0 Bewertungen0% fanden dieses Dokument nützlich (0 Abstimmungen)
10 Ansichten1 Seite
This document calculates cycle time for a production process. It determines that with a product demand of 32,000, a batch size of 24,000, requiring 1.33 batches, and 24 hours available for production, the cycle time is 18 hours per batch or 0.75 days per batch.
This document calculates cycle time for a production process. It determines that with a product demand of 32,000, a batch size of 24,000, requiring 1.33 batches, and 24 hours available for production, the cycle time is 18 hours per batch or 0.75 days per batch.
Copyright:
Attribution Non-Commercial (BY-NC)
Verfügbare Formate
Als XLSX, PDF, TXT herunterladen oder online auf Scribd lesen
This document calculates cycle time for a production process. It determines that with a product demand of 32,000, a batch size of 24,000, requiring 1.33 batches, and 24 hours available for production, the cycle time is 18 hours per batch or 0.75 days per batch.
Copyright:
Attribution Non-Commercial (BY-NC)
Verfügbare Formate
Als XLSX, PDF, TXT herunterladen oder online auf Scribd lesen