output mA
1 R
2 R
3 R
4 R
5 S
6 S
7 S
8 S
9 T
10 T
11 T
12 T

COMMENTS:

Accepted by Name Signature Date


DOOSAN
EMPLOYER/ENGINEER
DUBAI ELECTRICITY & WATER AUTHORITY
JEBEL ALI POWER AND DESALINATION STATION 'M' REPORT NO.:
Contract No. : CNE/001/2006 PAGE : 4 OF 4
DATE: ___________________
11kV MV SWGR TEST
REPORT Ref No.: __________________

LOCATION / AREA : DRAWING NO :


KKS NO : MAKER:
SERIAL CALIBRATION
TEST INSTRUMENT: MAKE/MODEL
NUMBER DATE
Digital Multimeter
Primary Current Injection Test

11kV SWGR - CALIBRATION OF METERS & TRANSDUCERS


2.Calibration of Voltmeter Transducer
DATA:
VT Ratio
Input: Aux. Power supply:
Output:
Voltage applied Transducer Calculated
Sl.No. Phase % Error
V output mA output mA
1 R
2 R
3 R
4 R
5 S
6 S
7 S
8 S
9 T
10 T
11 T
12 T
3. Calibration of Watt Transducer
DATA: INPUT: Volts (V): OUTPUT: VT Ratio
Ampere (I): CT Ratio: Aux. Supply

Current
Voltage applied Transducer Calculated output
Sl.No. injected PF % Error
V output mA mA
A
1
2
3

COMMENTS:

Accepted by Name Signature Date