Project Title: Diversion of Flow and Demolition of Tuas View Pump Sump and Other Pumping Installations
(1) Below are the details of water tests carried out on sanitary drainlines, sewer, inspection chambers and manholes for that above project.
S/No. Sewer line (eg. MH No -MH No) / Dia./Type of length of Rate of water Date of Name of Remark
Sewer Connection (IC to pipe (eg. Pipe loss (liter/sec) water test person
MH/Sewer)/ Sanitary Φ200/VCP, line(m) & result (dd/mm/yy) witnessed the
Drainline(IC no. to IC no.)/ Φ150/Upvc ) (Passed/Failed) water test
Inspection Chamber / Manhole
1 Manhole MH-L1 (FID-1874537)Dia -1500mm NA 0.0005 liter/sec 25/10/2010 Justin Autry
at Loyang Ave. (Passed) (RTO)
2
3
4
5
6
7
8
9
(2) I certify that the sanitary drainage system including the sewer connection line and inspection chambers; sewers and manholes comply with the
hydrostatic test requirements as specified in the Code of Practice on Sewerage and Sanitary Works.