Annex D to Certificate of Completion and Inspection for Sanitary works

HYDROSTATIC TESTS FOR SANITARY DRAINLINES & SEWERS


Department File Ref. Project Ref No.9090544 (previous known as Contract no. 1080282)

Project Title: Diversion of Flow and Demolition of Tuas View Pump Sump and Other Pumping Installations

Name of Qualified Person: Name of Eng Seng Construction (Pte) Ltd.


Plumber / Contractor:

(1) Below are the details of water tests carried out on sanitary drainlines, sewer, inspection chambers and manholes for that above project.

S/No. Sewer line (eg. MH No -MH No) / Dia./Type of length of Rate of water Date of Name of Remark
Sewer Connection (IC to pipe (eg. Pipe loss (liter/sec) water test person
MH/Sewer)/ Sanitary Φ200/VCP, line(m) & result (dd/mm/yy) witnessed the
Drainline(IC no. to IC no.)/ Φ150/Upvc ) (Passed/Failed) water test
Inspection Chamber / Manhole
1 Manhole MH-L1 (FID-1874537)Dia -1500mm NA 0.0005 liter/sec 25/10/2010 Justin Autry
at Loyang Ave. (Passed) (RTO)
2
3
4
5
6
7
8
9

(2) I certify that the sanitary drainage system including the sewer connection line and inspection chambers; sewers and manholes comply with the
hydrostatic test requirements as specified in the Code of Practice on Sewerage and Sanitary Works.

(Stamp and Signature of QP) (Signature of RTO) (Signature of Contractor)