GHAI & ASSOCIATES ( ARCHITECTS )

DAILY REPORT

DATE : 15JUN 2009 to 15 DEC 2009 Name : Vinod Kumar

DATE PROJECT NAME WORK

15-Jun-09 INTRODUCTION TO PROJECTS INTRODUCTION TO PROJECTS


16-Jun-09 RESIDENCE FOR MR. KK RASIWASIA, CONCEPTUAL PLAN DRAFT
23-71 PUNJABI BAGH WEST N.DELHI
17-Jun-09 RESIDENCE FOR MR. KK RASIWASIA, WORKED ON CONCEPTUAL PLAN &
23-71 PUNJABI BAGH WEST N.DELHI ELEVATION
18-Jun-09 RESIDENCE FOR MR. KK RASIWASIA, PLAN & ELEVATION DRAFTING
23-71 PUNJABI BAGH WEST N.DELHI
19-Jun-09 RESIDENCE ,D 130/131 CHHATERPUR SITE VISIT , MEASUREMENT OF SITE,
EXT.FOR MR. I.N. MUKHARJEE PHOTOGRAFS OF SITE
20-Jun-09 RESIDENCE ,D 130/131 CHHATERPUR SITE DRAFTING
EXT.FOR MR. I.N. MUKHARJEE
21-Jun-09 SUNDAY
22-Jun-09 RESIDENCE ,D 130/131 CHHATERPUR WORKOUT THE CONCEPTUAL DESIGN
EXT.FOR MR. I.N. MUKHARJEE
23-Jun-09 RESIDENCE ,D 130/131 CHHATERPUR DRAFTED THE CONCEPTUAL PLAN
EXT.FOR MR. I.N. MUKHARJEE
24-Jun-09 RESIDENCE ,D 130/131 CHHATERPUR WORK OUT DIFFERENT DESIGN
EXT.FOR MR. I.N. MUKHARJEE SCHEME
25-Jun-09 RESIDENCE ,D 130/131 CHHATERPUR DRAFTED ALL THE SCHEMES
EXT.FOR MR. I.N. MUKHARJEE
26-Jun-09 RESIDENCE ,D 130/131 CHHATERPUR WORKED ON PRESENTATION DRAWING
EXT.FOR MR. I.N. MUKHARJEE
27-Jun-09 RESIDENCE ,D 130/131 CHHATERPUR COMPLETE THE PRESENTATION
EXT.FOR MR. I.N. MUKHARJEE DRAWING
28-Jun-09
SUNDAY
29-Jun-09 RESIDENCE ,D 130/131 CHHATERPUR WORK ON ANOTHER DESIGN SHEME
EXT.FOR MR. I.N. MUKHARJEE

30-Jun-09 RESIDENCE ,D 130/131 CHHATERPUR WORK ON PLANS AS / DELHI BUILDING


EXT.FOR MR. I.N. MUKHARJEE BYE LAWS & AREA CALCULATION.

1-Jul-09 RESIDENCE AT A 149 VIKASPURI,FOR WORK ON FLOOR PLANS


DR. MANU GUPTA

2-Jul-09 RESIDENCE AT A 149 VIKASPURI,FOR WORK ON FLOOR PLANS


DR. MANU GUPTA

3-Jul-09 RESIDENCE AT A 149 VIKASPURI,FOR WORK ON FLOOR PLANS


DR. MANU GUPTA

4-Jul-09 RESIDENCE AT A 149 VIKASPURI,FOR WORK ON FLOOR PLANS


DR. MANU GUPTA
5-Jul-09
SUNDAY
6-Jul-09 RESIDENCE AT C -26 VIKASPURI NEW WORK ON FLOORING PATTERN OF
DELHI FIRST FLOOR
7-Jul-09 RESIDENCE AT C -26 VIKASPURI NEW WORK ON FLOORING PATTERN OF
DELHI FIRST FLOOR
8-Jul-09 RESIDENCE AT C -26 VIKASPURI NEW KITCHEN CUPBOARD DETAIL
DELHI
9-Jul-09 RESIDENCE AT C -26 VIKASPURI NEW MASTERBED ROOM CUPBOARD DEATIL
DELHI
10-Jul-09 RESIDENCE AT 39'90' A1 MEERA BAGH WORK ON CONCEPTUAL DESIGN
FOR DR BAJAJ

11-Jul-09 RESIDENCE AT 39'90' A1 MEERA BAGH WORK ON GROUND FLOOR


FOR DR BAJAJ
12-Jul-09
SUNDAY
13-Jul-09 RESIDENCE AT 39'90' A1 MEERA BAGH WORK ON FIRST AND SECOND FLOOR
FOR DR BAJAJ
14-Jul-09 RESIDENCE AT 39'90' A1 MEERA BAGH WORK ON CONCEPTUAL ELEVATION
FOR DR BAJAJ
15-Jul-09 RESIDENCE AT 39'90' A1 MEERA BAGH WORK ON CONCEPTUAL ELEVATION
FOR DR BAJAJ
16-Jul-09 RESIDENCE AT 39'90' A1 MEERA BAGH DRAFETD ALL PLAN AND ELEATION
FOR DR BAJAJ
17-Jul-09 RESIDENCE AT 39'90' A1 MEERA BAGH DRAFETD CHANGES IN PLAN AND
FOR DR BAJAJ ELEATION

18-Jul-09 RESIDENCE AT 39'90' A1 MEERA BAGH WORK ON PRESENTAITON DRAWING


FOR DR BAJAJ
19-Jul-09
SUNDAY
20-Jul-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON CHANGES IN PREVIOUS
EXT N. DELHI,FOR SANJEEV NANDA DRAFTED PLANS.

21-Jul-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON CONCEPTUAL ELEVATION


EXT N. DELHI,FOR SANJEEV NANDA

22-Jul-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON CONCEPTUAL ELEVATION


EXT N. DELHI,FOR SANJEEV NANDA

23-Jul-09 RESIDENCE AT 14 6 PUNJABI BAGH DRAFTED FRONT AND REAR


EXT N. DELHI,FOR SANJEEV NANDA ELEVATION

24-Jul-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON SECTIONS


EXT N. DELHI,FOR SANJEEV NANDA
25-Jul-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON SECTIONS
EXT N. DELHI,FOR SANJEEV NANDA
26-Jul-09
SUNDAY
27-Jul-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON SUBMISSION DRAWINGS
EXT N. DELHI,FOR SANJEEV NANDA

28-Jul-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON SUBMISSION DRAWINGS


EXT N. DELHI,FOR SANJEEV NANDA
29-Jul-09 RESIDENCE AT HARCHARANBAGH, WORK ON INTERIORS
NEW DELHI
30-Jul-09 RESIDENCE AT HARCHARANBAGH, WORK ON INTERIORS OF BED ROOMS
NEW DELHI
31-Jul-09 RESIDENCE AT HARCHARANBAGH, WORK ON FURNITUREDESIGN AND
NEW DELHI DETAILS
1-Aug-09 RESIDENCE AT C -26 VIKASPURI NEW WORK ON FLOORING PATTERN OF
DELHI FIRST FLOOR
2-Aug-09
SUNDAY
3-Aug-09 RESIDENCE AT 14 6 PUNJABI BAGH STARTED WORK ON WORKING
EXT N. DELHI,FOR SANJEEV NANDA DRAWING
4-Aug-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON BASEMENT AND GROUND
EXT N. DELHI,FOR SANJEEV NANDA FLOOR

5-Aug-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON FIRST FLOOR


EXT N. DELHI,FOR SANJEEV NANDA

6-Aug-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON SECOND FLOOR


EXT N. DELHI,FOR SANJEEV NANDA
7-Aug-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED THIRD FLOOR
EXT N. DELHI,FOR SANJEEV NANDA
8-Aug-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON FONDATION
EXT N. DELHI,FOR SANJEEV NANDA
9-Aug-09
SUNDAY
10-Aug-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON FOUNDATION
EXT N. DELHI,FOR SANJEEV NANDA
11-Aug-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON ELEVATION
EXT N. DELHI,FOR SANJEEV NANDA

12-Aug-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON ELEVATION


EXT N. DELHI,FOR SANJEEV NANDA

13-Aug-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON SECTIONS


EXT N. DELHI,FOR SANJEEV NANDA

14-Aug-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON SECTIONS


EXT N. DELHI,FOR SANJEEV NANDA

15-Aug-09
INDEPENDENCE DAY
16-Aug-09
SUNDAY
17-Aug-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON STAIRCASE DETAIL
EXT N. DELHI,FOR SANJEEV NANDA
18-Aug-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON STAIRCASE DETAIL
EXT N. DELHI,FOR SANJEEV NANDA

19-Aug-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON STAIRCASE DETAIL


EXT N. DELHI,FOR SANJEEV NANDA

20-Aug-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON KITCHEN DETAIL


EXT N. DELHI,FOR SANJEEV NANDA

21-Aug-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON KITCHEN DETAIL


EXT N. DELHI,FOR SANJEEV NANDA

22-Aug-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON TOILET DETAIL


EXT N. DELHI,FOR SANJEEV NANDA

23-Aug-09
SUNDAY
24-Aug-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON PLUMBING GROUND
EXT N. DELHI,FOR SANJEEV NANDA FLOOR & FIRST FLOOR

25-Aug-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON PLUMBING SECOND


EXT N. DELHI,FOR SANJEEV NANDA FLOOR & THIRD FLOOR PLAN

26-Aug-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON ELECTRICAL LAYOUT OF


EXT N. DELHI,FOR SANJEEV NANDA GROUND FLOOR

27-Aug-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON ELECTRICAL LAYOUT OF


EXT N. DELHI,FOR SANJEEV NANDA FIRST FLOOR

28-Aug-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON ELECTRICAL LAYOUT OF


EXT N. DELHI,FOR SANJEEV NANDA SECOND FLOOR
29-Aug-09 RESIDENCE AT 14 6 PUNJABI BAGH CORRECTION IN ELECTRICAL LAYOUT
EXT N. DELHI,FOR SANJEEV NANDA OF ALL FLOORS
30-Aug-09
SUNDAY
31-Aug-09 RESIDENCE AT 14 6 PUNJABI BAGH CORRECTION IN FOUNDATION PLAN &
EXT N. DELHI,FOR SANJEEV NANDA SECTION OF COLUMNS.
1-Sep-09 RESIDENCE AT 14 6 PUNJABI BAGH STRUCTURE DRAWING - BASEMENT
EXT N. DELHI,FOR SANJEEV NANDA ROOF
2-Sep-09 RESIDENCE AT 14 6 PUNJABI BAGH STRUCTURE DRAWING - BASEMENT
EXT N. DELHI,FOR SANJEEV NANDA ROOF

3-Sep-09 RESIDENCE AT 14 6 PUNJABI BAGH CORRECTION IN STRUCTURE DRAWING


EXT N. DELHI,FOR SANJEEV NANDA - BASEMENT ROOF

4-Sep-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON STRUCTURE DRAWING -


EXT N. DELHI,FOR SANJEEV NANDA GROUND FLOOR ROOF

5-Sep-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON STRUCTURE DRAWING -


EXT N. DELHI,FOR SANJEEV NANDA GROUND FLOOR ROOF

6-Sep-09
SUNDAY

7-Sep-09 RESIDENCE AT 14 6 PUNJABI BAGH CORRECTION IN STRUCTURE


EXT N. DELHI,FOR SANJEEV NANDA DRAWING - GROUND FLOOR ROOF

8-Sep-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED THE SECTION & ELEVATION


EXT N. DELHI,FOR SANJEEV NANDA OF BEAMS IN STRUCTURE DRAWING

9-Sep-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED THE SECTION & ELEVATION


EXT N. DELHI,FOR SANJEEV NANDA OF BEAMS IN STRUCTURE DRAWING

10-Sep-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON STRUCTURE DRAWING -


EXT N. DELHI,FOR SANJEEV NANDA FIRST FLOOR ROOF

11-Sep-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON STRUCTURE DRAWING -


EXT N. DELHI,FOR SANJEEV NANDA FIRST FLOOR ROOF

12-Sep-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED THE SECTION & ELEVATION


EXT N. DELHI,FOR SANJEEV NANDA OF BEAMS IN STRUCTURE DRAWING

13-Sep-09
SUNDAY
14-Sep-09 RESIDENCE AT 14 6 PUNJABI BAGH CORRECTION IN STRUCTURE DRAWING
EXT N. DELHI,FOR SANJEEV NANDA - FIRST FLOOR ROOF

15-Sep-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON STRUCTURE DRAWING -


EXT N. DELHI,FOR SANJEEV NANDA SECOND FLOOR ROOF
16-Sep-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON STRUCTURE DRAWING -
EXT N. DELHI,FOR SANJEEV NANDA SECOND FLOOR ROOF

17-Sep-09 RESIDENCE AT 14 6 PUNJABI BAGH CORRECTION IN STRUCTURE DRAWING


EXT N. DELHI,FOR SANJEEV NANDA - SECOND FLOOR ROOF

18-Sep-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKOUT THE SECTION & ELEVATION


EXT N. DELHI,FOR SANJEEV NANDA OF BEAMS IN STRUCTURE DRAWING

19-Sep-09 RESIDENCE AT 14 6 PUNJABI BAGH CORRECTION IN STRUCTURE DRAWING


EXT N. DELHI,FOR SANJEEV NANDA - ROOF & BEAM ELV. ,SEC. OF S.F.

20-Sep-09 SUNDAY
21-Sep-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON STRUCTURE DRAWING -
EXT N. DELHI,FOR SANJEEV NANDA THIRD FLOOR ROOF

22-Sep-09 RESIDENCE AT 14 6 PUNJABI BAGH CORRECTION IN STRUCTURE DRAWING


EXT N. DELHI,FOR SANJEEV NANDA - THIRD FLOOR ROOF
23-Sep-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON DOOR AND WINDOW
EXT N. DELHI,FOR SANJEEV NANDA SCHEDULE & DETAIL

24-Sep-09 RESIDENCE AT 14 6 PUNJABI BAGH WORKED ON DOOR AND WINDOW


EXT N. DELHI,FOR SANJEEV NANDA SCHEDULE & DETAIL DRAWING

25-Sep-09 RESIDENCE AT 14 6 PUNJABI BAGH CORRECTION IN DOOR AND WINDOW


EXT N. DELHI,FOR SANJEEV NANDA SCHEDULE & DETAIL DRAWING

26-Sep-09
DURGA POOJA VACATION
27-Sep-09
SUNDAY
28-Sep-09
DURGA POOJA VACATION
29-Sep-09
DURGA POOJA VACATION
30-Sep-09
DURGA POOJA VACATION
1-Oct-09 RESID. FOR SMT. KAMALANANDA,V- 58 CORRECTIONS AND UPDATING THE
C RAJOURI GARDEN, NEW DELHI SUMISSION DRAWINGS.
2-Oct-09
GANDHI JAYANTI
3-Oct-09 RESID. FOR SMT. KAMALANANDA,V- 58 CORRECTIONS AND UPDATING THE
C RAJOURI GARDEN, NEW DELHI SUMISSION DRAWINGS.
4-Oct-09
SUNDAY
5-Oct-09 RESID. FOR SMT. KAMALANANDA,V- 58 WORKING DRAWING - CORRECTION OF
C RAJOURI GARDEN, NEW DELHI COLUMN POSITION IN PLANS

6-Oct-09 RESID. FOR SMT. KAMALANANDA,V- 58 WORKING DRAWING - FOUNDATION


C RAJOURI GARDEN, NEW DELHI DETAIL DRAWING

7-Oct-09 RESID. FOR SMT. KAMALANANDA,V- 58 WORKING DRAWING - FOUNDATION


C RAJOURI GARDEN, NEW DELHI DETAIL DRAWING

8-Oct-09 RESID. FOR SMT. KAMALANANDA,V- 58 WORKING DRAWING - EXCAVATION


C RAJOURI GARDEN, NEW DELHI PLAN & SCHEDULE OF COLUMNS
9-Oct-09 RESID. FOR SMT. KAMALANANDA,V- 58 WORKING DRAWING - EXCAVATION
C RAJOURI GARDEN, NEW DELHI PLAN & SCHEDULE OF COLUMNS

10-Oct-09 RESID. FOR SMT. KAMALANANDA,V- 58 CORRECTION IN EXCAVATION PLAN &


C RAJOURI GARDEN, NEW DELHI SCHEDULE OF COLUMNS
11-Oct-09
SUNDAY
12-Oct-09 RESID. FOR SMT. KAMALANANDA,V- 58 WORKING DRAWING - STILT & GROUND
C RAJOURI GARDEN, NEW DELHI FLOOR

13-Oct-09 RESID. FOR SMT. KAMALANANDA,V- 58 WORKING DRAWING - FIRST ,SECOND


C RAJOURI GARDEN, NEW DELHI FLOOR PLAN

14-Oct-09 RESID. FOR SMT. KAMALANANDA,V- 58 STRUCTURE DRAWING - STILT ROOF


C RAJOURI GARDEN, NEW DELHI PLAN.
15-Oct-09 RESID. FOR SMT. KAMALANANDA,V- 58 STRUCTURE DRAWING - STILT ROOF
C RAJOURI GARDEN, NEW DELHI PLAN.
16-Oct-09 RESID. FOR SMT. KAMALANANDA,V- 58 CORRECTION IN STRUCTURE DRAWING
C RAJOURI GARDEN, NEW DELHI - STILT ROOF PLAN.

17-Oct-09
DIWALI
18-Oct-09
SUNDAY
19-Oct-09 RESID. FOR SMT. KAMALANANDA,V- 58 PLUMBING DRAWING - GROUND
C RAJOURI GARDEN, NEW DELHI ,FIRST,SECOND FLOOR PLAN
20-Oct-09 RESID. FOR SMT. KAMALANANDA,V- 58 CORRECTION IN PLUMBING DRAWING -
C RAJOURI GARDEN, NEW DELHI GROUND ,FIRST,SECOND FLOOR PLAN

21-Oct-09 RESID. FOR SMT. KAMALANANDA,V- 58 WORKED ON ELECTRICAL LAOUTS OF


C RAJOURI GARDEN, NEW DELHI STILT & GROUND FLOOR PLAN

22-Oct-09 RESID. FOR SMT. KAMALANANDA,V- 58 CORRECTION IN ELECTRICAL LAOUTS


C RAJOURI GARDEN, NEW DELHI OF & GROUND FLOOR PLAN

23-Oct-09 RESID. FOR SMT. KAMALANANDA,V- 58 WORKED ON ELECTRICAL LAOUTS OF


C RAJOURI GARDEN, NEW DELHI FIRST ,SECOND & TERRACE PLAN

24-Oct-09 RESID. FOR SMT. KAMALANANDA,V- 58 CORRECTION IN ELECTRICAL LAOUTS


C RAJOURI GARDEN, NEW DELHI FIRST,SECOND & TERRACE PLAN
25-Oct-09
SUNDAY
26-Oct-09 RESID. FOR SMT. KAMALANANDA,V- 58 WORKING ON ELEVATION
C RAJOURI GARDEN, NEW DELHI

27-Oct-09 RESID. FOR SMT. KAMALANANDA,V- 58 WORKING ON ELEVATION


C RAJOURI GARDEN, NEW DELHI
28-Oct-09 RESID. FOR SMT. KAMALANANDA,V- 58 WORKING ON SECTION
C RAJOURI GARDEN, NEW DELHI

29-Oct-09 RESID. FOR SMT. KAMALANANDA,V- 58 WORKING ON SECTION


C RAJOURI GARDEN, NEW DELHI

30-Oct-09 RESID. FOR SMT. KAMALANANDA,V- 58 WORKING ON STAIRCASE DETAIL


C RAJOURI GARDEN, NEW DELHI

31-Oct-09 RESID. FOR SMT. KAMALANANDA,V- 58 WORKING ON STAIRCASE DETAIL


C RAJOURI GARDEN, NEW DELHI

1-Nov-09
SUNDAY
2-Nov-09 RESID. FOR L/22 A MALVILA NAGAR , DRAFTING WORK OF SUBMISSION
NEW DELHI DRAWING
3-Nov-09 RESID. FOR L/22 A MALVILA NAGAR , DRAFTING WORK OF SUBMISSION
NEW DELHI DRAWING
4-Nov-09 RESIDENCE 1,ANSARI WORKED ON CONCEPTUAL PLAN &
ROAD,DARYAGANJ,NEW DELHI AREA CALCULATION AS/ BYE LAWS
5-Nov-09 RESIDENCE 1,ANSARI WORKED ON SCHEME NO. 01
ROAD,DARYAGANJ,NEW DELHI
6-Nov-09 RESIDENCE 1,ANSARI WORKED ON SCHEME NO. 02
ROAD,DARYAGANJ,NEW DELHI
7-Nov-09 RESIDENCE 1,ANSARI WORKED ON SCHEME NO. 03
ROAD,DARYAGANJ,NEW DELHI
8-Nov-09
SUNDAY
9-Nov-09 RESIDENCE 1,ANSARI COMPILATION OF ALL THE SCHEMES
ROAD,DARYAGANJ,NEW DELHI AND MADE PRESENTATION DRG.
10-Nov-09 RESIDENCE 1,ANSARI PRESENTATION DRG. FOR ALL THE
ROAD,DARYAGANJ,NEW DELHI FLOORS
11-Nov-09 RESIDENCE 1,ANSARI SUBMISSION DRG - BASEMENT,G.F.
ROAD,DARYAGANJ,NEW DELHI
12-Nov-09 RESIDENCE 1,ANSARI SUBMISSION DRG - FIRST ,SECOND
ROAD,DARYAGANJ,NEW DELHI FLOOR & THIRD FLOOR PLAN.
13-Nov-09 RESIDENCE 1,ANSARI ELEVATION - FRONT & REAR
ROAD,DARYAGANJ,NEW DELHI

14-Nov-09 RESIDENCE 1,ANSARI SECTIONS


ROAD,DARYAGANJ,NEW DELHI
15-Nov-09
SUNDAY
16-Nov-09 RESIDENCE 1,ANSARI SITE PLAN ,LOCATION PLAN ,AREA
ROAD,DARYAGANJ,NEW DELHI CALCULATION
17-Nov-09 RESIDENCE 1,ANSARI COMPILATION OF SUBMISSION DRG.
ROAD,DARYAGANJ,NEW DELHI
18-Nov-09 RESIDENCE FOR BRG. LAROIYA ,AT WORKED ON CONCEPTUAL PLAN &
SHANTINIKETAN ,NEW DELHI AREA CALCULATION AS/ BYE LAWS
19-Nov-09 RESIDENCE FOR BRG. LAROIYA ,AT WORKED ON SCHEME NO. 01 & 02
SHANTINIKETAN ,NEW DELHI
20-Nov-09 RESIDENCE FOR BRG. LAROIYA ,AT WORKED ON SCHEME NO.03 & 04
SHANTINIKETAN ,NEW DELHI
21-Nov-09 RESIDENCE FOR BRG. LAROIYA ,AT WORKED ON DUPLEX SCHEME
SHANTINIKETAN ,NEW DELHI
22-Nov-09
SUNDAY
23-Nov-09 RESIDENCE FOR BRG. LAROIYA ,AT WORKED ON SCHEME NO.05
SHANTINIKETAN ,NEW DELHI
24-Nov-09 C.J.S.PUBLIC SCHOOL AT AMRITSER WORKED ON PRESENTATION DRAWING
BYEPASS ROAD,JALANDHAR
25-Nov-09 C.J.S.PUBLIC SCHOOL AT AMRITSER WORKED ON PRESENTATION DRAWING
BYEPASS ROAD,JALANDHAR

26-Nov-09 C.J.S.PUBLIC SCHOOL AT AMRITSER WORKED ON PRESENTATION DRAWING


BYEPASS ROAD,JALANDHAR

27-Nov-09 C.J.S.PUBLIC SCHOOL AT AMRITSER WORKED ON WORKING DRAWING -


BYEPASS ROAD,JALANDHAR GROUND FLOOR

28-Nov-09 C.J.S.PUBLIC SCHOOL AT AMRITSER WORKED ON WORKING DRAWING -


BYEPASS ROAD,JALANDHAR GROUND FLOOR
29-Nov-09 C.J.S.PUBLIC SCHOOL AT AMRITSER WORKED ON WORKING DRAWING -
BYEPASS ROAD,JALANDHAR FIRST FLOOR
30-Nov-09
SUNDAY
1-Dec-09 C.J.S.PUBLIC SCHOOL AT AMRITSER WORKED ON WORKING DRAWING -
BYEPASS ROAD,JALANDHAR FOUNDATION DEATIL
2-Dec-09 C.J.S.PUBLIC SCHOOL AT AMRITSER WORKED ON WORKING DRAWING -
BYEPASS ROAD,JALANDHAR FOUNDATION DEATIL
3-Dec-09 C.J.S.PUBLIC SCHOOL AT AMRITSER WORKED ON CHANGES IN PREVIOUS
BYEPASS ROAD,JALANDHAR DRAFTED PLANS.

4-Dec-09 C.J.S.PUBLIC SCHOOL AT AMRITSER WORKED ON CONCEPTUAL ELEVATION


BYEPASS ROAD,JALANDHAR

5-Dec-09 C.J.S.PUBLIC SCHOOL AT AMRITSER WORKED ON CONCEPTUAL ELEVATION


BYEPASS ROAD,JALANDHAR
6-Dec-09 SUNDAY
7-Dec-09 C.J.S.PUBLIC SCHOOL AT AMRITSER DRAFTED THE ELEVATION
BYEPASS ROAD,JALANDHAR
8-Dec-09 C.J.S.PUBLIC SCHOOL AT AMRITSER DRAFTED THE ELEVATION
BYEPASS ROAD,JALANDHAR
9-Dec-09 C.J.S.PUBLIC SCHOOL AT AMRITSER DRAFTED THE PLUMBING PLAN
BYEPASS ROAD,JALANDHAR
10-Dec-09 C.J.S.PUBLIC SCHOOL AT AMRITSER DRAFTED THE PLUMBING PLAN
BYEPASS ROAD,JALANDHAR

11-Dec-09 C.J.S.PUBLIC SCHOOL AT AMRITSER ELECTRICAL DRAWING


BYEPASS ROAD,JALANDHAR
12-Dec-09 C.J.S.PUBLIC SCHOOL AT AMRITSER WORKED ON DOOR & WINDOW
BYEPASS ROAD,JALANDHAR SCHEDULE
13-Dec-09
SUNDAY

14-Dec-09 C.J.S.PUBLIC SCHOOL AT AMRITSER WORKED ON MULTIPURPOSE HALL -


BYEPASS ROAD,JALANDHAR PLAN
15-Dec-09 C.J.S.PUBLIC SCHOOL AT AMRITSER WORKED ON MULTIPURPOSE HALL -
BYEPASS ROAD,JALANDHAR ELEVATION & DETAIL

SIGNATURE OF STUDENT SIGNATURE OF PROP.


Remarks