Material Unit Qty Unit rate in( Birr)

*SAND m3 37987 40
*CEMENT Ton 36570 3300
*GRAVEL m3 51,343 130
* Pumice m3 4959 180
*Reinforcing Steel Bar Ton 7025 15300
* Ega Sheet m2 6914 165
* Selected material m3 108582 55
*water m3 21621 100
* Form work m2 143571 135
* Paint lit 3881 45
* civil Steel structure Ton 2057 23800
* Door & Windows Pcs 157 2500
* water Proof m2 2197 220
* Steel Insurts including fabrication & instalation Ton 310 23000
* Solid Brick of size 20cm x 20cm x 9cm Pcs 511111 8
* HBC Pcs 179400 10
*Timber of different size m3 800 5000
*Scaffolding tubes Ton 850 17000
*Clamps Pcs 150000 33
Total Const.Material
Total (Birr)
1,519,480.00
120,681,000.00
6,674,590.00
892,620.00
107,482,500.00
1,140,810.00
5,972,010.00
2,162,100.00
19,382,085.00
174,645.00
48,956,600.00
392,500.00
483,340.00
7,130,000.00
4,088,888.00
1,794,000.00
4,000,000.00
14,450,000.00
4,950,000.00
352,327,168.00