Sie sind auf Seite 1von 1

~{A,Vfu.

6
4-t1A 'IUAh-J-ApAlL'l.eo7 \

Con.1409-07. 88-5852
(3 Hours) [Total Marks:'1 00
N.8.: (1) Question NO.1 is compulsory.
(2) Answer any four questions from the remaining six questions.
(3) All questions carry equal marks (Le. 20 each).
(4) Answersto group all sub-questions and writtenone after another.
(5) Draw neat sketches to explainyour answers.

/write short notes on any four of the following:


vfc15J Reverberation time and its effect
v(b) JTypes of filters in ventilation system in brief
;jC) ,/Sound shadow and .sound focus in auditorium
(d) Fire rating of materials .

~ v1nsulation for hot water supply.


2. Explain in detail with sketches the central water heating system using two-pipe indirect system for
a ground and two storey building located in cold climatic region.

f What are the various factors to be ,considered while designing highrise public buildings from the ""r

point of view of fire fighting, and safety norms. Explain in detail with sketches.) I' , L\-
L\(, , '
1 ,
J. Explain with examples the two airconditioning systems viz. chilled water system and air-expansion
system for their advantages or dis-advantages over the other.

~ Explain with sketches the design of a recording studio with reference to detai~sto avoid structure-
bound sound, and provisions of various absorptive and reflective surfaces. Also explain transmission
of sound at various levels.

/I Write short notes on any four of


(a)
following:
Different ventilation systems in brief
,)!J) Sabines formula in acoustics
~ Echo and its prevention
,Jd) Fire Hydrants and fire tants (underground)
(e) Importance of A.H.U. and their locations.
....

7.
Draw neat plan, sections and details of an underground car park in a highrise building admeasuring
40m x 70m, for ventilation. What types of fans and filters will be required for proper system?
*********

Das könnte Ihnen auch gefallen