Sie sind auf Seite 1von 2

STANDARD WORK COMBINATION SHEET (SWCS)

PART NUMBER OPERATION NUMBER REV. LETTER SUM. LETTER DATE OPERATOR MANUAL
AUTOMATIC
PART NAME DEPARTMENT NUMBER / NAME PREPARED BY TAKT TIME WALK VVVVVVVVVV
WAIT

STEP PCS /
MAN - TASK TIME : 1 LINE = ________ MINUTES SECONDS
DESCRIPTION OF TASK MACH MAN AUTO WALK
NO. LOAD
CAP

TOTAL

TIME PER PIECE USE MINUTES PER PIECE FOR STANDARD WORK DATABASE

ENTRY
1. Fill in information
STANDARD WORK COMBINATION SHEET (SWCS)
PART NUMBER OPERATION NUMBER REV. LETTER SUM. LETTER DATE OPERATOR MANUAL
For Std. Work AUTOMATIC
PART NAME Measurement Only
DEPARTMENT NUMBER / NAME PREPARED BY TAKT TIME WALK VVVVVVVVVV
WAIT

STEP PCS /
MAN - TASK TIME : 1 LINE = ________ MINUTES SECONDS
DESCRIPTION OF TASK MACH MAN AUTO WALK
NO. LOAD
CAP

2. Insert task from time


observation
4. Set scale based on
total time

3. Fill in time and


compute total time

6. Graph according to legend

5. Takt time is RED line

TOTAL

TIME PER PIECE USE MINUTES PER PIECE FOR STANDARD WORK DATABASE

ENTRY

Das könnte Ihnen auch gefallen