The Relief Center

Urban Missions Base


Building Project

Waste Removal 1365


Demolition labor- Garage 600
Framing Labor - exterior wall 810
Exterior Door including frame 250
Heating and Ventilation-KCH 30,030 TIME SENSITIVE OPPORTUNITY
Plumbing Fixtures- 3 toilets, 4 sinks, 6 Because Servant’s Heart Ministry is
showers 4,830 offering all of the volunteer labor, the
Plumbing Fixtures- Tankless Hot Water total cost for the project can be cut down
Heater 4,025 to as little as $80,000. That’s a savings of
Plumbing Sub-trano 14,000 over $50,000 in labor!
Electrical Materials 21,000
Electrical There is a window of opportunity during
Insulation materials 550 these winter months to push forward on
Insulation labor 600 the project while these many volunteer
Drywall finished for Painting 3,000 contractors have less work and more
Finish materials 2-1/2 colonial casing
time to donate.
(FJP) 700
Interior doors - pre-hung solid-core
birch door 3,780 We need the following in order to keep
Finished carpentry Labor - daily rate 5,400 these skilled volunteer laborers working:
Drop ceiling 2x4 grid and tile materials 8,600
Supply and install carpet 14,000 Materials Needed PHASE 1
Cabinetry- Kitchen base cabinets 1,000 HVAC $20,000
Labor to install cabinets 540 Electrical/lighting $6,000
Countertop - plastic laminate 200 Plumbing $13,000
Appliances - refrigerator, dishwasher, Framing/insulation $2,000
range/oven 1,500 Spackling/inner doors $6,000
Tile materials - kitchen floor 4,600 Subtotal $47,000
Tile provide proper adhesive and labor
Progress
to install 6,000 Materials Needed PHASE 2
Majority
Painting-of building
Interior is framed.
Priming only Plumbing 3,200 Paint $6,000
excavation completed. Plumbing lines run to 2 of
$130,5 Ceiling $9,000
3TOTAL
bathrooms. Bathrooms are tiled. Electrical80 lines Flooring $14,000
partially run. Cabinetry $1,000
Finishing work/appliances $3,000
Materials purchased: Subtotal $33,000
Lumber, plumbing, electrical, waste removal
$18,000

Servant’s Heart Ministry


Volunteer labor value: $19,000

Materials donated:
Tiles, plumbing, doors, windows
$14,000