Question This Question refers to the case of 'Hansa Tractomotive Ltd.' :
After completion of manufacturing, Jay Jee took following actions
:-
Correct Answer Dispatched the consignment by Express Roadlines by truck ,
Raised the Hundi for the invoiced amount , Did not send the
consignment by Hansa's designated carrier
Your Answer Did not send the consignment by Hansa's designated carrier ,
Dispatched the consignment by Express Roadlines by truck ,
Raised the Hundi for the invoiced amount

Multiple Choice Single Answer


Question This Question refers to the case of 'Universal Fasteners Ltd.' :
During the meeting with G.M (Mr. Kaul) Store Keeper Mr. Bapat
informed that purchases were made from :-
Correct Answer Several sources

Your Answer Several sources

Multiple Choice Single Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' :
One of the following is not a variable overhead:-
Correct Answer Space

Your Answer Space

True/False
Question This Question refers to 'Uday Electroplating Shop' : As per cost
figures collected, Expected volume of work on special equipment
next year is 10,000 Nos.
Correct Answer True

Your Answer True

Multiple Choice Single Answer


Question This Question refers to the case of Narmada Electricals Ltd.: In
the existing method, the scarp generated in processes like
machining was stored in :-
Correct Answer Scrap yard

Your Answer Scrap yard

Match The Following


Question Correct Answer Your Answer
Anonymous letter Need to justify Need to justify
received by M.D.
This question refers to the Seen in top hotels with No material facts to
case of 'Northern suppliers support the arguments
Machinery Ltd.' : Senior
buyers
Reason for failure to No material facts to No confidence in Material
convince the Board of support the arguments manager and Senior
Directors buyers
Lot of items on the Need to be concise and to Need to be concise and to
agenda the point the point

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Divgi Metalwares Private
Limited' : The new items contracted by the company are handled
by the development department for :-
Correct Answer Submission of samples , Manufacture of one or two production
lots , Transfer to manufacturing department for regular
production, after successful development
Your Answer Submission of samples , Manufacture of one or two production
lots , Transfer to manufacturing department for regular
production, after successful development

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Classic Engineering
Components Ltd.' : The company has well established machine
shop having more than 150 machines and :-
Correct Answer A heat treatment shop , Metrology section , Packing section

Your Answer A heat treatment shop , Metrology section , Packing section

Multiple Choice Single Answer


Question This Question refers to the case of 'The Gujrat Engineering
company Limited' : The company also executes :-
Correct Answer Rush orders

Your Answer Rush orders

Select The Blank


Question This Question refers to 'Uday Electroplating Shop' :The owner
finds it ________ to get part time employees when there is
heavy work load.
Correct Answer Difficult

Your Answer Difficult

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers' :Kalpak
Engineers have contracted from a boiler company manufacturing
of 500 nos of stay bolt. In the manufacturing process grinding
operation is carried out on following machine :-
Correct Answer Cylindrical grinder

Your Answer Cylindrical grinder

Multiple Choice Single Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' :
Process sheet for exhaust manifold provides following
information:-
Correct Answer Jigs and fixtures required

Your Answer Jigs and fixtures required

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Classic Engineering
Components Ltd.' : The company supplies components to :-
Correct Answer Automobile industries , Printing machines , Machine tool &
process equipment industries
Your Answer Automobile industries , Printing machines , Machine tool &
process equipment industries

True/False
Question This Question refers to the case of 'Classic Engineering
Components Ltd.' : Mr. Sen noticed that each worker was
provided with the drawing of the component.
Correct Answer False

Your Answer False

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Eagle Machine Company' :
Cost of running Sally's department is Rs 3,70,000 per year. This
is on account of :-
Correct Answer Salaries , Fringes , Expenses

Your Answer Salaries , Fringes , Expenses

Select The Blank


Question This Question refers to the case 'Quality Gauges Pvt. Ltd.' : After
the introduction of scheme, shop floor manager has complained
of pressure from workmen for ________.
Correct Answer Overtime

Your Answer Overtime


Match The Following
Question Correct Answer Your Answer

Test of viability of Production study Production study


standards
This question refers to Scanlon Plan Predetermined Method
case on 'Morbay Time standards
Engineering Works
(MEW)' : Guaranteed time
wage
Base wage rate Job Evaluation Work Measurement

Fixation of Performance Work Measurement Job Evaluation


standard

Select The Blank


Question This Question refers to the case of 'The Irate Vendor' : Jones
had been brought in by a management consultant to ________
the department's buying activities.
Correct Answer Centralize

Your Answer Centralize

Multiple Choice Single Answer


Question This Question refers to the case of 'Kerson Automobiles' : It was
decided to modify the existing layout of the plant in the year :-
Correct Answer 1972

Your Answer 1972

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Gujrat Engineering
company Limited' : The company has received a special order
where :-
Correct Answer A special cylinder is to be manufactured. , The item is to be
manufactured from a hollow bored forging , Fastest delivery is
requested
Your Answer A special cylinder is to be manufactured. , The item is to be
manufactured from a hollow bored forging , Fastest delivery is
requested

Select The Blank


Question This question refer to the case on "Allied Industries Pvt Ltd" :
One of the assumptions of the case is- other incidental costs
(e.g. paper work, Transport charges for acquiring and regrinding
thread roll) are ________.
Correct Answer Negligible
Your Answer Low

Select The Blank


Question This Question refers to the case of 'Artwood Products' : The
________ furniture is sold through distributors.
Correct Answer Standard

Your Answer Standard

Multiple Choice Single Answer


Question This Question refers to the case of 'Divgi Metalwares Private
Limited' : It is a :-
Correct Answer Light engineering company

Your Answer Light engineering company

True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : The
average efficiency on the other components currently being
produced is around 75%.
Correct Answer True

Your Answer True

Multiple Choice Multiple Answer


Question This Question refers to the case 'Suyog Udyog' : The process
involves the use of :-
Correct Answer HMT M-2V machine , HMT-2U machine , Investa Pillar drill

Your Answer HMT M-2V machine , HMT-2U machine , Investa Pillar drill

Select The Blank


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Jigs
and fixtures once provided will be able to maintain accuracy up
to about ________ pieces.
Correct Answer 20000

Your Answer 20000

True/False
Question This question refers to case on 'Morbay Engineering Works
(MEW)' : "It is difficult to install an incentive scheme and easy to
withdraw when desired."
Correct Answer False

Your Answer True


True/False
Question This Question refers to the case 'Suyog Udyog' : The operation
time for C' sunk 14 dia holes on both sides is 0.50 per piece.
Correct Answer True

Your Answer True

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Geer Company' :
Problems got created due to :-
Correct Answer Added work load in purchasing , Divided buying responsibilities ,
Number of inexperienced buyers
Your Answer Added work load in purchasing , Divided buying responsibilities ,
Number of inexperienced buyers

Multiple Choice Single Answer


Question This Question refers to the case 'Indus Foundries Ltd.': The
company is faced with following problems :-
Correct Answer Choice of Location

Your Answer Choice of Plant machinery

Multiple Choice Multiple Answer


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
Following is the information requirement for using CPM/PERT
techniques:-
Correct Answer List of activities , Activity duration , Precedent relationship of the
activities
Your Answer List of activities , Activity duration , Person responsible for
activity completion

Multiple Choice Single Answer


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : The success of an incentive plan to a large extent
depends on the following factor:-
Correct Answer Quality of performance standard

Your Answer Production Planning and Control system

Multiple Choice Multiple Answer


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : Following systems are prerequisites for an incentive
scheme:-
Correct Answer Good production planning and control system , Good Inspection
and quality control system , Sound system of accounting
operators daily output
Your Answer Good production planning and control system , Good Inspection
and quality control system , Sound system of accounting
operators daily output

Select The Blank


Question This Question refers to the case of 'K.T Gears' : The problem
envisages determining the rate of ________ before and after
improvement in the existing method.
Correct Answer Production

Your Answer Speed

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Geer Company' : The
problems reported are :-
Correct Answer Delays in placing orders , Frequently late deliveries , Incorrect
ordering quantities
Your Answer Delays in placing orders , Frequently late deliveries , Incorrect
ordering quantities

Multiple Choice Single Answer


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : Following practice if prevalent, must be eliminated to
guarantee success of wage incentive scheme :-
Correct Answer Overtime

Your Answer Encashment of leave

True/False
Question This Question refers to the case of 'Universal Fasteners Ltd.' :
The organization has reputation for poor deliveries.
Correct Answer False

Your Answer False

Multiple Choice Single Answer


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
Use of Network Techniques beside computing project duration
also helps in the following :-
Correct Answer Possibilities of reducing project duration

Your Answer Computing manpower requirement

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers' : This case
is concerned with following element of production planning:-
Correct Answer Routing

Your Answer Scheduling


Multiple Choice Single Answer
Question This Question refers to the case of 'Hansa Tractomotive Ltd.' :
The machines were completed by Kay Jee :-
Correct Answer Within the stipulated delivery period

Your Answer Within the stipulated delivery period

Select The Blank


Question This Question refers to the case of 'Kerson Automobiles' : The
pedestal grinder mounted on the huge work table, gives out
________ and blows out dust.
Correct Answer Sparks

Your Answer Sparks

Select The Blank


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : In
machining Exhaust Manifold, no cutting oil is required as the
material is ________.
Correct Answer Cast iron

Your Answer Plastic

Select The Blank


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : Success of wage incentive plans to a large extent
depends on the ________ of performance standards.
Correct Answer Quality

Your Answer Quality

True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : The
cost of foundry reject is borne by the company.
Correct Answer True

Your Answer True

True/ False
Question This question refers to the case of 'Northern Machinery Ltd' : As
per summary of purchases of the last year, Material cost as a
proportion of sales is 26%.
Correct Answer False

Your Answer True


True/False
Question This Question refers to the case 'Quality Gauges Pvt. Ltd.' : The
executives were entitled for incentive bonus.
Correct Answer True

Your Answer True

Select The Blank


Question This Question refers to the case 'Suyog Udyog' : Number of work
stations are to be decided based on assumption that monthly off
take is ________ numbers.
Correct Answer 8000

Your Answer 8000


Cases in Operation Management
LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Multiple Choice Single Answer


Question This Question refers to the case of 'The Irate Vendor' : Tom
Jones has been hired as Purchasing director for a company
which is a :-
Correct Answer Medium sized food products firm

Your Answer Medium sized food products firm

Multiple Choice Single Answer


Question This Question refers to the case of 'Artwood Products' : The
company is engaged in design and manufacture of wooden
furniture. The critical factor in acceptance of furniture is :-
Correct Answer Quality

Your Answer Quality

Select The Blank


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : Overtime must be ________ to guarantee the success
of the wage incentive scheme.
Correct Answer Eliminative

Your Answer Eliminative

True/False
Question This Question refers to the case of 'Hansa Tractomotive Ltd.' :
Kay Jee dispatched the consignment as per the terms of the
order.
Correct Answer False

Your Answer False

Multiple Choice Multiple Answer


Question This Question refers to the case 'Suyog Udyog' : Operation
details are as follows :-
Correct Answer Drill and ream 3 holes, 14 mm dia , Deburr , Mill 2 slots 28 mm
wide
Your Answer Deburr , Mill 2 slots 28 mm wide

Match The Following


Question Correct Answer Your Answer
Machine shop congested Shortage of space Shortage of space
with semi-processed
material kept in the bins
and components lying on
the floors all around.
This Question refers to the Shared by operators Calibrated in Quality
case of 'Classic control department of the
Engineering Components Company
Ltd.' : Measuring
instruments like vernier
calipers, micrometers or
gauges
Unispected lots Processed Identifiable by tags and
markings
Responsibility of oiling Maintenance department Maintenance department
/greasing

True/False
Question This question refers to 'Automotive Gears Private Limited' : The
table given in the case study gives approximate machine hour
rate for each indicated machine.
Correct Answer True

Your Answer True

True/False
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
Project duration can always be reduced by deploying additional
recourses.
Correct Answer False

Your Answer False

Multiple Choice Single Answer


Question This Question refers to the case of 'Kerson Automobiles' :The
option of shifting the workshop to another location at the
outskirts of the city was shelved because :-
Correct Answer Company was likely to lose business of spare parts and service
of old cars
Your Answer Company was likely to lose business of spare parts and service
of old cars

Select The Blank


Question This Question refers to the case 'Indus Foundries Ltd.' :Industrial
relations climate at all the proposed locations is ________ for
production.
Correct Answer Conductive
Your Answer Conductive

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Kerson Automobiles' : The
huge work table placed outside the machine shop can be used
to carry out :-
Correct Answer Debarring work , Cleaning work , Filing work

Your Answer Filing work , Debarring work , Cleaning work

Multiple Choice Single Answer


Question This Question refers to the case 'Suyog Udyog' : The proprietor
is a :-
Correct Answer Technical person

Your Answer Technical person

True/False
Question This question refers to case on 'Morbay Engineering Works
(MEW)' : "It is difficult to install an incentive scheme and easy to
withdraw when desired."
Correct Answer False

Your Answer False

Select The Blank


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : Success of wage incentive plans to a large extent
depends on the ________ of performance standards.
Correct Answer Quality

Your Answer Quality

Multiple Choice Single Answer


Question This question refers to 'Automotive Gears Private Limited' : It
manufactures a wide variety of :-
Correct Answer Gears & shafts

Your Answer Gears & shafts

Multiple Choice Multiple Answer


Question This Question refers to the case 'Indus Foundries Ltd.' :Following
items are readily available at all the three locations :-
Correct Answer Raw materials , Scrap , Foundry chemicals

Your Answer Raw materials , Scrap , Foundry chemicals


Select The Blank
Question This Question refers to the case of 'The Irate Vendor' : Jones
had been brought in by a management consultant to ________
the department's buying activities.
Correct Answer Centralize

Your Answer Centralize

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers' :Kalpak
Engineers have contracted from a boiler company manufacturing
of 500 nos of stay bolt. In the manufacturing process grinding
operation is carried out on following machine :-
Correct Answer Cylindrical grinder

Your Answer Cylindrical grinder

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Artwood Products' : The cost
of manufacturing has increased due to :-
Correct Answer Blockage of funds in inventory , Longer manufacturing cycle time
, Poor quality of products
Your Answer Blockage of funds in inventory , Longer manufacturing cycle time
, Poor quality of products

Multiple Choice Single Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' :
This case is on make-buy decision for an item. Name of that item
is one of the below :-
Correct Answer Exhaust Manifold

Your Answer Exhaust Manifold

Multiple Choice Single Answer


Question This Question refers to the case of 'The Geer Company' : The
purchase of steel was done exclusively by :-
Correct Answer One buyer

Your Answer One buyer

Multiple Choice Multiple Answer


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : An incentive plan can be considered as a tool for
following:-
Correct Answer Increase productivity , Create more capacity , Reduce
manufacturing costs
Your Answer Increase productivity , Create more capacity , Reduce
manufacturing costs
Match The Following
Question Correct Answer Your Answer

Inspection Dimensional accuracy Dimensional accuracy

The question refer to the Saw off Saw off


case on 'Kalpak
Engineers' : First
operation
Consecutive operations Copy turning machine Copy turning machine

Last machining operation Thread rolling Thread rolling

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers' : In the
case for all machining operations following data on time is
furnished:-
Correct Answer Setup time and standard time separately

Your Answer Setup time and standard time separately

Select The Blank


Question This Question refers to the case 'Suyog Udyog' : Number of work
stations are to be decided based on assumption that monthly off
take is ________ numbers.
Correct Answer 8000

Your Answer 8000

Select The Blank


Question This question refer to the case on "Allied Industries Pvt Ltd" :
Allied Industries Pvt ltd is a small ________ concern with 25
workmen.
Correct Answer Proprietary

Your Answer Proprietary

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Narmada Electricals Ltd.' :
Production or Quality department decide when these become
surplus/obsolete :-
Correct Answer Part , Component , Item

Your Answer Part , Component , Material


Multiple Choice Single Answer
Question This Question refers to the case of 'Northern Machinery Limited'
: Vice President ( Commercials) called the Materials Manager
Mr. Khan and informed him that an anonymous letter was
received which mentioned :-
Correct Answer Corruption in purchase department

Your Answer Corruption in purchase department

Select The Blank


Question This question refers to 'Automotive Gears Private Limited' : The
company produces items for ________ manufacturers.
Correct Answer Automobile

Your Answer Gear

Multiple Choice Multiple Answer


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : Following are some of the shortcomings of scanlon
plan:-
Correct Answer It rewards workers even if increase in sales is due to factor like
price increase , The plan does not recognize individual efforts ,
The increase in labour cost due to wage agreement may result in
lesser incentive bonus to the workmen
Your Answer It rewards workers even if increase in sales is due to factor like
price increase , The plan does not recognize individual efforts ,
The increase in labour cost due to wage agreement may result in
lesser incentive bonus to the workmen , The plan is very
complex to administer

Select The Blank


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : In Scanlon Plan all employees receive guaranteed
________ wages.
Correct Answer Time

Your Answer Minimum

True/False
Question This Question refers to the case of 'K.T Gears' : The activities
performed by the operator are listed on the practitioner's data
sheet.
Correct Answer True

Your Answer True

True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : It is
economical to continue subcontracting the machining of Exhaust
Manifold to vendors.

Correct Answer False

Your Answer True

Select The Blank


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
Duration of project can be reduced if duration of an activity on
________ path is reduced.
Correct Answer Critical

Your Answer Critical

Select The Blank


Question This Question refers to the case of 'Hansa Tractomotive Ltd.' :
Enroute to Delhi, the truck collided with an incoming ________.
Correct Answer Tractor Trailer

Your Answer Tractor Trailer

True/False
Question This Question refers to 'Uday Electroplating Shop' : As per cost
figures collected, Expected volume of work on special equipment
next year is 10,000 Nos.
Correct Answer True

Your Answer True

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Hansa Tractomotive Ltd.' :
After completion of manufacturing, Jay Jee took following actions
:-
Correct Answer Dispatched the consignment by Express Roadlines by truck ,
Raised the Hundi for the invoiced amount , Did not send the
consignment by Hansa's designated carrier
Your Answer Dispatched the consignment by Express Roadlines by truck , Did
not send the consignment by Hansa's designated carrier

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers' : Process
sheet does not provide following data:-
Correct Answer Shift

Your Answer Shift

Multiple Choice Single Answer


Question This Question refers to the case 'Suyog Udyog' : Balancing
weights are manufactured using facilities arranged in :-
Correct Answer Process type of layout

Your Answer Process type of layout

Multiple Choice Single Answer


Question This Question refers to the case of 'Divgi Metalwares Private
Limited' : The company is manned by :-
Correct Answer Professional managers

Your Answer Professional managers

Multiple Choice Multiple Answer


Question This Question refers to the case 'Indus Foundries Ltd.':The
location of plant has been narrowed down to following locations
:-
Correct Answer Kolhapur , Ahmedabad , Coimbatore

Your Answer Kolhapur , Ahmedabad , Coimbatore

Multiple Choice Multiple Answer


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : Following are the some of the important features of
incentive plans:-
Correct Answer Method of calculating incentive , Period of payment ,
Determination of performance standard
Your Answer Method of calculating incentive , Basis of wage payment ,
Determination of performance standard

Multiple Choice Single Answer


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
Weldtech India Private Ltd proposes to manufacture following
products:-
Correct Answer General purpose welding electrodes

Your Answer General purpose welding electrodes

Select The Blank


Question This Question refers to the case of 'Kerson Automobiles' :
Haphazard parking of cars inside the workshop, leads to
________ movements.
Correct Answer Unproductive

Your Answer Unproductive

Multiple Choice Multiple Answer


Question This Question refers to the case 'Quality Gauges Pvt. Ltd.' : The
consultant made following recommendations :-
Correct Answer Creation of industrial engineering department , Methods
improvement & fixation of performance standards , Introduction
of incentive scheme
Your Answer Creation of industrial engineering department , Methods
improvement & fixation of performance standards , Introduction
of incentive scheme

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers' : This case
is concerned with following element of production planning:-
Correct Answer Routing

Your Answer Routing

True/False
Question This question refers to the case of 'Northern Machinery Ltd' : As
per summary of purchases of the last year, Material cost as a
proportion of sales is 26%.
Correct Answer False

Your Answer False


Cases in operation mgmt ALPANA

True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : It is economical to continue subcontracting the machining of
Exhaust Manifold to vendors.
Correct Answer False
Your Answer True

True/False
Question This Question refers to the case of National Engineering Co.
Correct Answer False
Your Answer True

Multiple Choice Single Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Following is One apparent saving if the machining is done at the
company's own plant:-
Correct Answer Sale of scrap
Your Answer Transport cost

Multiple Choice Single Answer


Question This Question refers to the case of 'The Geer Company' : The purchase of steel was done exclusively by :-
Correct Answer One buyer
Your Answer One buyer

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Gujrat Engineering company Limited' : The forged cylinder ordered on new vendor :-
Correct Answer Was received on schedule , Was priced 15 % lower than the price of the previous supplier , Had missed out carrying out
some machining operations
Your Answer Was received on schedule , Was priced 15 % lower than the price of the previous supplier , Had missed out carrying out
some machining operations

Multiple Choice Multiple Answer


Question This question refer to the case on "Allied Industries Pvt Ltd" : Variable cost consists of the following :-
Correct Answer Cost of a pair thread roll , Regrinding charges on thread roll , Power cost
Your Answer Employee cost , Cost of a pair thread roll , Regrinding charges on thread roll

Select The Blank


Question This question refers to 'Automotive Gears Private Limited' : The case study requires calculation of set up ________ for the job.
Correct Answer Cost
Your Answer Feature

Match The Following


Question Correct Answer Your Answer

Shop floor mangers pressurized to give Overtime Lot of effort

This Question refers to the case 'Quality Gauges Pvt. Ltd.' : Qualifying amount shall be raised with Increase in sales price Total output in
terms of value of production

Incentive will be paid on Basic salary of each employee Increase in sales price

Basis of payment on Total output in terms of value of production Basic salary of each employee

Multiple Choice Single Answer


Question This Question refers to the case of 'Divgi Metalwares Private Limited' : The table given in the case study gives details of
activities and expected time for the same. It requires construction of :-
Correct Answer Network diagram of the activities
Your Answer Network diagram of the activities

Match The Following


Question Correct Answer Your Answer

Equipment cost Capital recovery factor Threaded nut

This question refer to the case on "Allied Industries Pvt Ltd." : Variable cost Power cost Power cost

Fixed cost Space cost Capital recovery

Item Sealing pump Sealing pump

Select The Blank


Question This Question refers to the case of 'The Geer Company' : The volume of growth tripled due to ________ management.
Correct Answer Aggressive
Your Answer Aggressive

Multiple Choice Single Answer


Question This Question refers to the case of 'K.T Gears' : One of the operations recently studied by the methods study practitioner at
this company concerns is :-
Correct Answer Cutting of groove in a sliding gear
Your Answer Cutting of groove in a sliding gear

Multiple Choice Single Answer


Question This Question refers to the case of 'Kerson Automobiles' : It was decided to modify the existing layout of the plant in the year :-
Correct Answer 1972
Your Answer 1972

True/False
Question This Question refers to the case of 'Kerson Automobiles' : MD has agreed to carry out modification of existing plant.
Correct Answer True
Your Answer True

Select The Blank


Question This Question refers to the case of 'The Gujrat Engineering company Limited' : A compromise was finally reached in which the
supplier agreed to ________ the cancellation charges.
Correct Answer Withdraw
Your Answer Absorb

Multiple Choice Multiple Answer


Question This question refers to case on 'Morbay Engineering Works (MEW)' : Following are some of the shortcomings of scanlon plan:-
Correct Answer It rewards workers even if increase in sales is due to factor like price increase , The plan does not recognize individual
efforts , The increase in labour cost due to wage agreement may result in lesser incentive bonus to the workmen

Your Answer It rewards workers even if increase in sales is due to factor like price increase , The plan does not recognize individual
efforts , The increase in labour cost due to wage agreement may result in lesser incentive bonus to the workmen

True/False
Question This Question refers to the case of 'K.T Gears' : The activities performed by the operator are listed on the practitioner's data
sheet.
Correct Answer True
Your Answer True

True/False
Question This Question refers to the case of 'Narmada Electricals Ltd.' :The rates of scrap were reviewed from time to time.
Correct Answer False
Your Answer True

Select The Blank


Question This Question refers to the case of 'Eagle Machine Company' : The purchase department is responsible only for buying and
________.
Correct Answer Expediting
Your Answer Inspection

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Geer Company' : Problems got created due to :-
Correct Answer Added work load in purchasing , Divided buying responsibilities , Number of inexperienced buyers
Your Answer Added work load in purchasing , Divided buying responsibilities , Number of inexperienced buyers

Multiple Choice Single Answer


Question This Question refers to the case of 'National Engineering Co' : GM commented that every department in this company
competes with others in matter of :-
Correct Answer Inefficiency
Your Answer Inefficiency

Multiple Choice Single Answer


Question This question refers to case on 'Morbay Engineering Works (MEW)' : Incentive schemes can not be considered to be a
substitute of the following:-
Correct Answer Poor management
Your Answer Low manufacturing cost

True/False
Question This Question refers to the case 'Indus Foundries Ltd.' : Skilled manpower at worker level is not available in plenty at Kolhapur.
Correct Answer False
Your Answer True

Multiple Choice Single Answer


Question This question refers to case on Uma Tools Pvt Ltd (UTPL)' : Presently the raw castings are procured by UTPL and given to
machining to three vendors. If UTPL has to manufacture Exhaust Manifold in house it would have to provide one of the following:
Correct Answer New jigs and fixtures
Your Answer Additional machines

Select The Blank


Question This Question refers to the case of 'K.T Gears' : The cycle time per piece to perform the set of activities listed adds up to
________.
Correct Answer 2.30 minutes
Your Answer 1.9 minutes

Multiple Choice Multiple Answer


Question This question refers to 'Automotive Gears Private Limited' : The spline Grinding machine is used for operation :-
Correct Answer Spline Grind (section'AA') , Spline Grind (section'BB') , Spline Grind (section'CC')
Your Answer Spline Grind (section'AA') , Spline Grind (section'BB')

Select The Blank


Question This Question refers to the case of 'Eagle Machine Company' : The Marketing Manager ________ the finished stock.
Correct Answer Controls
Your Answer Buys

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Artwood Products' : The product range includes :-
Correct Answer Sofa , Dressing tables , Office tables
Your Answer Office tables , Sofa

True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : The cost of foundry reject is borne by the company.
Correct Answer True
Your Answer True

Select The Blank


Question The question refer to the case on 'Kalpak Engineers' : Raw material in the form of bar stock is supplied by the ________.
Correct Answer Customer
Your Answer Stockiest

Multiple Choice Single Answer


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Use of Network Techniques beside computing project
duration also helps in the following :-
Correct Answer Possibilities of reducing project duration
Your Answer Computing manpower requirement

Multiple Choice Single Answer


Question This Question refers to the case of 'Eagle Machine Company' : The company is facing following problem :-
Correct Answer Sales are declining
Your Answer Sales are declining

Multiple Choice Multiple Answer


Question This Question refers to the case 'Quality Gauges Pvt. Ltd.' : The consultant made following recommendations :-
Correct Answer Creation of industrial engineering department , Methods improvement & fixation of performance standards , Introduction
of incentive scheme
Your Answer Creation of industrial engineering department , Methods improvement & fixation of performance standards , Introduction of
incentive scheme

Multiple Choice Single Answer


Question This Question refers to the case of 'National Engineering Co.' : As per GM, the route cause of this non-sensical situation is lack
of :-
Correct Answer Co-ordination
Your Answer Co-ordination

Select The Blank


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Delays in completion of ________ would increase Project
cost.
Correct Answer Project
Your Answer Indirect

Select The Blank


Question This Question refers to the case of 'The Irate Vendor' : As per Jones, the new ________ procedures were sound.
Correct Answer Purchasing
Your Answer Quality

True/False
Question This question refers to case on 'Morbay Engineering Works (MEW)' : Under Scanlon Plan employee is paid incentive bonus
based on individual efforts and additional output.
Correct Answer True
Your Answer True

Select The Blank


Question This Question refers to the case of 'Kerson Automobiles' : The pedestal grinder mounted on the huge work table, gives out
________ and blows out dust.
Correct Answer Sparks
Your Answer Smells

True/False
Question This Question refers to the case of 'Classic Engineering Components Ltd.' : Mr. Sen was informed by Mr. Ravikant, Materials
Manager that counting is not necessary at every stage as they count at the initial stage and since their workers and supervisors are
experienced, they can easily identify the components at each stage of production.
Correct Answer True
Your Answer True

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Irate Vendor' : The President's memorandum says :-
Correct Answer We have treated this supplier unfairly , He would like to see if his complaint is justified , The Vendor's letter suggests
that we do not have a policy on evaluating our vendors
Your Answer We have treated this supplier unfairly , He would like to see if his complaint is justified , The Vendor's letter suggests that
we do not have a policy on evaluating our vendors

Select The Blank


Question This Question refers to the case 'Quality Gauges Pvt. Ltd.' : The agreement mentioned that Incentive amount will be paid along
with ________.
Correct Answer Wages
Your Answer Wages

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Gujrat Engineering company Limited' : The company has received a special order
where :-
Correct Answer A special cylinder is to be manufactured. , The item is to be manufactured from a hollow bored forging , Fastest delivery
is requested
Your Answer A special cylinder is to be manufactured. , The item is to be manufactured from a hollow bored forging , Fastest delivery is
requested

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Hansa Tractomotive Ltd.': The contract with Kay Jee Hydraulics Ltd was agreed with
following terms & conditions :-
Correct Answer Price per unit FOR Bombay , Delivery 10-12 weeks after receipt of buyer's confirmed order , Payment 60 days after
dispatch of material
Your Answer Price per unit FOR Bombay , Delivery 10-12 weeks after receipt of buyer's confirmed order , Payment 60 days after
dispatch of material

Multiple Choice Single Answer


Question This Question refers to the case of 'Northern Machinery Limited' : Khan had used a paper to deliver a talk to his senior buyers.
This paper contained :-
Correct Answer Summary of purchases
Your Answer Summary of purchases

True/False
Question This Question refers to the case of 'Universal Fasteners Ltd.' : Mr. Sharma, Production Engineer informed Mr. Kaul that
Hardening & Tempering was the last operation.
Correct Answer True
Your Answer True

Multiple Choice Multiple Answer


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Following are the activities involved in employee selection for
WIPL :-
Correct Answer Release of advertisement , Finalize job profile , Selecting candidates
Your Answer Release of advertisement , Finalize job profile , Selecting candidates

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Hansa Tractomotive Ltd.' : After completion of manufacturing, Jay Jee took following
actions :-
Correct Answer Dispatched the consignment by Express Roadlines by truck , Raised the Hundi for the invoiced amount , Did not send
the consignment by Hansa's designated carrier
Your Answer Dispatched the consignment by Express Roadlines by truck , Raised the Hundi for the invoiced amount , Did not send the
consignment by Hansa's designated carrier

LIST OF ATTEMPTED QUESTIONS AND ANSWERS AMIT CHUG

True/False
Question The question refer to the case on 'Kalpak Engineers' : Set up time for the machines is not more than an hour in the case.
Correct Answer True
Your Answer True

True/False
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Project duration can always be reduced by deploying
additional recourses.
Correct Answer False
Your Answer True

True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : As extra capacity can be generated by starting an additional shift,
hence fixed overheads are sizable.
Correct Answer False
Your Answer True

Multiple Choice Single Answer


Question This question refers to case on 'Morbay Engineering Works (MEW)' : The success of an incentive plan to a large extent
depends on the following factor:-
Correct Answer Quality of performance standard
Your Answer Production Planning and Control system

Select The Blank


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : In order to save time in construction the management
purchased a ________.
Correct Answer Factory-building
Your Answer Godown

Multiple Choice Multiple Answer


Question This Question refers to the case of National Engineering Co.
Correct Answer Despatched the consignment by Express Roadlines by truck , Raised the Hundi for the invoiced amount , Did not send
the consignment by Hansa's designated carrier
Your Answer Despatched the consignment by Express Roadlines by truck , Raised the Hundi for the invoiced amount , Did not send the
consignment by Hansa's designated carrier

True/False
Question This Question refers to the case 'Suyog Udyog' : The operation time for C' sunk 14 dia holes on both sides is 0.50 per piece.
Correct Answer True
Your Answer True

Select The Blank


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Duration of project can be reduced if duration of an activity on
________ path is reduced.
Correct Answer Critical
Your Answer Non critical

Select The Blank


Question This Question refers to the case of 'Artwood Products' : Entire shop floor was ________ due to piles of work in progress.
Correct Answer Congested
Your Answer Overflowing

Multiple Choice Single Answer


Question This Question refers to the case 'Indus Foundries Ltd.': The company is faced with following problems :-
Correct Answer Choice of Location
Your Answer Choice of Location

True/False
Question This question refers to case on 'Morbay Engineering Works (MEW)' : Work sampling and production studies can be used to
test viability of the performance standards.
Correct Answer True
Your Answer True

Multiple Choice Single Answer


Question This Question refers to the case of 'Classic Engineering Components Ltd.' : This company was acquired by Das Group of
Industries. Mr. Mohit Sen,(head of Business planning function in the corporate office) was visiting the factory as its :-
Correct Answer Turn over was stagnating
Your Answer Turn over was stagnating

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Northern Machinery Limited' : The writer of anonymous letter :-
Correct Answer Is a share holder of the company , Has the interest of the shareholders of the company , Wants the Company to put a
stop before it is too late
Your Answer Is a share holder of the company , Has the interest of the shareholders of the company , Wants the Company to put a stop
before it is too late

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Hansa Tractomotive Ltd.' : After completion of manufacturing, Jay Jee took following
actions :-
Correct Answer Dispatched the consignment by Express Roadlines by truck , Raised the Hundi for the invoiced amount , Did not send
the consignment by Hansa's designated carrier
Your Answer Dispatched the consignment by Express Roadlines by truck , Raised the Hundi for the invoiced amount , Did not send the
consignment by Hansa's designated carrier

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Narmada Electricals Ltd.' : Other material considered to be scrap/obsolete is :-
Correct Answer Packing material , Maintenance spares , Parts/components
Your Answer Packing material , Maintenance spares , Parts/components

True/False
Question This Question refers to the case of 'Divgi Metalwares Private Limited' : The order has been finalized from a leading engineering
firm.
Correct Answer False
Your Answer True

True/False
Question This Question refers to the case 'Indus Foundries Ltd.' : Skilled manpower at worker level is not available in plenty at Kolhapur.
Correct Answer False
Your Answer True

Multiple Choice Multiple Answer


Question The question refer to the case on 'Kalpak Engineers' : For manufacturing Stay Bolt following machines are planned:-
Correct Answer Copying Lathe , Radial Drilling Machine , Thread Rolling machine
Your Answer Turret Lathe , Copying Lathe , Radial Drilling Machine

True/False
Question This Question refers to the case of National Engineering Co.
Correct Answer False
Your Answer True

Select The Blank


Question This Question refers to the case of 'Kerson Automobiles' : Battery charger placed on one end of table creates ________.
Correct Answer Nuisance
Your Answer Nuisance

Select The Blank


Question This Question refers to the case 'Quality Gauges Pvt. Ltd.' : The agreement mentioned that Incentive amount will be paid along
with ________.
Correct Answer Wages
Your Answer Ex gratia

Multiple Choice Single Answer


Question This Question refers to the case of 'Divgi Metalwares Private Limited' : The table given in the case study gives details of
activities and expected time for the same. It requires construction of :-
Correct Answer Network diagram of the activities
Your Answer Network diagram of the activities

Select The Blank


Question This Question refers to the case of 'Hansa Tractomotive Ltd.' : Enroute to Delhi, the truck collided with an incoming ________.
Correct Answer Tractor Trailer
Your Answer Contract Bus

Multiple Choice Single Answer


Question This Question refers to the case of 'Classic Engineering Components Ltd.' : Customers complaints were on the rise, mainly
due to :-
Correct Answer Delay in deliveries
Your Answer Delay in deliveries

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Kerson Automobiles' : As per consultants, problems are due to following reasons :-
Correct Answer Material flow (Cars) is not smooth , A major chunk of productive time is lost in obtaining replacement of spares from
stores. , Too often, helpers are found busy in transferring parts from work table to a hand trolley.
Your Answer Material flow (Cars) is not smooth , A major chunk of productive time is lost in obtaining replacement of spares from stores.
, Too often, helpers are found busy in transferring parts from work table to a hand trolley.

Match The Following


Question Correct Answer Your Answer

Responsibility for Monthly report on any rejected/obsolete/non-moving items Production /Marketing department Store Manager

This Question refers to the case of 'Narmada Electricals Ltd.' : Decision whether material is obsolete or otherwise Store Manager With held
for the time being

Disposal of waste/obsolete material Once a year Three times a year

Storage of scrap material in scrap yard Without identification or any records of quantities Production /Marketing department
Multiple Choice Single Answer
Question This Question refers to the case 'Indus Foundries Ltd.':Parveen Kumar proposed to set up a :-
Correct Answer Cast Iron foundry
Your Answer Cast Iron foundry

Match The Following


Question Correct Answer Your Answer

Anonymous letter received by M.D. Need to justify Seen in top hotels with suppliers

This question refers to the case of 'Northern Machinery Ltd.' : Senior buyers Seen in top hotels with suppliers Need to be concise and to
the point

Reason for failure to convince the Board of Directors No material facts to support the arguments No material facts to support the
arguments

Lot of items on the agenda Need to be concise and to the point No confidence in Material manager and Senior buyers

Select The Blank


Question This question refers to case on 'Morbay Engineering Works (MEW)' : Overtime must be ________ to guarantee the success of
the wage incentive scheme.
Correct Answer Eliminative
Your Answer Controlled

Multiple Choice Single Answer


Question This Question refers to the case of 'Northern Machinery Limited' : Vice President ( Commercials) called the Materials Manager
Mr. Khan and informed him that an anonymous letter was received which mentioned :-
Correct Answer Corruption in purchase department
Your Answer Corruption in purchase department

Multiple Choice Multiple Answer


Question This question refers to case on 'Morbay Engineering Works (MEW)' : Following are the some of the important features of
incentive plans:-
Correct Answer Method of calculating incentive , Period of payment , Determination of performance standard
Your Answer Method of calculating incentive , Period of payment , Basis of wage payment

Multiple Choice Single Answer


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Use of Network Techniques beside computing project
duration also helps in the following :-
Correct Answer Possibilities of reducing project duration
Your Answer Computing manpower requirement

Multiple Choice Single Answer


Question This question refers to case on 'Morbay Engineering Works (MEW)' : Incentive schemes can not be considered to be a
substitute of the following:-
Correct Answer Poor management
Your Answer Low manufacturing cost

Select The Blank


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : In machining Exhaust Manifold, no cutting oil is required as the
material is ________.
Correct Answer Cast iron
Your Answer Steel

Multiple Choice Single Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : If annual requirement of finished part is 20,000 nos and machine
rejection allowance is 5%. The cost of casting for the Exhaust Manifold is Rs.10/unit. And value of scrap is 3000 Rs.The material cost if the
Exhaust Manifold is manufactured in-house is (figures assumed):-
Correct Answer Rs 207,000
Your Answer Rs 197,000

Multiple Choice Multiple Answer


Question This Question refers to the case of 'K.T Gears' : The firm is :-
Correct Answer A proprietary firm , Engaged in manufacture of spur gears , Engaged in manufacture of helical gear
Your Answer A proprietary firm , Engaged in manufacture of spur gears , Engaged in manufacture of helical gear

Multiple Choice Multiple Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : If the Exhaust Manifold is manufactured in house, following costs
wll increase:-
Correct Answer Cost of power , Cost of labour , Cost of consumables like grease, lubricant
Your Answer Cost of power , Cost of labour , Cost of consumables like grease, lubricant
Multiple Choice Multiple Answer
Question This Question refers to the case of 'Classic Engineering Components Ltd.' : The company supplies components to :-
Correct Answer Automobile industries , Printing machines , Machine tool & process equipment industries
Your Answer Automobile industries , Printing machines , Machine tool & process equipment industries

Multiple Choice Multiple Answer


Question The question refer to the case on 'Kalpak Engineers' : Following are the operations involved in manufacturing stay bolt in the
case:-
Correct Answer Copy turning , Thread Rolling , Drilling
Your Answer Threading , Copy turning , Thread Rolling

Multiple Choice Single Answer


Question This Question refers to the case of 'Hansa Tractomotive Ltd.' : The company contracted with Kay Jee Hydraulics Ltd. Bombay
for supply of :-
Correct Answer Filtering & Transfer machines
Your Answer Filtering & Transfer machines

Multiple Choice Single Answer


Question This Question refers to the case of 'The Irate Vendor' : The supplier's bid was not accepted because :-
Correct Answer It was not the lowest
Your Answer It was not the lowest

Multiple Choice Multiple Answer


Question This question refers to 'Automotive Gears Private Limited' : For Hob splines Operations, it uses :-
Correct Answer Cleaveland Hobbing machine , Newark Hobbing machine , Thread Milling machine
Your Answer Cleaveland Hobbing machine , Newark Hobbing machine , Thread Milling machine

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers' :Kalpak Engineers have contracted from a boiler company manufacturing
of 500 nos of stay bolt. In the manufacturing process grinding operation is carried out on following machine :-
Correct Answer Cylindrical grinder
Your Answer Cylindrical grinder

Select The Blank


Question This Question refers to the case of 'Universal Fasteners Ltd.' : In the tempering process of studs, the ________ was reduced
to 25-28 HRC.
Correct Answer Hardness
Your Answer Thickness

True/False
Question This question refers to the case of 'Northern Machinery Ltd' : As per summary of purchases of the last year, Material cost as a
proportion of sales is 26%.
Correct Answer False
Your Answer True

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers' : In the case for all machining operations following data on time is
furnished:-
Correct Answer Setup time and standard time separately
Your Answer Setup time and standard time separately

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers' : Process sheet does not provide following data:-
Correct Answer Shift
Your Answer Shift

LIST OF ATTEMPTED QUESTIONS AND ANSWERS MAYANK GOYAL

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers' : This case is concerned with following element of production planning:-
Correct Answer Routing
Your Answer Routing

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Geer Company' : Problems got created due to :-
Correct Answer Added work load in purchasing , Divided buying responsibilities , Number of inexperienced buyers
Your Answer Added work load in purchasing , Divided buying responsibilities , Number of inexperienced buyers

Multiple Choice Single Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Power consumption cost is considered as :-
Correct Answer Variable overhead cost
Your Answer Fixed Cost

True/False
Question This Question refers to the case 'Quality Gauges Pvt. Ltd.' : The executives were entitled for incentive bonus.
Correct Answer True
Your Answer True

True/False
Question This Question refers to the case of 'K.T Gears' : The activities performed by the operator are listed on the practitioner's data
sheet.
Correct Answer True
Your Answer True

Multiple Choice Multiple Answer


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : project planning/scheduling techniques are called by following
names:-
Correct Answer CPM , PERT , Network Analysis
Your Answer CPM , PERT , Network Analysis

Multiple Choice Single Answer


Question This Question refers to the case of 'Northern Machinery Limited' : Materials Manager informed V.P. that the letter must have
been written by supplier affected by :-
Correct Answer New buying policies
Your Answer New buying policies

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Classic Engineering Components Ltd.' : The company supplies components to :-
Correct Answer Automobile industries , Printing machines , Machine tool & process equipment industries
Your Answer Automobile industries , Printing machines , Machine tool & process equipment industries

True/False
Question This Question refers to the case of 'The Irate Vendor' : The President knows that some changes in purchasing policy are being
planned.
Correct Answer True
Your Answer True

Select The Blank


Question This Question refers to the case of 'Artwood Products' : Entire shop floor was ________ due to piles of work in progress.
Correct Answer Congested
Your Answer Congested

True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : The cost of foundry reject is borne by the company.
Correct Answer True
Your Answer True

True/False
Question This Question refers to the case of 'Narmada Electricals Ltd.' :The rates of scrap were reviewed from time to time.
Correct Answer False
Your Answer False

Match The Following


Question Correct Answer Your Answer

Shop floor mangers pressurized to give Overtime Lot of effort

This Question refers to the case 'Quality Gauges Pvt. Ltd.' : Qualifying amount shall be raised with Increase in sales price Increase in sales
price

Incentive will be paid on Basic salary of each employee Overtime

Basis of payment on Total output in terms of value of production Basic salary of each employee

Select The Blank


Question This Question refers to the case of 'Artwood Products' : The ________ furniture is sold through distributors.
Correct Answer Standard
Your Answer Made to order

Select The Blank


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Jigs and fixtures once provided will be able to maintain accuracy
up to about ________ pieces.
Correct Answer 20000
Your Answer 5000

Select The Blank


Question This question refers to case on 'Morbay Engineering Works (MEW)' : Success of wage incentive plans to a large extent
depends on the ________ of performance standards.
Correct Answer Quality
Your Answer Quality

Select The Blank


Question This Question refers to the case of 'Kerson Automobiles' : Battery charger placed on one end of table creates ________.
Correct Answer Nuisance
Your Answer Nuisance

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Divgi Metalwares Private Limited' : The new items contracted by the company are handled
by the development department for :-
Correct Answer Submission of samples , Manufacture of one or two production lots , Transfer to manufacturing department for regular
production, after successful development
Your Answer Submission of samples , Manufacture of one or two production lots , Transfer to manufacturing department for regular
production, after successful development

Select The Blank


Question This Question refers to the case 'Indus Foundries Ltd.' :Industrial relations climate at all the proposed locations is ________ for
production.
Correct Answer Conductive
Your Answer Favourable

Multiple Choice Multiple Answer


Question The question refer to the case on 'Kalpak Engineers' : Following are the operations involved in manufacturing stay bolt in the
case:-
Correct Answer Copy turning , Thread Rolling , Drilling
Your Answer Copy turning , Thread Rolling , Drilling

True/False
Question This question refers to case on 'Morbay Engineering Works (MEW)' : Under Scanlon Plan employee is paid incentive bonus
based on individual efforts and additional output.
Correct Answer True
Your Answer True

Multiple Choice Multiple Answer


Question This Question refers to the case 'Indus Foundries Ltd.':The location of plant has been narrowed down to following locations :-
Correct Answer Kolhapur , Ahmedabad , Coimbatore
Your Answer Kolhapur , Ahmedabad , Coimbatore

Multiple Choice Single Answer


Question This Question refers to the case of 'The Gujrat Engineering company Limited' : The company also executes :-
Correct Answer Rush orders
Your Answer Rush orders

Select The Blank


Question This question refers to case on 'Morbay Engineering Works (MEW)' : Incentive scheme is a tool to create ________ capacity,
increase productivity and reduce manufacturing costs.
Correct Answer More
Your Answer Additional

Multiple Choice Multiple Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : If the Exhaust Manifold is to be manufactured in house, following
are the requirements:-
Correct Answer Additional manpower , New jigs and fixtures , Additional shift
Your Answer New jigs and fixtures , Additional shift , Additional manpower

Multiple Choice Single Answer


Question This Question refers to the case of 'Eagle Machine Company' : The company is facing following problem :-
Correct Answer Sales are declining
Your Answer Sales are declining

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Divgi Metalwares Private Limited' : As per the Activity description given in the table,
Preparation of operational layout activity affects following activities :-
Correct Answer Design and draft hobbing fixture , Procure plug gauge , Procure ring gauge
Your Answer Design and draft hobbing fixture , Procure plug gauge , Procure ring gauge

Match The Following


Question Correct Answer Your Answer

Inspection Dimensional accuracy Copy turning machine

The question refer to the case on 'Kalpak Engineers' : First operation Saw off Saw off

Consecutive operations Copy turning machine Grinding


Last machining operation Thread rolling Sampling

Multiple Choice Multiple Answer


Question This Question refers to the case 'Indus Foundries Ltd.' :Following items are readily available at all the three locations :-
Correct Answer Raw materials , Scrap , Foundry chemicals
Your Answer Raw materials , Scrap , Foundry chemicals

Multiple Choice Multiple Answer


Question This Question refers to 'Uday Electroplating Shop' : It is a small Proprietary concern and :-
Correct Answer Has only three employees , Only one has knowledge and skill of electroplating , Workmen work for max 61/2 hours
Your Answer Has only three employees , Only one has knowledge and skill of electroplating , Workmen work for max 61/2 hours

True/False
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Project duration can always be reduced by deploying
additional recourses.
Correct Answer False
Your Answer True

Multiple Choice Single Answer


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Weldtech India Private Ltd proposes to manufacture following
products:-
Correct Answer General purpose welding electrodes
Your Answer General purpose welding electrodes

Multiple Choice Single Answer


Question This Question refers to the case of 'Universal Fasteners Ltd.' : Heat Treatment process for the studs involves two operations
viz :-
Correct Answer Hardening & Tempering
Your Answer Hardening & Tempering

Multiple Choice Single Answer


Question This Question refers to the case 'Indus Foundries Ltd.' :In the proposed plant, heating of charge is to be done by :-
Correct Answer Induction furnace
Your Answer Induction furnace

Select The Blank


Question This Question refers to the case of 'Narmada Electricals Ltd.' : The disposal of material was done on ________ basis.
Correct Answer Weight
Your Answer Piece rate

Multiple Choice Single Answer


Question This Question refers to the case of 'Autogears Private Limited' : The management is interested in the following :-
Correct Answer Improved method of working
Your Answer Improved method of working

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Universal Fasteners Ltd.' : Mr Banerjee, Manager Quality informed Mr.Kaul that :-
Correct Answer Raw Material received was without test certificate and was not inspected by the inspector , Laid down procedure for
processes of heat treatment, painting etc. are not followed due to heavy labour turnover and frequent work allocation , Management has
been requested to get the crack detection machine repaired.
Your Answer Raw Material received was without test certificate and was not inspected by the inspector , Laid down procedure for
processes of heat treatment, painting etc. are not followed due to heavy labour turnover and frequent work allocation , Management has
been requested to get the crack detection machine repaired.

Multiple Choice Single Answer


Question This Question refers to the case of 'Kerson Automobiles' : Cars are manually pushed over the wooden stand placed in the
major repairs section because of :-
Correct Answer Absence of the underground pit
Your Answer Absence of the underground pit

Multiple Choice Multiple Answer


Question The question refer to the case on 'Kalpak Engineers' : For manufacturing Stay Bolt following machines are planned:-
Correct Answer Copying Lathe , Radial Drilling Machine , Thread Rolling machine
Your Answer Copying Lathe , Radial Drilling Machine , Thread Rolling machine

True/False
Question This Question refers to the case of Narmada Electricals Ltd. Mr. Jain proposed that for accounting of material, and to carry out
other task, two additional clerks shall be recruited
Correct Answer True
Your Answer True

Multiple Choice Multiple Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : For calculating fixed labour cost following data is required:-
Correct Answer Set up time for operation , Labour hour rate , No of production runs per year
Your Answer Set up time for operation , Labour hour rate , No of production runs per year

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Hansa Tractomotive Ltd.': The contract with Kay Jee Hydraulics Ltd was agreed with
following terms & conditions :-
Correct Answer Price per unit FOR Bombay , Delivery 10-12 weeks after receipt of buyer's confirmed order , Payment 60 days after
dispatch of material
Your Answer Price per unit FOR Bombay , Delivery 10-12 weeks after receipt of buyer's confirmed order , Payment 60 days after
dispatch of material

Multiple Choice Single Answer


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : The management of WIPL is deeply concerned about early
completion of the project as delays in execution would result in the following:-
Correct Answer Delayed entry of product in the market
Your Answer Delayed entry of product in the market

Select The Blank


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : In machining Exhaust Manifold, no cutting oil is required as the
material is ________.
Correct Answer Cast iron
Your Answer Cast iron

Multiple Choice Single Answer


Question This Question refers to the case of 'Kerson Automobiles' :The option of shifting the workshop to another location at the
outskirts of the city was shelved because :-
Correct Answer Company was likely to lose business of spare parts and service of old cars
Your Answer Company was likely to lose business of spare parts and service of old cars

Select The Blank


Question This question refers to 'Automotive Gears Private Limited' : The company produces items for ________ manufacturers.
Correct Answer Automobile
Your Answer Engine

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers' : Process sheet does not provide following data:-
Correct Answer Shift
Your Answer Shift

LIST OF ATTEMPTED QUESTIONS AND ANSWERS ASHISH MEHTA

Multiple Choice Single Answer


Question This question refer to the case on "Allied Industries Pvt Ltd" : Following cost element is considered while calculating total cost
of buying :-
Correct Answer Transport cost
Your Answer Transport cost

Select The Blank


Question This Question refers to the case of 'Classic Engineering Components Ltd.' : Mr. Sen observed that the Machine Shop was
looking ________.
Correct Answer Congested
Your Answer Neat

Multiple Choice Single Answer


Question This Question refers to the case of 'Kerson Automobiles' : Distance traveled every day, by a mechanic to get replacement from
stores is :-
Correct Answer 4 to 6 miles
Your Answer 4 to 6 miles

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers' : In the case for all machining operations following data on time is
furnished:-
Correct Answer Setup time and standard time separately
Your Answer Setup time and standard time separately

True/False
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Installation of machine should follow recruitment of workmen.
Correct Answer True
Your Answer True

Multiple Choice Multiple Answer


Question This question refers to case on 'Morbay Engineering Works (MEW)' : Following are some of the shortcomings of scanlon plan:-
Correct Answer It rewards workers even if increase in sales is due to factor like price increase , The plan does not recognize individual
efforts , The increase in labour cost due to wage agreement may result in lesser incentive bonus to the workmen

Your Answer It rewards workers even if increase in sales is due to factor like price increase , The plan does not recognize individual
efforts , The increase in labour cost due to wage agreement may result in lesser incentive bonus to the workmen

Multiple Choice Single Answer


Question This question refers to case on 'Morbay Engineering Works (MEW)' : One of the most popular and widely used incentive plan
is called by following name:-
Correct Answer Scanlon Plan
Your Answer Maslow plan

True/False
Question This Question refers to 'Uday Electroplating Shop' : As per cost figures collected, Expected volume of work on special
equipment next year is 10,000 Nos.
Correct Answer True
Your Answer True

Multiple Choice Multiple Answer


Question This Question refers to the case 'Indus Foundries Ltd.':The location of plant has been narrowed down to following locations :-
Correct Answer Kolhapur , Ahmedabad , Coimbatore
Your Answer Kolhapur , Ahmedabad , Coimbatore

Select The Blank


Question This Question refers to the case of 'Hansa Tractomotive Ltd.' : Enroute to Delhi, the truck collided with an incoming ________.
Correct Answer Tractor Trailer
Your Answer Tractor Trailer

True/False
Question The question refer to the case on 'Kalpak Engineers' : Set up time for the machines is not more than an hour in the case.
Correct Answer True
Your Answer True

True/False
Question This question refer to the case on "Allied Industries Pvt Ltd" :Capital recovery per annum is an element of fixed cost.
Correct Answer True
Your Answer True

Multiple Choice Single Answer


Question This Question refers to the case of 'Classic Engineering Components Ltd.' : The company specializes in manufacturing :-
Correct Answer Precision machined components
Your Answer Precision machined components

True/False
Question This Question refers to the case of 'Eagle Machine Company' : The company buys a variety of material, ranging from a few
ponds of rare metals to sizable quantities of sheet metal.
Correct Answer True
Your Answer True

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Eagle Machine Company' : Cost of running Sally's department is Rs 3,70,000 per year.
This is on account of :-
Correct Answer Salaries , Fringes , Expenses
Your Answer Salaries , Fringes , Expenses

True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Cost of reject above 5% machining rejection is borne by the
vendor.
Correct Answer True
Your Answer True

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers' :Kalpak Engineers have contracted from a boiler company manufacturing
of 500 nos of stay bolt. In the manufacturing process grinding operation is carried out on following machine :-
Correct Answer Cylindrical grinder
Your Answer Cylindrical grinder

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Northern Machinery Limited' : The writer of anonymous letter :-
Correct Answer Is a share holder of the company , Has the interest of the shareholders of the company , Wants the Company to put a
stop before it is too late
Your Answer Is a share holder of the company , Has the interest of the shareholders of the company , Wants the Company to put a stop
before it is too late

Multiple Choice Single Answer


Question This Question refers to the case of 'Divgi Metalwares Private Limited' : It is a :-
Correct Answer Light engineering company
Your Answer Heavy engineering company

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Geer Company' : The problems reported are :-
Correct Answer Delays in placing orders , Frequently late deliveries , Incorrect ordering quantities
Your Answer Delays in placing orders , Frequently late deliveries , Incorrect ordering quantities

Multiple Choice Single Answer


Question This Question refers to the case 'Suyog Udyog' : The proprietor is a : -
Correct Answer Technical person
Your Answer Technical person

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers' : This case is concerned with following element of production planning:-
Correct Answer Routing
Your Answer Routing

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Irate Vendor' : The old supplier :-
Correct Answer Has been supplying for over 30 years , Does not understand why he has been cut off , Does not understand why no
chance has been given to him to discuss his bid
Your Answer Has been supplying for over 30 years , Does not understand why he has been cut off , Does not understand why no
chance has been given to him to discuss his bid

True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : It is economical to continue subcontracting the machining of
Exhaust Manifold to vendors.
Correct Answer False
Your Answer False

Multiple Choice Multiple Answer


Question This Question refers to the case of National Engineering Co.
Correct Answer Despatched the consignment by Express Roadlines by truck , Raised the Hundi for the invoiced amount , Did not send
the consignment by Hansa's designated carrier
Your Answer Despatched the consignment by Express Roadlines by truck , Raised the Hundi for the invoiced amount , Did not send the
consignment by Hansa's designated carrier

Multiple Choice Multiple Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : If the Exhaust Manifold is to be manufactured in house, following
are the requirements:-
Correct Answer New jigs and fixtures , Additional shift , Additional manpower
Your Answer New jigs and fixtures , Additional shift , Additional manpower

Multiple Choice Single Answer


Question This Question refers to the case 'Quality Gauges Pvt. Ltd.' : The union, in a meeting with the management opposed the fixation
of performance standards on the ground that :-
Correct Answer It was never heard of
Your Answer It was never heard of

Select The Blank


Question This question refers to case on 'Morbay Engineering Works (MEW)' : Many incentives schemes fail in their ________ due to
'loose standards'.
Correct Answer Objectives
Your Answer Goal

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Kerson Automobiles' : The huge work table placed outside the machine shop can be used
to carry out :-
Correct Answer Filing work , Debarring work , Cleaning work
Your Answer Filing work , Debarring work , Cleaning work

Multiple Choice Single Answer


Question This Question refers to the case of 'National Engineering Co' : GM commented that every department in this company
competes with others in matter of :-
Correct Answer Inefficiency
Your Answer Inefficiency

True/False
Question This question refers to case on 'Morbay Engineering Works (MEW)' : "It is difficult to install an incentive scheme and easy to
withdraw when desired."
Correct Answer False
Your Answer True
Select The Blank
Question This Question refers to the case 'Suyog Udyog' : Number of work stations are to be decided based on assumption that monthly
off take is ________ numbers.
Correct Answer 8000
Your Answer 7000

True/False
Question This Question refers to the case of 'Divgi Metalwares Private Limited' : The order has been finalized from a leading engineering
firm.
Correct Answer False
Your Answer False

Select The Blank


Question This question refers to case on 'Morbay Engineering Works (MEW)' : In Scanlon Plan all employees receive guaranteed
________ wages.
Correct Answer Time
Your Answer Minimum

True/False
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : The management knew the activities involved, their durations
and interrelationship, still are not in position to tell when the project will be completed.
Correct Answer True
Your Answer True

Multiple Choice Single Answer


Question This Question refers to the case 'Indus Foundries Ltd.': The company is faced with following problems :-
Correct Answer Choice of Location
Your Answer Choice of Location

Multiple Choice Multiple Answer


Question This Question refers to the case 'Suyog Udyog' : Operation details are as follows :-
Correct Answer Drill and ream 3 holes, 14 mm dia , Deburr , Mill 2 slots 28 mm wide
Your Answer Drill and ream 3 holes, 14 mm dia , Deburr , Mill 2 slots 28 mm wide

True/False
Question This Question refers to the case of 'Kerson Automobiles' : Some areas can not be used because of odour emanating from
adjoining two painting bays.
Correct Answer True
Your Answer True

Select The Blank


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Duration of project can be reduced if duration of an activity on
________ path is reduced.
Correct Answer Critical
Your Answer Critical

Multiple Choice Multiple Answer


Question This Question refers to 'Uday Electroplating Shop' : It is a small Proprietary concern and :-
Correct Answer Has only three employees , Only one has knowledge and skill of electroplating , Workmen work for max 61/2 hours
Your Answer Has only three employees , Only one has knowledge and skill of electroplating , Workmen work for max 61/2 hours

Select The Blank


Question This Question refers to the case of 'Eagle Machine Company' : The Marketing Manager ________ the finished stock.
Correct Answer Controls
Your Answer Controls

True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : The average efficiency on the other components currently being
produced is around 75%.
Correct Answer True
Your Answer True

Select The Blank


Question This Question refers to the case of 'The Irate Vendor' : Jones had been brought in by a management consultant to ________
the department's buying activities.
Correct Answer Centralize
Your Answer Consolidate

Multiple Choice Multiple Answer


Question This question refers to 'Automotive Gears Private Limited' : For Hob splines Operations, it uses :-
Correct Answer Cleaveland Hobbing machine , Newark Hobbing machine , Thread Milling machine
Your Answer Cleaveland Hobbing machine , Newark Hobbing machine , Thread Milling machine

Match The Following


Question Correct Answer Your Answer
Responsibility for Monthly report on any rejected/obsolete/non-moving items Production /Marketing department With held for the time being

This Question refers to the case of 'Narmada Electricals Ltd.' : Decision whether material is obsolete or otherwise Store Manager Three
times a year

Disposal of waste/obsolete material Once a year Once a year

Storage of scrap material in scrap yard Without identification or any records of quantities Store Manager

Multiple Choice Multiple Answer


Question This question refer to the case on "Allied Industries Pvt Ltd" : Variable cost consists of the following :-
Correct Answer Cost of a pair thread roll , Regrinding charges on thread roll , Power cost
Your Answer Cost of a pair thread roll , Regrinding charges on thread roll , Power cost

Match The Following


Question Correct Answer Your Answer

Equipment cost Capital recovery factor Power cost

This question refer to the case on "Allied Industries Pvt Ltd." : Variable cost Power cost Sealing pump

Fixed cost Space cost Threaded nut

Item Sealing pump Space cost


Multiple Choice Single Answer
Question This Question refers to the case of 'The Gujrat
Engineering company Limited' : It is in the business of
manufacturing of :-
Correct Answer Hydraulic pumps & equipment
Your Answer Hydraulic pumps & equipment

Multiple Choice Single Answer


Question This Question refers to the case of 'Kerson Automobiles'
:The management is worried about the following problem
:-
Correct Answer Deteriorating after sales service
Your Answer Deteriorating after sales service

True/False
Question This Question refers to the case of Narmada Electricals
Ltd. Mr. Jain proposed that for accounting of material,
and to carry out other task, two additional clerks shall be
recruited
Correct Answer True
Your Answer True

Select The Blank


Question This question refers to case on 'Morbay Engineering
Works (MEW)' : Success of wage incentive plans to a
large extent depends on the ________ of performance
standards.
Correct Answer Quality
Your Answer Quality

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Classic Engineering
Components Ltd.' : The company has well established
machine shop having more than 150 machines and :-
Correct Answer A heat treatment shop , Metrology section , Packing
section
Your Answer A heat treatment shop , Metrology section , Packing
section
True/False
Question This Question refers to the case of 'Eagle Machine
Company' : The company buys a variety of material,
ranging from a few ponds of rare metals to sizable
quantities of sheet metal.
Correct Answer True
Your Answer True

True/False
Question This question refers to the case of 'Northern Machinery
Ltd' : As per summary of purchases of the last year,
Material cost as a proportion of sales is 26%.
Correct Answer False
Your Answer False

Multiple Choice Multiple Answer


Question This Question refers to the case 'Indus Foundries
Ltd.':The location of plant has been narrowed down to
following locations :-
Correct Answer Kolhapur , Ahmedabad , Coimbatore
Your Answer Kolhapur , Ahmedabad , Coimbatore

Select The Blank


Question This Question refers to the case 'Quality Gauges Pvt.
Ltd.' : The agreement mentioned that Incentive amount
will be paid along with ________.
Correct Answer Wages
Your Answer Wages

Multiple Choice Single Answer


Question This Question refers to the case of 'K.T Gears' :To study
the company's blanking operations to improve methods
and fix labour performance standards, the company has
constituted :-
Correct Answer An industrial engineering department
Your Answer An industrial engineering department

Multiple Choice Single Answer


Question This Question refers to the case of 'National Engineering
Co.' : Mr. Kher, Material Manager, had talked to supplier
who agreed to take back the 2200 kgs of 22 A/F En 1 in
stock at :-
Correct Answer The rate he sold to them
Your Answer The rate he sold to them

Select The Blank


Question This question refers to 'Automotive Gears Private
Limited' : The company produces items for ________
manufacturers.
Correct Answer Automobile
Your Answer Gear

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers' :
This case is concerned with following element of
production planning:-
Correct Answer Routing
Your Answer Manufacturing Cost reduction

Multiple Choice Multiple Answer


Question This question refers to case on 'Uma Tools Pvt Ltd
(UTPL)' : For calculating fixed labour cost following data
is required:-
Correct Answer Set up time for operation , Labour hour rate , No of
production runs per year
Your Answer Set up time for operation , Labour hour rate

True/False
Question This question refers to 'Automotive Gears Private
Limited' : The table given in the case study gives
approximate machine hour rate for each indicated
machine.
Correct Answer True
Your Answer False

Multiple Choice Single Answer


Question This Question refers to the case of 'Narmada Electricals
Ltd.(NEL)' : Mr. Ashok Rai, General Manager is
concerned about stock of surplus/obsolete material :-
Correct Answer Lyinig in stores
Your Answer Lying in shop floor

Multiple Choice Single Answer


Question This Question refers to the case of 'Northern Machinery
Limited' : Khan had used a paper to deliver a talk to his
senior buyers. This paper contained :-
Correct Answer Summary of purchases
Your Answer Summary of purchases

Multiple Choice Single Answer


Question This Question refers to the case of 'National Engineering
Co' : Mr Deo, Sales Manager argued that if Planning can
supply on time, sales shall ensure that quantities
purchased are :-
Correct Answer Higher
Your Answer Higher

Match The Following


Question Correct Answer Your Answer

Material cost Direct cost Opportunity cost

Capacity cost Unabsorbed overheads Unabsorbed overheads

This question refers to Variable over head Variable over head


case on 'Uma Tools Pvt
Ltd (UTPL)' : Power
cost
Setup cost Fixed labour cost Direct cost

Select The Blank


Question This Question refers to the case of 'National Engineering
Co.' : GM commented that every department in this
company competes with others in matter of ________.
Correct Answer Inefficiency
Your Answer Inefficiency

Multiple Choice Single Answer


Question This Question refers to the case of Narmada Electricals
Ltd.(NEL) : This company is about 15 years old,
manufactures electric motors and caters to the
requirement of :-
Correct Answer Engineering industry and railways
Your Answer Engineering industry and railways

True/False
Question This question refers to case on 'Uma Tools Pvt Ltd
(UTPL)' : The cost of foundry reject is borne by the
company.
Correct Answer True
Your Answer True

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers'
:Kalpak Engineers have contracted from a boiler
company manufacturing of 500 nos of stay bolt. In the
manufacturing process grinding operation is carried out
on following machine :-
Correct Answer Cylindrical grinder
Your Answer Cylindrical grinder

Select The Blank


Question This question refers to case on 'Uma Tools Pvt Ltd
(UTPL)' : Fixed ________ are to be computed only when
machines need to be purchased.
Correct Answer Overhead
Your Answer Cost

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Kerson Automobiles'
: As per the MD, the company is faced with following
problems :-
Correct Answer Union leaders do not work , Lower efficiency of the
mechanics, as they do not work at their place of work ,
Union leaders waste their time
Your Answer Union leaders do not work , Lower efficiency of the
mechanics, as they do not work at their place of work ,
Union leaders waste their time

Select The Blank


Question This question refers to case on 'Uma Tools Pvt Ltd
(UTPL)' : To manufacture exhaust Manifild in-house
additional capacity is required. Extra capacity can be
generated at UTPL by additional ________.
Correct Answer Shift
Your Answer Manpower

Select The Blank


Question The question refer to the case on 'Kalpak Engineers' :
The sawed off pieces from power hacksaw are then
moved to ________ facing and centering machine.
Correct Answer Special- purpose
Your Answer Special- purpose

True/False
Question This Question refers to the case of 'Divgi Metalwares
Private Limited' : The order has been finalized from a
leading engineering firm.
Correct Answer False
Your Answer False

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Geer Company'
: The problems reported are :-
Correct Answer Delays in placing orders , Frequently late deliveries ,
Incorrect ordering quantities
Your Answer Delays in placing orders , Frequently late deliveries ,
Incorrect ordering quantities

True/False
Question This Question refers to the case of 'Kerson Automobiles'
: MD has agreed to carry out modification of existing
plant.
Correct Answer True
Your Answer True

Match The Following


Question Correct Answer Your Answer

Inspection Dimensional accuracy Dimensional accuracy

The question refer to Saw off Saw off


the case on 'Kalpak
Engineers' : First
operation
Consecutive operations Copy turning machine Copy turning machine

Last machining Thread rolling Thread rolling


operation

Select The Blank


Question This question refers to case on 'Uma Tools Pvt Ltd
(UTPL)' : Jigs and fixtures once provided will be able to
maintain accuracy up to about ________ pieces.
Correct Answer 20000
Your Answer 20000

Multiple Choice Multiple Answer


Question This Question refers to the case of 'National Engineering
Co.' : The GM instructed the Finance Manager that in the
next meeting :-
Correct Answer Cutting tools should be analyzed , Stationery should be
analyzed , Every one should sit and devise the action
plan to fix items in these groups & give a time bound
specific program within next two days
Your Answer Cutting tools should be analyzed , Stationery should be
analyzed , Every one should sit and devise the action
plan to fix items in these groups & give a time bound
specific program within next two days

Multiple Choice Multiple Answer


Question This Question refers to the case 'Quality Gauges Pvt.
Ltd.' : Salient features of the scheme were published in
the form of small booklet which indicated :-
Correct Answer Incentive period , Incentive payment , Basis of payment
Your Answer Incentive period , Incentive payment , Basis of payment

True/False
Question This question refers to case on 'Uma Tools Pvt Ltd
(UTPL)' : It is economical to continue subcontracting the
machining of Exhaust Manifold to vendors.
Correct Answer False
Your Answer False

Select The Blank


Question This Question refers to the case of 'Artwood Products' :
The ________ furniture is sold through distributors.
Correct Answer Standard
Your Answer Standard

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Eagle Machine
Company' : Manufacturing Manager handles :-
Correct Answer Production , Inventory control , Receiving
Your Answer Production , Inventory control , Receiving

Multiple Choice Multiple Answer


Question This question refers to case on 'Morbay Engineering
Works (MEW)' : Following are some of the shortcomings
of scanlon plan:-
Correct Answer It rewards workers even if increase in sales is due to
factor like price increase , The plan does not recognize
individual efforts , The increase in labour cost due to
wage agreement may result in lesser incentive bonus to
the workmen
Your Answer It rewards workers even if increase in sales is due to
factor like price increase , The increase in labour cost
due to wage agreement may result in lesser incentive
bonus to the workmen

True/False
Question This question refers to case on 'Uma Tools Pvt Ltd
(UTPL)' : The average efficiency on the other
components currently being produced is around 75%.
Correct Answer True
Your Answer True

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Universal Fasteners
Ltd.' : Mr Sharma, Production Engineer informed Mr.
Kaul that :-
Correct Answer Material testing was done by a worker as Raw Material
Inspector was absent , Visual checking for cracks on
sample basis was carried out , Heat treatment operator
is a new one .
Your Answer Material testing was done by a worker as Raw Material
Inspector was absent , Visual checking for cracks on
sample basis was carried out , Heat treatment operator
is a new one .

Select The Blank


Question This Question refers to the case of 'Eagle Machine
Company' : The Marketing Manager ________ the
finished stock.
Correct Answer Controls
Your Answer Controls

Multiple Choice Single Answer


Question This Question refers to the case of 'Eagle Machine
Company' : The company is facing following problem :-
Correct Answer Sales are declining
Your Answer Sales are declining

True/False
Question This question refer to the case on "Allied Industries Pvt
Ltd" :Capital recovery per annum is an element of fixed
cost.
Correct Answer True
Your Answer True

Multiple Choice Multiple Answer


Question This question refers to case on 'Morbay Engineering
Works (MEW)' : Following are the characteristics of
scalon plan:-
Correct Answer All employees receive a guaranteed time wage ,
Incentive bonus is based on reduction in labour to sales
ratio , A standard for the ratio of labour cost to the total
sales value is set as an index
Your Answer All employees receive a guaranteed time wage ,
Incentive bonus is based on reduction in labour to sales
ratio , A standard for the ratio of labour cost to the total
sales value is set as an index

Multiple Choice Single Answer


Question This Question refers to the case of 'Divgi Metalwares
Private Limited' : The company is manned by :-
Correct Answer Professional managers
Your Answer Professional managers

Multiple Choice Multiple Answer


Question This question refers to 'Automotive Gears Private
Limited' : For Hob splines Operations, it uses :-
Correct Answer Cleaveland Hobbing machine , Newark Hobbing
machine , Thread Milling machine
Your Answer Cleaveland Hobbing machine , Newark Hobbing
machine , Thread Milling machine

Select The Blank


Question This Question refers to the case of 'Divgi Metalwares
Private Limited' : The company has finalized the order
for manufacture of a ________ driven gear.
Correct Answer Speedmeter
Your Answer Speedmeter

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Universal
Fasteners Ltd.' : Mr Sharma, Production
Engineer informed Mr. Kaul that :-
Correct Answer Heat treatment operator is a new one . , Material
testing was done by a worker as Raw Material
Inspector was absent , Visual checking for
cracks on sample basis was carried out
Your Answer Heat treatment operator is a new one . , Material
testing was done by a worker as Raw Material
Inspector was absent , Visual checking for
cracks on sample basis was carried out

Multiple Choice Single Answer


Question This question refer to the case on "Allied
Industries Pvt Ltd" : Following cost element is
considered while calculating total cost of buying
:-
Correct Answer Transport cost
Your Answer Tooling cost

True/False
Question This question refer to the case on "Allied
Industries Pvt Ltd" :Capital recovery per annum
is an element of fixed cost.
Correct Answer True
Your Answer True

Select The Blank


Question This Question refers to the case of 'K.T Gears' :
The cycle time per piece to perform the set of
activities listed adds up to ________.
Correct Answer 2.30 minutes
Your Answer 2.30 minutes

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Kerson
Automobiles' : As per the MD, the company is
faced with following problems :-
Correct Answer Union leaders do not work , Lower efficiency of
the mechanics, as they do not work at their place
of work , Union leaders waste their time
Your Answer Union leaders do not work , Lower efficiency of
the mechanics, as they do not work at their place
of work , Union leaders waste their time

Multiple Choice Single Answer


Question This Question refers to the case of 'The Geer
Company' : The purchase of steel was done
exclusively by :-
Correct Answer One buyer
Your Answer A team of buyers

Select The Blank


Question This Question refers to the case of 'Universal
Fasteners Ltd.' : Personnel Officer Mr. Sinha
informed Mr. Kaul that Employee ________ is
very high.
Correct Answer Turnover
Your Answer Turnover

Multiple Choice Multiple Answer


Question This question refers to 'Automotive Gears
Private Limited' : For Hob splines Operations, it
uses :-
Correct Answer Cleaveland Hobbing machine , Newark Hobbing
machine , Thread Milling machine
Your Answer Cleaveland Hobbing machine , Newark Hobbing
machine , Thread Milling machine

Select The Blank


Question This Question refers to the case 'Quality Gauges
Pvt. Ltd.' : The agreement mentioned that
Incentive amount will be paid along with
________.
Correct Answer Wages
Your Answer Wages

Select The Blank


Question This Question refers to the case of 'Northern
Machinery Limited' : M.D. has asked for
________ from the Vice President.
Correct Answer Explanation
Your Answer Explanation

True/False
Question This Question refers to the case of 'Classic
Engineering Components Ltd.' : Mr. Sen was
informed by Mr. Ravikant, Materials Manager
that counting is not necessary at every stage as
they count at the initial stage and since their
workers and supervisors are experienced, they
can easily identify the components at each stage
of production.
Correct Answer True
Your Answer True

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak
Engineers' :Kalpak Engineers have contracted
from a boiler company manufacturing of 500 nos
of stay bolt. In the manufacturing process
grinding operation is carried out on following
machine :-
Correct Answer Cylindrical grinder
Your Answer Cylindrical grinder

Multiple Choice Multiple Answer


Question This Question refers to the case 'Suyog Udyog' :
The process involves the use of :-
Correct Answer HMT M-2V machine , HMT-2U machine , Investa
Pillar drill
Your Answer HMT M-2V machine , HMT-2U machine , Investa
Pillar drill

Multiple Choice Single Answer


Question This question refers to case on 'Uma Tools Pvt
Ltd (UTPL)' : One of the following is not a
variable overhead:-
Correct Answer Space
Your Answer Space
Select The Blank
Question This question refers to case on 'Weldtech India
Pvt Ltd (WIPL)' : Duration of project can be
reduced if duration of an activity on ________
path is reduced.
Correct Answer Critical
Your Answer Critical

Multiple Choice Single Answer


Question This question refers to case on 'Uma Tools Pvt
Ltd (UTPL)' : Power consumption cost is
considered as :-
Correct Answer Variable overhead cost
Your Answer Variable overhead cost

Select The Blank


Question This Question refers to the case of 'The Irate
Vendor' : As per Jones, the new ________
procedures were sound.
Correct Answer Purchasing
Your Answer Purchasing

Multiple Choice Multiple Answer


Question This Question refers to the case of 'K.T Gears' :
The groove cutting operation is performed by :-
Correct Answer Holding the gear blank on a mandrel in face
plate , Cutting the groove by two tools , One tool
is held in rear side and other held in front side
Your Answer Holding the gear blank on a mandrel in face
plate , Cutting the groove by two tools , One tool
is held in rear side and other held in front side

True/False
Question This Question refers to the case of 'Divgi
Metalwares Private Limited' : The order has
been finalized from a leading engineering firm.
Correct Answer False
Your Answer False
Select The Blank
Question This question refers to 'Automotive Gears
Private Limited' : The company produces items
for ________ manufacturers.
Correct Answer Automobile
Your Answer Automobile

Multiple Choice Multiple Answer


Question This Question refers to the case 'Indus
Foundries Ltd.':The location of plant has been
narrowed down to following locations :-
Correct Answer Kolhapur , Ahmedabad , Coimbatore
Your Answer Kolhapur , Ahmedabad , Coimbatore

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak
Engineers' : Process sheet does not provide
following data:-
Correct Answer Shift
Your Answer Shift

Match The Following


Question Correct Answer Your Answer

Anonymous letter Need to justify No confidence in


received by M.D. Material manager and
Senior buyers
This question refers Seen in top hotels Seen in top hotels
to the case of with suppliers with suppliers
'Northern Machinery
Ltd.' : Senior buyers
Reason for failure to No material facts to No material facts to
convince the Board support the support the
of Directors arguments arguments
Lot of items on the Need to be concise Need to justify
agenda and to the point

Multiple Choice Single Answer


Question This Question refers to the case of 'Eagle
Machine Company' : The President demands
that in the remaining quarter the firm should :-
Correct Answer Break even
Your Answer Break even

Select The Blank


Question This question refers to case on 'Uma Tools Pvt
Ltd (UTPL)' : In machining Exhaust Manifold, no
cutting oil is required as the material is
________.
Correct Answer Cast iron
Your Answer Cast iron

True/False
Question This Question refers to the case 'Quality Gauges
Pvt. Ltd.' : As per union, fixation of time
standards for the gauges will lead to large scale
rejection.
Correct Answer True
Your Answer True

Select The Blank


Question This Question refers to the case of 'The Gujrat
Engineering company Limited' : A compromise
was finally reached in which the supplier agreed
to ________ the cancellation charges.
Correct Answer Withdraw
Your Answer Withdraw

Multiple Choice Multiple Answer


Question The question refer to the case on 'Kalpak
Engineers' : For manufacturing Stay Bolt
following machines are planned:-
Correct Answer Copying Lathe , Radial Drilling Machine , Thread
Rolling machine
Your Answer Copying Lathe , Radial Drilling Machine , Thread
Rolling machine
Multiple Choice Multiple Answer
Question This Question refers to the case of 'Eagle
Machine Company' : Manufacturing Manager
handles :-
Correct Answer Production , Inventory control , Receiving
Your Answer Production , Inventory control , Receiving

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Narmada
Electricals Ltd.' : Other material considered to be
scrap/obsolete is :-
Correct Answer Packing material , Maintenance spares ,
Parts/components
Your Answer Packing material , Maintenance spares ,
Parts/components

True/False
Question This Question refers to the case of 'Classic
Engineering Components Ltd.' : Mr. Sen noticed
that each worker was provided with the drawing
of the component.
Correct Answer False
Your Answer False

Multiple Choice Single Answer


Question This question refers to case on 'Uma Tools Pvt
Ltd (UTPL)' : The case is about decision making
in one of the areas given below:-
Correct Answer Make or Buy
Your Answer Introducing Incentive Scheme

True/False
Question This question refers to the case of 'Northern
Machinery Ltd' : The company's suppliers are of
all sizes and scattered across the country.
Correct Answer True
Your Answer True

True/False
Question This question refers to case on 'Weldtech India
Pvt Ltd (WIPL)' : In order to save time in
construction, ready factory building was
purchased.
Correct Answer True
Your Answer True

Select The Blank


Question This Question refers to the case of 'K.T Gears' :
The problem envisages determining the rate of
________ before and after improvement in the
existing method.
Correct Answer Production
Your Answer Production

True/False
Question This question refers to case on 'Weldtech India
Pvt Ltd (WIPL)' : The management knew the
activities involved, their durations and
interrelationship, still are not in position to tell
when the project will be completed.
Correct Answer True
Your Answer False

Multiple Choice Single Answer


Question This Question refers to the case of 'Hansa
Tractomotive Ltd.' : The machines were
completed by Kay Jee :-
Correct Answer Within the stipulated delivery period
Your Answer Within the stipulated delivery period

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak
Engineers' : This case is concerned with
following element of production planning:-
Correct Answer Routing
Your Answer Routing
True/False
Question This question refers to case on 'Uma Tools Pvt
Ltd (UTPL)' : It is economical to continue
subcontracting the machining of Exhaust
Manifold to vendors.
Correct Answer False
Your Answer False

Multiple Choice Single Answer


Question This question refers to case on 'Morbay
Engineering Works (MEW)' : Incentive schemes
can not be considered to be a substitute of the
following:-
Correct Answer Poor management
Your Answer Low employee earnings

Multiple Choice Multiple Answer


Question This Question refers to the case 'Indus
Foundries Ltd.' :Following items are readily
available at all the three locations :-
Correct Answer Raw materials , Scrap , Foundry chemicals
Your Answer Raw materials , Scrap , Foundry chemicals

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Northern
Machinery Limited' : As per Materials Manager
basis of awarding contract is :-
Correct Answer Justified in each case , All Purchase orders
above Rs. 10,000/- are counter signed by him ,
All Purchase orders above Rs. 50,000/- are
signed by V.P.
Your Answer Justified in each case , All Purchase orders
above Rs. 10,000/- are counter signed by him ,
All Purchase orders above Rs. 50,000/- are
signed by V.P.

True/False
Question This Question refers to the case of 'Hansa
Tractomotive Ltd.' : Kay Jee dispatched the
consignment as per the terms of the order.
Correct Answer False
Your Answer True

Match The Following


Question Correct Answer Your Answer

Activity in CPM Arrow Shortest path

This question refers Project duration Project duration


to case on 'Weldtech
India Pvt Ltd (WIPL)'
: Critical Path
CPM/PERT Project planning/ Project planning/
scheduling technique scheduling technique
Cost overrun Delays in project Delays in project

Multiple Choice Multiple Answer


Question This Question refers to the case of 'K.T Gears' :
The firm is :-
Correct Answer A proprietary firm , Engaged in manufacture of
spur gears , Engaged in manufacture of helical
gear
Your Answer A proprietary firm , Engaged in manufacture of
spur gears , Engaged in manufacture of helical
gear

Multiple Choice Single Answer


Question This Question refers to the case 'Suyog Udyog'
:The management wants to switch over to :-
Correct Answer Line production
Your Answer Line production

Select The Blank


Question This question refers to 'Automotive Gears
Private Limited' : The case study requires
calculation of set up ________ for the job.
Correct Answer Cost
Your Answer Cost
LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Select The Blank


Question This Question refers to the case 'Indus Foundries Ltd.' :
Projected turnover in the first year itself is over ________ crore
rupees.
Correct Answer 20

Your Answer 20

Select The Blank


Question This Question refers to the case of 'National Engineering Co.' :
GM commented that every department in this company
competes with others in matter of ________.
Correct Answer Inefficiency

Your Answer Inefficiency

True/False
Question This Question refers to the case of 'Eagle Machine Company' :
The company buys a variety of material, ranging from a few
ponds of rare metals to sizable quantities of sheet metal.
Correct Answer True

Your Answer True

Multiple Choice Multiple Answer


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : An incentive plan can be considered as a tool for
following:-
Correct Answer Increase productivity , Create more capacity , Reduce
manufacturing costs
Your Answer Increase productivity , Create more capacity , Reduce
manufacturing costs

Select The Blank


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' :
The item exhaust manifold is presently not ________.
Correct Answer Manufactured

Your Answer Manufactured

Select The Blank


Question This Question refers to the case of 'The Gujrat Engineering
company Limited' : A compromise was finally reached in which
the supplier agreed to ________ the cancellation charges.
Correct Answer Withdraw

Your Answer Withdraw

Multiple Choice Single Answer


Question This Question refers to the case of 'Universal Fasteners Ltd.' :
Heat Treatment process for the studs involves two operations
viz :-
Correct Answer Hardening & Tempering

Your Answer Hardening & Tempering

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Classic Engineering
Components Ltd.' : The company has well established machine
shop having more than 150 machines and :-
Correct Answer A heat treatment shop , Metrology section , Packing section

Your Answer A heat treatment shop , Metrology section , Packing section

True/False
Question This Question refers to the case of 'Artwood Products' : It is
necessary to keep stock of standard furniture to cater to sudden
requirement of the customers.
Correct Answer True

Your Answer True

Multiple Choice Single Answer


Question This Question refers to the case of 'Hansa Tractomotive Ltd.' :
The company contracted with Kay Jee Hydraulics Ltd. Bombay
for supply of :-
Correct Answer Filtering & Transfer machines

Your Answer Filtering & Transfer machines

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Kerson Automobiles' : The
huge work table placed outside the machine shop can be used
to carry out :-
Correct Answer Filing work , Debarring work , Cleaning work

Your Answer Filing work , Debarring work , Cleaning work

Multiple Choice Single Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' :
The total labour cost for manufacturing Exhaust Manifold
comprises of the following costs:-

Correct Answer Sum of labour cost for set up time and labor cost for machining

Your Answer Sum of labour cost for set up time and labor cost for machining

True/False
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
Installation of machine should follow recruitment of workmen.
Correct Answer True

Your Answer True

Select The Blank


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : Incentive scheme should not be regarded as a
substitute for ________ wage structure.
Correct Answer Poor

Your Answer Poor

True/False
Question This Question refers to the case of 'The Irate Vendor' : The
President knows that some changes in purchasing policy are
being planned.
Correct Answer True

Your Answer True

Multiple Choice Single Answer


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : MEW management would never say no to customer. If
a customer require material urgently, they would meet his
requirement by doing the following:-
Correct Answer Load the new job on machines in place of existing running
orders
Your Answer Load the new job on machines in place of existing running
orders

True/False
Question This Question refers to the case 'Indus Foundries Ltd.' : Skilled
manpower at worker level is not available in plenty at Kolhapur.
Correct Answer False

Your Answer False

Multiple Choice Multiple Answer


Question This question refers to 'Automotive Gears Private Limited' : The
spline Grinding machine is used for operation :-
Correct Answer Spline Grind (section'AA') , Spline Grind (section'BB') , Spline
Grind (section'CC')
Your Answer Spline Grind (section'AA') , Spline Grind (section'BB') , Spline
Grind (section'CC')

Multiple Choice Multiple Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : For
calculating fixed labour cost following data is required:-
Correct Answer No of production runs per year , Set up time for operation ,
Labour hour rate
Your Answer Set up time for operation , Labour hour rate , No of production
runs per year

Select The Blank


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' :
Each raw casting weighs 0.45 Kgs and costs Rs 4.5 which
includes cost of ________.
Correct Answer Transportation

Your Answer Transportation

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Northern Machinery Limited'
: The writer of anonymous letter :-
Correct Answer Is a share holder of the company , Has the interest of the
shareholders of the company , Wants the Company to put a
stop before it is too late
Your Answer Is a share holder of the company , Has the interest of the
shareholders of the company , Wants the Company to put a
stop before it is too late

True/False
Question This question refers to case on 'Morbay Engineering Works
(MEW)' : "It is difficult to install an incentive scheme and easy to
withdraw when desired."
Correct Answer False

Your Answer False

Match The Following


Question Correct Answer Your Answer

Activity in CPM Arrow Shortest path


This question refers to Project duration Project duration
case on 'Weldtech India
Pvt Ltd (WIPL)' : Critical
Path
CPM/PERT Project planning/ Project planning/
scheduling technique scheduling technique
Cost overrun Delays in project Delays in project

Match The Following


Question Correct Answer Your Answer

Equipment cost Capital recovery factor Capital recovery factor

This question refer to the Power cost Power cost


case on "Allied Industries
Pvt Ltd." : Variable cost
Fixed cost Space cost Space cost

Item Sealing pump Sealing pump

Multiple Choice Multiple Answer


Question This question refers to case on Uma Tools Pvt Ltd (UTPL)' :
Procurement cost per order is computed on the basis of
following data:
Correct Answer Order cost , No of vendors , Frequency of ordering

Your Answer Order cost , No of vendors , Frequency of ordering

Multiple Choice Single Answer


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
For finding out the duration of completion of a project following
technique is not used:-
Correct Answer Project Evaluation and Control Technique

Your Answer Project Evaluation and Control Technique

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Kerson Automobiles' : As
per the MD, the company is faced with following problems :-
Correct Answer Union leaders do not work , Lower efficiency of the mechanics,
as they do not work at their place of work , Union leaders waste
their time
Your Answer Union leaders do not work , Lower efficiency of the mechanics,
as they do not work at their place of work , Union leaders waste
their time
True/False
Question This question refers to the case of 'Northern Machinery Ltd' :
The company's suppliers are of all sizes and scattered across
the country.
Correct Answer True

Your Answer True

Multiple Choice Single Answer


Question This Question refers to the case of 'Artwood Products' : As per
study conducted by Mr. Tahil, it was observed that Artwood's
profitability has :-
Correct Answer Eroded

Your Answer Eroded

Multiple Choice Single Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' :
Process sheet for exhaust manifold provides following
information:-
Correct Answer Jigs and fixtures required

Your Answer Jigs and fixtures required

True/False
Question This Question refers to the case 'Suyog Udyog' : The operation
time for C' sunk 14 dia holes on both sides is 0.50 per piece.
Correct Answer True

Your Answer True

Multiple Choice Multiple Answer


Question The question refer to the case on 'Kalpak Engineers' : Following
are the operations involved in manufacturing stay bolt in the
case:-
Correct Answer Thread Rolling , Copy turning , Drilling

Your Answer Copy turning , Thread Rolling , Drilling

Select The Blank


Question This Question refers to the case 'Quality Gauges Pvt. Ltd.' : The
agreement mentioned that Incentive amount will be paid along
with ________.
Correct Answer Wages

Your Answer Wages


True/False
Question This Question refers to the case 'Quality Gauges Pvt. Ltd.' : As
per union, fixation of time standards for the gauges will lead to
large scale rejection.
Correct Answer True

Your Answer True

Multiple Choice Single Answer


Question This Question refers to the case of 'Autogears Private Limited' :
Time required to pick up a gear and clean its ace and bore in
kerosene is :-
Correct Answer 0.10 minute

Your Answer 0.10 minute

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Eagle Machine Company' :
Manufacturing Manager handles :-
Correct Answer Production , Inventory control , Receiving

Your Answer Production , Inventory contr ol , Receiving

Multiple Choice Multiple Answer


Question This Question refers to the case 'Quality Gauges Pvt. Ltd.' :
Salient features of the scheme were published in the form of
small booklet which indicated :-
Correct Answer Incentive period , Incentive payment , Basis of payment

Your Answer Incentive period , Incentive payment , Basis of payment

Multiple Choice Single Answer


Question This Question refers to the case of 'Eagle Machine Company' :
The President knows that the Purchase department has :-
Correct Answer Fine people

Your Answer Fine people

Select The Blank


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : To
manufacture exhaust Manifild in-house additional capacity is
required. Extra capacity can be generated at UTPL by additional
________.
Correct Answer Shift

Your Answer Shift


Multiple Choice Single Answer
Question The question refer to the case on 'Kalpak Engineers' : This case
is concerned with following element of production planning:-
Correct Answer Routing

Your Answer Routing

Select The Blank


Question This Question refers to the case of 'Eagle Machine Company' :
The purchase department is responsible only for buying and
________.
Correct Answer Expediting

Your Answer Expediting

Select The Blank


Question This question refers to 'Automotive Gears Private Limited' : The
company produces items for ________ manufacturers.
Correct Answer Automobile

Your Answer Automobile

Multiple Choice Single Answer


Question This Question refers to the case of 'Divgi Metalwares Private
Limited' : The table given in the case study gives details of
activities and expected time for the same. It requires
construction of :-
Correct Answer Network diagram of the activities

Your Answer Network diagram of the activities

Multiple Choice Single Answer


Question This Question refers to the case 'Suyog Udyog' : The proprietor
is a :-
Correct Answer Technical person

Your Answer Technical person

True/False
Question This Question refers to the case of 'Kerson Automobiles' : The
decision to utilize gnagway space as "Service Bays" is good.
Correct Answer False

Your Answer False

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Artwood Products' : The cost
of manufacturing has increased due to :-
Correct Answer Blockage of funds in inventory , Longer manufacturing cycle
time , Poor quality of products
Your Answer Blockage of funds in inventory , Longer manufacturing cycle
time , Poor quality of products

Select The Blank


Question The question refer to the case on 'Kalpak Engineers' : Raw
material in the form of bar stock is supplied by the ________.
Correct Answer Customer

Your Answer Customer


LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Select The Blank


Question This Question refers to the case 'Quality Gauges Pvt. Ltd.' :
After the introduction of scheme, shop floor manager has
complained of pressure from workmen for ________.
Correct Answer Overtime

Your Answer Overtime

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Hansa Tractomotive Ltd.':
The contract with Kay Jee Hydraulics Ltd was agreed with
following terms & conditions :-
Correct Answer Price per unit FOR Bombay , Delivery 10-12 weeks after receipt
of buyer's confirmed order , Payment 60 days after dispatch of
material
Your Answer Delivery 10-12 weeks after receipt of buyer's confirmed order ,
Payment 60 days after dispatch of material , Price per unit FOR
Bombay

Multiple Choice Single Answer


Question This Question refers to the case of 'Classic Engineering
Components Ltd.' : The company specializes in manufacturing :-
Correct Answer Precision machined components

Your Answer Precision machined components

Multiple Choice Single Answer


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : One of the most popular and widely used incentive
plan is called by following name:-
Correct Answer Scanlon Plan

Your Answer Scanlon Plan

Multiple Choice Single Answer


Question This Question refers to the case of 'K.T Gears' :To study the
company's blanking operations to improve methods and fix
labour performance standards, the company has constituted :-
Correct Answer An industrial engineering department

Your Answer An industrial engineering department

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Autogears Private Limited' :
Work elements performed by a gear shaving operator are :-
Correct Answer Load gear on mandrel and secure it with a nut , Raise bed to
enable gear teeth to mesh with cutter teeth , Unlock nut and
remove gear from the mandrel
Your Answer Load gear on mandrel and secure it with a nut , Raise bed to
enable gear teeth to mesh with cutter teeth , Unlock nut and
remove gear from the mandrel

Multiple Choice Single Answer


Question This Question refers to the case of 'Northern Machinery Limited'
: The V.P. asked Material Manager to prepare short report to be
presented to board of directors about :-
Correct Answer Buying policies

Your Answer Buying policies

Select The Blank


Question This Question refers to the case of 'Narmada Electricals Ltd.' :
The disposal of material was done on ________ basis.
Correct Answer Weight

Your Answer Weight

True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' :
Cost of reject above 5% machining rejection is borne by the
vendor.
Correct Answer True

Your Answer False

True/False
Question This Question refers to the case 'Quality Gauges Pvt. Ltd.' : The
executives were entitled for incentive bonus.
Correct Answer True

Your Answer True

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers' : Process
sheet does not provide following data:-
Correct Answer Shift

Your Answer Shift

Multiple Choice Multiple Answer


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
For the project following tasks are yet to be completed :-
Correct Answer Purchase of machinery , Purchase of material , Recruitment of
personnel
Your Answer Purchase of machinery , Purchase of material , Recruitment of
personnel

True/False
Question This question refers to 'Automotive Gears Private Limited' : The
table given in the case study gives approximate machine hour
rate for each indicated machine.
Correct Answer True

Your Answer True

Select The Blank


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : Many incentives schemes fail in their ________ due to
'loose standards'.
Correct Answer Objectives

Your Answer Objectives

Select The Blank


Question This Question refers to the case of 'Kerson Automobiles' :
Battery charger placed on one end of table creates ________.
Correct Answer Nuisance

Your Answer Nuisance

Multiple Choice Multiple Answer


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
Following are the activities involved in employee selection for
WIPL :-
Correct Answer Release of advertisement , Finalize job profile , Selecting
candidates
Your Answer Release of advertisement , Finalize job profile , Selecting
candidates

Select The Blank


Question This question refers to 'Automotive Gears Private Limited' : The
case study requires calculation of set up ________ for the job.
Correct Answer Cost

Your Answer Cost

True/False
Question This question refers to the case of 'Northern Machinery Ltd' : As
per summary of purchases of the last year, Material cost as a
proportion of sales is 26%.
Correct Answer False

Your Answer False

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers' :Kalpak
Engineers have contracted from a boiler company
manufacturing of 500 nos of stay bolt. In the manufacturing
process grinding operation is carried out on following machine :-
Correct Answer Cylindrical grinder

Your Answer Cylindrical grinder

Select The Blank


Question The question refer to the case on 'Kalpak Engineers' : The
sawed off pieces from power hacksaw are then moved to
________ facing and centering machine.
Correct Answer Special- purpose

Your Answer Special- purpose

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Irate Vendor' : The old
supplier :-
Correct Answer Has been supplying for over 30 years , Does not understand
why he has been cut off , Does not understand why no chance
has been given to him to discuss his bid
Your Answer Has been supplying for over 30 years , Does not understand
why he has been cut off , Does not understand why no chance
has been given to him to discuss his bid

Select The Blank


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
Delays in completion of ________ would increase Project cost.
Correct Answer Project

Your Answer Project

Multiple Choice Single Answer


Question This Question refers to the case 'Indus Foundries Ltd.':Parveen
Kumar proposed to set up a :-
Correct Answer Cast Iron foundry

Your Answer Cast Iron foundry

True/False
Question This Question refers to the case of 'Classic Engineering
Components Ltd.' : Mr. Sen noticed that each worker was
provided with the drawing of the component.

Correct Answer False

Your Answer False

Multiple Choice Single Answer


Question This question refer to the case on "Allied Industries Pvt Ltd" :
The company is thinking of purchasing thread rolling machine.
The need to purchase has arisen due to :-
Correct Answer In house thread rolling may be economical

Your Answer In house thread rolling may be economical

Multiple Choice Single Answer


Question This Question refers to the case of 'The Geer Company' : The
company had a small foundry until 1946. This was subsequently
closed and the purchase of ferrous castings were handled by :-
Correct Answer A man who had been a supervisor in the foundry

Your Answer A man who had been a supervisor in the foundry

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Kerson Automobiles' : As
per consultants, problems are due to following reasons :-
Correct Answer Material flow (Cars) is not smooth , A major chunk of productive
time is lost in obtaining replacement of spares from stores. , Too
often, helpers are found busy in transferring parts from work
table to a hand trolley.
Your Answer Material flow (Cars) is not smooth , A major chunk of productive
time is lost in obtaining replacement of spares from stores. , Too
often, helpers are found busy in transferring parts from work
table to a hand trolley.

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers' : In the
case for all machining operations following data on time is
furnished:-
Correct Answer Setup time and standard time separately

Your Answer Setup time and standard time separately

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Divgi Metalwares Private
Limited' : As per the Activity description given in the table,
Preparation of operational layout activity affects following
activities :-
Correct Answer Design and draft hobbing fixture , Procure plug gauge , Procure
ring gauge
Your Answer Design and draft hobbing fixture , Procure plug gauge , Procure
ring gauge

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Universal Fasteners Ltd.' :
Mr Banerjee, Manager Quality informed Mr.Kaul that :-
Correct Answer Raw Material received was without test certificate and was not
inspected by the inspector , Laid down procedure for processes
of heat treatment, painting etc. are not followed due to heavy
labour turnover and frequent work allocation , Management has
been requested to get the crack detection machine repaired.
Your Answer Raw Material received was without test certificate and was not
inspected by the inspector , Laid down procedure for processes
of heat treatment, painting etc. are not followed due to heavy
labour turnover and frequent work allocation , Management has
been requested to get the crack detection machine repaired.

Select The Blank


Question This Question refers to the case of 'Hansa Tractomotive Ltd.' :
The loss of consignment was ________.
Correct Answer Total

Your Answer Total

Select The Blank


Question This question refer to the case on "Allied Industries Pvt Ltd" :
One of the assumptions of the case is- other incidental costs
(e.g. paper work, Transport charges for acquiring and regrinding
thread roll) are ________.
Correct Answer Negligible

Your Answer Negligible

Multiple Choice Single Answer


Question This question refer to the case on "Allied Industries Pvt Ltd" :
The company should continue current practice of subcontracting
thread rolling operation if :-
Correct Answer Cost to buy is lower than cost to make

Your Answer Cost to buy is lower than cost to make

True/False
Question This Question refers to the case of 'Universal Fasteners Ltd.' :
Mr. Sharma, Production Engineer informed Mr. Kaul that
Hardening & Tempering was the last operation.
Correct Answer True

Your Answer True


True/False
Question This Question refers to the case of 'Kerson Automobiles' : MD
has agreed to carry out modification of existing plant.
Correct Answer True

Your Answer True

Multiple Choice Single Answer


Question This Question refers to 'Uday Electroplating Shop' : It is a job
order :-
Correct Answer Production unit

Your Answer Production unit

Multiple Choice Single Answer


Question This Question refers to the case of 'National Engineering Co' :
GM commented that every department in this company
competes with others in matter of :-
Correct Answer Inefficiency

Your Answer Inefficiency

True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : It is
economical to continue subcontracting the machining of Exhaust
Manifold to vendors.
Correct Answer False

Your Answer False

Multiple Choice Multiple Answer


Question This Question refers to the case 'Suyog Udyog' : The process
involves the use of :-
Correct Answer HMT M-2V machine , HMT-2U machine , Investa Pillar drill

Your Answer HMT M-2V machine , HMT-2U machine , Investa Pillar drill

True/False
Question This Question refers to the case of 'The Geer Company' : During
the period of rapid expansion, it became necessary to
subcontract a significant volume of machining operations.
Correct Answer True

Your Answer True

Select The Blank


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : Incentive scheme is a tool to create ________
capacity, increase productivity and reduce manufacturing costs.
Correct Answer More

Your Answer More

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Gujrat Engineering
company Limited' : The forged cylinder ordered on new vendor
:-
Correct Answer Was received on schedule , Was priced 15 % lower than the
price of the previous supplier , Had missed out carrying out
some machining operations
Your Answer Was received on schedule , Was priced 15 % lower than the
price of the previous supplier , Had missed out carrying out
some machining operations

Multiple Choice Multiple Answer


Question This Question refers to the case of 'K.T Gears' : The firm is :-

Correct Answer A proprietary firm , Engaged in manufacture of spur gears ,


Engaged in manufacture of helical gear
Your Answer A proprietary firm , Engaged in manufacture of spur gears ,
Engaged in manufacture of helical gear

Multiple Choice Multiple Answer


Question This question refer to the case on "Allied Industries Pvt Ltd" :
Following are cost elements of make indicator :-
Correct Answer Transport cost , Tooling cost , Indirect Employee cost

Your Answer Transport cost , Tooling cost , Indirect Employee cost

Select The Blank


Question This Question refers to the case of 'Northern Machinery Limited'
: M.D. has asked for ________ from the Vice President.
Correct Answer Explanation

Your Answer Explanation


LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Multiple Choice Multiple Answer


Question This Question refers to the case 'Quality Gauges Pvt. Ltd.' : The
consultant made following recommendations :-
Correct Answer Introduction of incentive scheme , Creation of industrial
engineering department , Methods improvement & fixation of
performance standards
Your Answer Creation of industrial engineering department , Methods
improvement & fixation of performance standards , Introduction
of incentive scheme

Select The Blank


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : Overtime must be ________ to guarantee the success
of the wage incentive scheme.
Correct Answer Eliminative

Your Answer Eliminative

True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' :
The average efficiency on the other components currently being
produced is around 75%.
Correct Answer True

Your Answer True

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Universal Fasteners Ltd.' :
Mr Sharma, Production Engineer informed Mr. Kaul that :-
Correct Answer Material testing was done by a worker as Raw Material
Inspector was absent , Visual checking for cracks on sample
basis was carried out , Heat treatment operator is a new one .
Your Answer Material testing was done by a worker as Raw Material
Inspector was absent , Visual checking for cracks on sample
basis was carried out , Heat treatment operator is a new one .

Multiple Choice Multiple Answer


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : Following systems are prerequisites for an incentive
scheme:-
Correct Answer Good production planning and control system , Good Inspection
and quality control system , Sound system of accounting
operators daily output
Your Answer Good production planning and control system , Good Inspection
and quality control system , Sound system of accounting
operators daily output , Efficient wage payment system
Multiple Choice Single Answer
Question This question refers to case on 'Morbay Engineering Works
(MEW) : Weakest area of functioning of MEW is:-
Correct Answer Inability to say no to customers

Your Answer Inability to say no to customers

Multiple Choice Single Answer


Question This Question refers to the case of 'The Gujrat Engineering
company Limited' : The company also executes :-
Correct Answer Rush orders

Your Answer Rush orders

Select The Blank


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' :
Fixed ________ are to be computed only when machines need
to be purchased.
Correct Answer Overhead

Your Answer Overhead

Multiple Choice Single Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' :
This case is on make-buy decision for an item. Name of that
item is one of the below :-
Correct Answer Exhaust Manifold

Your Answer Exhaust Manifold

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Divgi Metalwares Private
Limited' : The new items contracted by the company are
handled by the development department for :-
Correct Answer Submission of samples , Manufacture of one or two production
lots , Transfer to manufacturing department for regular
production, after successful development
Your Answer Submission of samples , Manufacture of one or two production
lots , Transfer to manufacturing department for regular
production, after successful development

True/False
Question This question refers to case on Morbay Engineering Works
(MEW).Overtime tend to reward more than incentive scheme.
Correct Answer True

Your Answer True


Multiple Choice Single Answer
Question This Question refers to the case of 'Universal Fasteners Ltd.' :
During meeting with Director(Operations) of GVL, it was
informed that in the event of any non-conformity during
guarantee :-
Correct Answer GVL has to pay heavy penalty for studs

Your Answer Universal Fasteners Ltd. will have to pay 1 million dollar as
penalty

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Classic Engineering
Components Ltd.' : The company supplies components to :-
Correct Answer Automobile industries , Printing machines , Machine tool &
process equipment industries
Your Answer Automobile industries , Printing machines , Machine tool &
process equipment industries

Select The Blank


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
Delays in execution of project leads to cost ________.
Correct Answer Overrun

Your Answer Increase

Multiple Choice Multiple Answer


Question This Question refers to the case of 'K.T Gears' : The groove
cutting operation is performed by :-
Correct Answer One tool is held in rear side and other held in front side , Holding
the gear blank on a mandrel in face plate , Cutting the groove by
two tools
Your Answer Cutting the groove by two tools , One tool is held in rear side
and other held in front side , Holding the gear blank on a
mandrel in face plate

Multiple Choice Single Answer


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : Following practice if prevalent, must be eliminated to
guarantee success of wage incentive scheme : -
Correct Answer Overtime

Your Answer Overtime

Multiple Choice Single Answer


Question This Question refers to the case of 'Northern Machinery Limited'
: Khan had used a paper to deliver a talk to his senior buyers.
This paper contained :-
Correct Answer Summary of purchases
Your Answer Summary of purchases

Select The Blank


Question This Question refers to the case of 'K.T Gears' : The problem
envisages determining the rate of ________ before and after
improvement in the existing method.
Correct Answer Production

Your Answer Production

Multiple Choice Single Answer


Question This Question refers to the case 'Quality Gauges Pvt. Ltd.' : The
union, in a meeting with the management opposed the fixation
of performance standards on the ground that :-
Correct Answer It was never heard of

Your Answer It was never heard of

Select The Blank


Question This Question refers to the case of 'Hansa Tractomotive Ltd.' :
Enroute to Delhi, the truck collided with an incoming ________.
Correct Answer Tractor Trailer

Your Answer Tractor Trailer

Select The Blank


Question This Question refers to the case of 'Divgi Metalwares Private
Limited' : The company has finalized the order for manufacture
of a ________ driven gear.
Correct Answer Speedmeter

Your Answer Speedmeter

True/False
Question This Question refers to the case of 'Narmada Electricals Ltd.'
:The rates of scrap were reviewed from time to time.
Correct Answer False

Your Answer True

Match The Following


Question Correct Answer Your Answer

Machine shop congested Shortage of space Shortage of space


with semi-processed
material kept in the bins
and components lying on
the floors all around.
This Question refers to Shared by operators Shared by operators
the case of 'Classic
Engineering Components
Ltd.' : Measuring
instruments like vernier
calipers, micrometers or
gauges
Unispected lots Processed Identifiable by tags and
markings
Responsibility of oiling Maintenance department Maintenance department
/greasing

Select The Blank


Question This Question refers to the case of 'Universal Fasteners Ltd.' : In
the tempering process of studs, the ________ was reduced to
25-28 HRC.
Correct Answer Hardness

Your Answer Hardness

Multiple Choice Single Answer


Question This question refer to the case on "Allied Industries Pvt Ltd" :
Following cost element is not considered while calculating total
cost of thread rolling in-house :-
Correct Answer Transport cost

Your Answer Transport cost

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Geer Company' :
Problems got created due to :-
Correct Answer Added work load in purchasing , Divided buying responsibilities ,
Number of inexperienced buyers
Your Answer Added work load in purchasing , Divided buying responsibilities ,
Number of inexperienced buyers

True/False
Question This Question refers to the case of 'Universal Fasteners Ltd.' :
The organization has reputation for poor deliveries.
Correct Answer False

Your Answer True

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Narmada Electricals Ltd.' :
Production or Quality department decide when these become
surplus/obsolete :-

Correct Answer Part , Component , Item

Your Answer Part , Component , Item

Multiple Choice Single Answer


Question This Question refers to the case 'Quality Gauges Pvt. Ltd.' : The
scheme shall apply to :-
Correct Answer Each and every employee

Your Answer Each and every employee

Multiple Choice Single Answer


Question This Question refers to the case of 'K.T Gears' : One of the
operations recently studied by the methods study practitioner at
this company concerns is :-
Correct Answer Cutting of groove in a sliding gear

Your Answer Cutting of groove in a sliding gear

True/False
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
In order to save time in construction, ready factory building was
purchased.
Correct Answer True

Your Answer True

Select The Blank


Question This Question refers to the case 'Suyog Udyog' : Number of
work stations are to be decided based on assumption that
monthly off take is ________ numbers.
Correct Answer 8000

Your Answer 8000

Multiple Choice Single Answer


Question This Question refers to the case of 'The Irate Vendor' : Tom
Jones has been hired as Purchasing director for a company
which is a :-
Correct Answer Medium sized food products firm

Your Answer Medium sized food products firm

Select The Blank


Question This Question refers to the case of 'The Irate Vendor' : As per
Jones, the new ________ procedures were sound.
Correct Answer Purchasing

Your Answer Purchasing

True/False
Question This Question refers to the case of 'Hansa Tractomotive Ltd.' :
Kay Jee dispatched the consignment as per the terms of the
order.
Correct Answer False

Your Answer False

Select The Blank


Question This Question refers to the case of 'Artwood Products' : Entire
shop floor was ________ due to piles of work in progress.
Correct Answer Congested

Your Answer Congested

Multiple Choice Multiple Answer


Question This question refers to 'Automotive Gears Private Limited' : For
Hob splines Operations, it uses :-
Correct Answer Cleaveland Hobbing machine , Newark Hobbing machine ,
Thread Milling machine
Your Answer Cleaveland Hobbing machine , Newark Hobbing machine ,
Thread Milling machine , Keyway milling machine

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Geer Company' : The
problems reported are :-
Correct Answer Delays in placing orders , Frequently late deliveries , Incorrect
ordering quantities
Your Answer Delays in placing orders , Frequently late deliveries , Incorrect
ordering quantities

True/False
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
Project duration can always be reduced by deploying additional
recourses.
Correct Answer False

Your Answer True

Multiple Choice Single Answer


Question This Question refers to the case 'Indus Foundries Ltd.' :In the
proposed plant, heating of charge is to be done by : -
Correct Answer Induction furnace

Your Answer Induction furnace

True/False
Question This Question refers to the case of 'The Gujrat Engineering
company Limited' : The company received an order and finally
authorized completion of the forging and placed it in stock.
Correct Answer False

Your Answer True

True/False
Question This Question refers to the case of 'Kerson Automobiles' : Some
areas can not be used because of odour emanating from
adjoining two painting bays.
Correct Answer True

Your Answer True

Multiple Choice Multiple Answer


Question This Question refers to the case of 'National Engineering Co.' :
The GM instructed the Finance Manager that in the next
meeting :-
Correct Answer Cutting tools should be analyzed , Stationery should be
analyzed , Every one should sit and devise the action plan to fix
items in these groups & give a time bound specific program
within next two days
Your Answer Cutting tools should be analyzed , Stationery should be
analyzed , Every one should sit and devise the action plan to fix
items in these groups & give a time bound specific program
within next two days

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Gujrat Engineering
company Limited' : The company has received a special order
where :-
Correct Answer A special cylinder is to be manufactured. , The item is to be
manufactured from a hollow bored forging , Fastest delivery is
requested
Your Answer A special cylinder is to be manufactured. , The item is to be
manufactured from a hollow bored forging , Fastest delivery is
requested

Select The Blank


Question This Question refers to the case of 'Classic Engineering
Components Ltd.' : It was observed that there was no ________
or any marking system to know identification of the components,
their status in terms of acceptance/rejection and quantity of the
components in the bins.
Correct Answer Tag

Your Answer Tag

True/False
Question This Question refers to the case of 'K.T Gears' : The activities
performed by the operator are listed on the practitioner's data
sheet.
Correct Answer True

Your Answer True

Match The Following


Question Correct Answer Your Answer

Shop floor mangers Overtime Overtime


pressurized to give
This Question refers to Increase in sales price Increase in sales price
the case 'Quality Gauges
Pvt. Ltd.' : Qualifying
amount shall be raised
with
Incentive will be paid on Basic salary of each Basic salary of each
employee employee
Basis of payment on Total output in terms of Total output in terms of
value of production value of production
CASES OF OPERATIONS MANAGEMENT

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Select The Blank


Question This Question refers to the case of 'Narmada Electricals Ltd.' : The disposal of
material was done on ________ basis.
Correct Answer Weight

Your Answer Weight

Select The Blank


Question This Question refers to the case of 'National Engineering Co.' : GM commented
that every department in this company competes with others in matter of
________.
Correct Answer Inefficiency

Your Answer Inefficiency

Select The Blank


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Delays in
execution of project leads to cost ________.
Correct Answer Overrun

Your Answer Overrun

True/False
Question This Question refers to the case of 'Artwood Products' : It is necessary to keep
stock of standard furniture to cater to sudden requirement of the customers.
Correct Answer True

Your Answer True

Multiple Choice Single Answer


Question This Question refers to 'Automotive Gears Private Limited' : The company, for its
various items, has recently introduced the concept of :-
Correct Answer Economic lot size

Your Answer Economic lot size

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Narmada Electricals Ltd.' : Other material
considered to be scrap/obsolete is :-
Correct Answer Packing material , Maintenance spares , Parts/components

Your Answer Packing material , Maintenance spares , Parts/components , Electric motors

True/False
Question This Question refers to the case of 'Kerson Automobiles' : MD has agreed to carry
out modification of existing plant.
Correct Answer True

Your Answer True

1
Multiple Choice Single Answer
Question This Question refers to the case of Narmada Electricals Ltd.: G.M. recruited a
senior purchase manager, Mr. Sajid Durrani in the purchased department :-
Correct Answer In view of need to procure parts/components for development in time

Your Answer In view of need to procure parts/components for development in time

Multiple Choice Single Answer


Question This question refers to case on 'Morbay Engineering Works (MEW)' : Following
was the solution conceived by the Production Manager to the need of increasing
production:-
Correct Answer Introduction of incentive scheme

Your Answer Introduction of incentive scheme

Select The Blank


Question This question refers to case on 'Morbay Engineering Works (MEW)' : Overtime
must be ________ to guarantee the success of the wage incentive scheme.
Correct Answer Eliminative

Your Answer Eliminative

Multiple Choice Multiple Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : If the Exhaust
Manifold is manufactured in house, following costs wll increase:-
Correct Answer Cost of power , Cost of labour , Cost of consumables like grease, lubricant

Your Answer Cost of power , Cost of labour , Cost of consumables like grease, lubricant , Fixed
overheads

Multiple Choice Single Answer


Question This Question refers to the case of 'The Geer Company' : The purchase of steel
was done exclusively by :-
Correct Answer One buyer

Your Answer One buyer

Multiple Choice Single Answer


Question This Question refers to the case of 'Kerson Automobiles' : Cars are manually
pushed over the wooden stand placed in the major repairs section because of :-
Correct Answer Absence of the underground pit

Your Answer Absence of the underground pit

True/False
Question This question refers to case on 'Morbay Engineering Works (MEW)' : Under
Scanlon Plan employee is paid incentive bonus based on individual efforts and
additional output.
Correct Answer True

Your Answer True

True/False
Question This Question refers to the case of 'The Geer Company' : During the period of
rapid expansion, it became necessary to subcontract a significant volume of

2
machining operations.

Correct Answer True

Your Answer True

Multiple Choice Single Answer


Question This Question refers to the case of 'K.T Gears' : The groove cutting operation is
performed at the :-
Correct Answer Capston lathe

Your Answer Capston lathe

Multiple Choice Single Answer


Question This question refer to the case on "Allied Industries Pvt Ltd" : Following cost
element is considered while calculating total cost of buying :-
Correct Answer Transport cost

Your Answer Transport cost

Multiple Choice Multiple Answer


Question This Question refers to the case 'Indus Foundries Ltd.' :Following items are readily
available at all the three locations :-
Correct Answer Raw materials , Scrap , Foundry chemicals

Your Answer Raw materials , Scrap , Foundry chemicals , Manpower

Match The Following


Question Correct Answer Your Answer

Capacity cost Unabsorbed overheads Unabsorbed overheads

This question refers to case on Variable over head Variable over head
'Uma Tools Pvt Ltd (UTPL)' :
Power cost
Setup cost Fixed labour cost Marginal cost

Material cost Direct cost Direct cost

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Northern Machinery Limited' : As per Materials
Manager basis of awarding contract is :-
Correct Answer Justified in each case , All Purchase orders above Rs. 10,000/- are counter signed
by him , All Purchase orders above Rs. 50,000/- are signed by V.P.
Your Answer Justified in each case , All Purchase orders above Rs. 10,000/- are counter signed
by him , All Purchase orders above Rs. 50,000/- are signed by V.P. , Case to case
basis

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Divgi Metalwares Private Limited' : As per the
Activity description given in the table, Preparation of operational layout activity
affects following activities :-
Correct Answer Design and draft hobbing fixture , Procure plug gauge , Procure ring gauge

Your Answer Design and draft hobbing fixture , Procure plug gauge , Procure ring gauge ,
Manufacture hobbing fixture

3
Multiple Choice Multiple Answer
Question This Question refers to the case of 'Kerson Automobiles' : As per the MD, the
company is faced with following problems :-
Correct Answer Union leaders do not work , Lower efficiency of the mechanics, as they do not
work at their place of work , Union leaders waste their time
Your Answer Union leaders do not work , Lower efficiency of the mechanics, as they do not
work at their place of work , Union leaders waste their time , Unsatisfactory layout

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers' :Kalpak Engineers have
contracted from a boiler company manufacturing of 500 nos of stay bolt. In the
manufacturing process grinding operation is carried out on following machine :-
Correct Answer Cylindrical grinder

Your Answer Cylindrical grinder

Select The Blank


Question This Question refers to the case of 'Artwood Products' : Entire shop floor was
________ due to piles of work in progress.
Correct Answer Congested

Your Answer Congested

Multiple Choice Single Answer


Question This Question refers to the case of 'Hansa Tractomotive Ltd.' : The machines were
completed by Kay Jee :-
Correct Answer Within the stipulated delivery period

Your Answer Within the stipulated delivery period

Select The Blank


Question This Question refers to the case of 'Kerson Automobiles' : The pedestal grinder
mounted on the huge work table, gives out ________ and blows out dust.
Correct Answer Sparks

Your Answer Sparks

Multiple Choice Single Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Process sheet for
exhaust manifold provides following information:-
Correct Answer Jigs and fixtures required

Your Answer Utilization of machine planned

Multiple Choice Single Answer


Question This question refers to case on Uma Tools Pvt Ltd (UTPL)' : Presently the raw
castings are procured by UTPL and given to machining to three vendors. If UTPL
has to manufacture Exhaust Manifold in house it would have to provide one of the
following:
Correct Answer New jigs and fixtures

Your Answer New jigs and fixtures

Match The Following

4
Question Correct Answer Your Answer

Mechanics going to clerk with Get the replacements Get the replacements
requisition authorization authorization
This Question refers to the case Obtaining replacement of Obtaining replacement of spares
of 'Kerson Automobiles' : Loss spares from stores from stores
of productive time
Transfer of parts from work Blowing off parts clean with Blowing off parts clean with
table to a hand trolley and compressed air compressed air
pushing it out to the service bay
Space for storage of seats Avoid wasteful movements Avoid wasteful movements
inside the workshop

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Irate Vendor' : The old supplier :-

Correct Answer Has been supplying for over 30 years , Does not understand why he has been cut
off , Does not understand why no chance has been given to him to discuss his bid
Your Answer Has been supplying for over 30 years , Does not understand why he has been cut
off , Does not understand why no chance has been given to him to discuss his bid
, Is always asked his opinion about quantity to be ordered

True/False
Question This Question refers to the case of 'K.T Gears' : The activities performed by the
operator are listed on the practitioner's data sheet.
Correct Answer True

Your Answer True

True/False
Question This Question refers to the case of 'Classic Engineering Components Ltd.' : Mr.
Sen noticed that each worker was provided with the drawing of the component.
Correct Answer False

Your Answer False

Select The Blank


Question This Question refers to the case of 'Northern Machinery Limited' : The V.P.
instructed Materials Manager to collect ________ information and evidence to
clarify that their system is foolproof.
Correct Answer Relevant

Your Answer Relevant

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Autogears Private Limited' : Work elements
performed by a gear shaving operator are :-
Correct Answer Load gear on mandrel and secure it with a nut , Raise bed to enable gear teeth to
mesh with cutter teeth , Unlock nut and remove gear from the mandrel
Your Answer Load gear on mandrel and secure it with a nut , Raise bed to enable gear teeth to
mesh with cutter teeth , Unlock nut and remove gear from the mandrel , Raise oil
guard and switch on the machine

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Artwood Products' : The cost of manufacturing
has increased due to :-

5
Correct Answer Blockage of funds in inventory , Longer manufacturing cycle time , Poor quality of
products
Your Answer Blockage of funds in inventory , Longer manufacturing cycle time , Poor quality of
products , Non availability of skilled labour

Select The Blank


Question This Question refers to the case of 'K.T Gears' : The cycle time per piece to
perform the set of activities listed adds up to ________.
Correct Answer 2.30 minutes

Your Answer 2.30 minutes

Select The Blank


Question This Question refers to the case of 'Universal Fasteners Ltd.' : Personnel Officer
Mr. Sinha informed Mr. Kaul that Employee ________ is very high.
Correct Answer Turnover

Your Answer Turnover

Multiple Choice Single Answer


Question This Question refers to the case of 'National Engineering Co.' : As per GM, the
route cause of this non-sensical situation is lack of :-
Correct Answer Co-ordination

Your Answer Co-ordination

Multiple Choice Single Answer


Question This Question refers to the case of 'The Geer Company' : The company had a
small foundry until 1946. This was subsequently closed and the purchase of
ferrous castings were handled by :-
Correct Answer A man who had been a supervisor in the foundry

Your Answer A man who had been a supervisor in the foundry

Multiple Choice Multiple Answer


Question This question refers to case on 'Morbay Engineering Works (MEW)' : An incentive
plan can be considered as a tool for following:-
Correct Answer Increase productivity , Create more capacity , Reduce manufacturing costs

Your Answer Increase productivity , Create more capacity , Reduce manufacturing costs ,
Increase sales

True/False
Question This question refers to 'Automotive Gears Private Limited' : The table given in the
case study gives approximate machine hour rate for each indicated machine.
Correct Answer True

Your Answer True

Select The Blank


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : To manufacture
exhaust Manifild in-house additional capacity is required. Extra capacity can be
generated at UTPL by additional ________.
Correct Answer Shift

Your Answer Shift

6
True/False
Question This Question refers to the case of 'Universal Fasteners Ltd.' : Mr. Sharma,
Production Engineer informed Mr. Kaul that Hardening & Tempering was the last
operation.
Correct Answer True

Your Answer True

Multiple Choice Multiple Answer


Question This Question refers to the case of 'K.T Gears' : The firm is :-

Correct Answer A proprietary firm , Engaged in manufacture of spur gears , Engaged in


manufacture of helical gear
Your Answer A proprietary firm , Engaged in manufacture of spur gears , Engaged in
manufacture of helical gear , Engaged in manufacture of cutting gears

Multiple Choice Multiple Answer


Question This question refer to the case on "Allied Industries Pvt Ltd" : Following are cost
elements of make indicator :-
Correct Answer Transport cost , Tooling cost , Indirect Employee cost

Your Answer Transport cost , Tooling cost , Indirect Employee cost , Power cost

True/False
Question This Question refers to the case of 'Classic Engineering Components Ltd.' : Mr.
Sen was informed by Mr. Ravikant, Materials Manager that counting is not
necessary at every stage as they count at the initial stage and since their workers
and supervisors are experienced, they can easily identify the components at each
stage of production.
Correct Answer True

Your Answer True

True/False
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Project duration
can always be reduced by deploying additional recourses.
Correct Answer False

Your Answer False

ND
2 COPY

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

True/False
Question This Question refers to the case of 'Divgi Metalwares Private Limited' :
The order has been finalized from a leading engineering firm.
Correct Answer False

Your Answer True

True/False
Question This Question refers to the case of 'Autogears Private Limited' : It takes
0.2 minutes to measure dimensions and set aside gear into the trolley.

7
Correct Answer True

Your Answer True

Multiple Choice Single Answer


Question This Question refers to the case of 'Eagle Machine Company' : The
President demands that in the remaining quarter the firm should :-
Correct Answer Break even

Your Answer Break even

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Narmada Electricals Ltd.' : Production
or Quality department decide when these become surplus/obsolete :-
Correct Answer Part , Component , Item

Your Answer Part , Component , Item , Material

Multiple Choice Multiple Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : While making
Make or Buy decisions, Buy indicator includes following costs :-
Correct Answer Raw material cost , Purchase cost , Fixed overhead cost

Your Answer Raw material cost , Variable overhead cost , Purchase cost , Fixed
overhead cost

Multiple Choice Multiple Answer


Question This question refer to the case on "Allied Industries Pvt Ltd" : Following
are cost elements of make indicator :-
Correct Answer Transport cost , Tooling cost , Indirect Employee cost

Your Answer Transport cost , Tooling cost , Indirect Employee cost , Power cost

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Gujrat Engineering company
Limited' : The forged cylinder ordered on new vendor :-
Correct Answer Was received on schedule , Was priced 15 % lower than the price of the
previous supplier , Had missed out carrying out some machining
operations

Your Answer Was received on schedule , Was priced 15 % lower than the price of the
previous supplier , Had missed out carrying out some machining
operations , Was of sub standard quality

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Divgi Metalwares Private Limited' :
The new items contracted by the company are handled by the
development department for :-
Correct Answer Submission of samples , Manufacture of one or two production lots ,
Transfer to manufacturing department for regular production, after
successful development
Your Answer Submission of samples , Manufacture of one or two production lots ,
Transfer to manufacturing department for regular production, after
successful development , Transfer to sales department for sales, after
successful development

Multiple Choice Multiple Answer

8
Question This Question refers to the case 'Indus Foundries Ltd.' :Following items
are readily available at all the three locations :-
Correct Answer Raw materials , Scrap , Foundry chemicals

Your Answer Manpower , Raw materials , Scrap , Foundry chemicals

Multiple Choice Multiple Answer


Question This Question refers to the case 'Indus Foundries Ltd.':The location of
plant has been narrowed down to following locations :-
Correct Answer Kolhapur , Ahmedabad , Coimbatore

Your Answer Kolhapur , Ahmedabad , Coimbatore , Nasik

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Universal Fasteners Ltd.' : Mr
Banerjee, Manager Quality informed Mr.Kaul that :-
Correct Answer Raw Material received was without test certificate and was not inspected
by the inspector , Laid down procedure for processes of heat treatment,
painting etc. are not followed due to heavy labour turnover and frequent
work allocation , Management has been requested to get the crack
detection machine repaired.
Your Answer Raw Material received was without test certificate and was not inspected
by the inspector , Laid down procedure for processes of heat treatment,
painting etc. are not followed due to heavy labour turnover and frequent
work allocation , Management has been requested to get the crack
detection machine repaired. , Broken studs were not hardened

Match The Following


Question Correct Answer Your Answer

Machine shop congested with Shortage of space Shortage of space


semi-processed material kept
in the bins and components
lying on the floors all around.
This Question refers to the Shared by operators Shared by operators
case of 'Classic Engineering
Components Ltd.' :
Measuring instruments like
vernier calipers, micrometers
or gauges
Unispected lots Processed Identifiable by tags and
markings
Responsibility of oiling Maintenance department Maintenance department
/greasing

Select The Blank


Question This Question refers to the case of 'Kerson Automobiles' : The pedestal
grinder mounted on the huge work table, gives out ________ and blows
out dust.
Correct Answer Sparks

Your Answer Sparks

Multiple Choice Single Answer


Question This Question refers to the case of 'Classic Engineering Components Ltd.'
: This company was acquired by Das Group of Industries. Mr. Mohit
Sen,(head of Business planning function in the corporate office) was

9
visiting the factory as its :-

Correct Answer Turn over was stagnating

Your Answer Turn over was stagnating

Multiple Choice Single Answer


Question This Question refers to the case of 'Divgi Metalwares Private Limited' :
The company is manned by :-
Correct Answer Professional managers

Your Answer Professional managers

Multiple Choice Multiple Answer


Question This question refers to case on 'Morbay Engineering Works (MEW)' :
Following systems are prerequisites for an incentive scheme:-
Correct Answer Good production planning and control system , Good Inspection and
quality control system , Sound system of accounting operators daily
output
Your Answer Good production planning and control system , Good Inspection and
quality control system , Sound system of accounting operators daily
output , Efficient wage payment system

Multiple Choice Multiple Answer


Question This Question refers to the case of 'K.T Gears' : The firm is :-

Correct Answer A proprietary firm , Engaged in manufacture of spur gears , Engaged in


manufacture of helical gear
Your Answer A proprietary firm , Engaged in manufacture of spur gears , Engaged in
manufacture of helical gear , Engaged in manufacture of cutting gears

Select The Blank


Question This Question refers to the case 'Suyog Udyog' : Number of work stations
are to be decided based on assumption that monthly off take is ________
numbers.
Correct Answer 8000

Your Answer 8000

Multiple Choice Single Answer


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : The basic
management problem of WIPL in context of the project is following :-
Correct Answer On which date the project will be completed

Your Answer On which date the project will be completed

Multiple Choice Multiple Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : If the Exhaust
Manifold is to be manufactured in house, following are the requirements:-
Correct Answer New jigs and fixtures , Additional shift , Additional manpower

Your Answer New jigs and fixtures , Additional shift , Additional manpower , Additional
machinery

Select The Blank


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Delays in
completion of ________ would increase Project cost.

10
Correct Answer Project

Your Answer Project

Multiple Choice Single Answer


Question This Question refers to the case of 'Kerson Automobiles' : Distance
traveled every day, by a mechanic to get replacement from stores is :-
Correct Answer 4 to 6 miles

Your Answer 4 to 6 miles

Select The Blank


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : To
manufacture exhaust Manifild in-house additional capacity is required.
Extra capacity can be generated at UTPL by additional ________.
Correct Answer Shift

Your Answer Shift

Multiple Choice Single Answer


Question This question refers to case on 'Morbay Engineering Works (MEW)':
Following is not the prerequisite for sound incentive scheme:-
Correct Answer Existence of union

Your Answer Reporting System for daily production of workers

Multiple Choice Multiple Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : If the Exhaust
Manifold is manufactured in house, following costs wll increase:-
Correct Answer Cost of power , Cost of labour , Cost of consumables like grease, lubricant

Your Answer Cost of power , Cost of labour , Cost of consumables like grease, lubricant
, Fixed overheads

Select The Blank


Question This Question refers to the case of 'The Geer Company' : The volume of
growth tripled due to ________ management.
Correct Answer Aggressive

Your Answer Aggressive

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Irate Vendor' : The President's
memorandum says :-
Correct Answer We have treated this supplier unfairly , He would like to see if his
complaint is justified , The Vendor's letter suggests that we do not have a
policy on evaluating our vendors
Your Answer We have treated this supplier unfairly , He would like to see if his
complaint is justified , The Vendor's letter suggests that we do not have a
policy on evaluating our vendors , The vendor always quotes high price of
finished goods

Select The Blank


Question This Question refers to the case of 'Divgi Metalwares Private Limited' :
The company has finalized the order for manufacture of a ________
driven gear.

11
Correct Answer Speedmeter

Your Answer Speedmeter

Select The Blank


Question This question refers to case on 'Morbay Engineering Works (MEW)' :
Success of wage incentive plans to a large extent depends on the
________ of performance standards.
Correct Answer Quality

Your Answer Quality

True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : The average
efficiency on the other components currently being produced is around
75%.
Correct Answer True

Your Answer True

True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : It is
economical to continue subcontracting the machining of Exhaust Manifold
to vendors.
Correct Answer False

Your Answer False

Select The Blank


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Delays in
execution of project leads to cost ________.
Correct Answer Overrun

Your Answer Overrun

Multiple Choice Single Answer


Question This Question refers to the case 'Quality Gauges Pvt. Ltd.' : With the
introduction of the scheme :-
Correct Answer The sales picked up

Your Answer The sales picked up

Select The Blank


Question This Question refers to the case of 'National Engineering Co.' : GM
commented that every department in this company competes with others
in matter of ________.
Correct Answer Inefficiency

Your Answer Productivity

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Irate Vendor' : The old supplier :-

Correct Answer Has been supplying for over 30 years , Does not understand why he has
been cut off , Does not understand why no chance has been given to him

12
to discuss his bid

Your Answer Has been supplying for over 30 years , Does not understand why he has
been cut off , Does not understand why no chance has been given to him
to discuss his bid , Is always asked his opinion about quantity to be
ordered

13
LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Hansa Tractomotive Ltd.' :
After completion of manufacturing, Jay Jee took following actions
:-
Correct Answer Dispatched the consignment by Express Roadlines by truck ,
Raised the Hundi for the invoiced amount , Did not send the
consignment by Hansa's designated carrier
Your Answer Did not send the consignment by Hansa's designated carrier ,
Dispatched the consignment by Express Roadlines by truck ,
Raised the Hundi for the invoiced amount

Multiple Choice Single Answer


Question This Question refers to the case of 'Universal Fasteners Ltd.' :
During the meeting with G.M (Mr. Kaul) Store Keeper Mr. Bapat
informed that purchases were made from :-
Correct Answer Several sources

Your Answer Several sources

Multiple Choice Single Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' :
One of the following is not a variable overhead:-
Correct Answer Space

Your Answer Space

True/False
Question This Question refers to 'Uday Electroplating Shop' : As per cost
figures collected, Expected volume of work on special equipment
next year is 10,000 Nos.
Correct Answer True

Your Answer True

Multiple Choice Single Answer


Question This Question refers to the case of Narmada Electricals Ltd.: In
the existing method, the scarp generated in processes like
machining was stored in :-
Correct Answer Scrap yard

Your Answer Scrap yard

Match The Following


Question Correct Answer Your Answer
Anonymous letter Need to justify Need to justify
received by M.D.
This question refers to the Seen in top hotels with No material facts to
case of 'Northern suppliers support the arguments
Machinery Ltd.' : Senior
buyers
Reason for failure to No material facts to No confidence in Material
convince the Board of support the arguments manager and Senior
Directors buyers
Lot of items on the Need to be concise and to Need to be concise and to
agenda the point the point

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Divgi Metalwares Private
Limited' : The new items contracted by the company are handled
by the development department for :-
Correct Answer Submission of samples , Manufacture of one or two production
lots , Transfer to manufacturing department for regular
production, after successful development
Your Answer Submission of samples , Manufacture of one or two production
lots , Transfer to manufacturing department for regular
production, after successful development

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Classic Engineering
Components Ltd.' : The company has well established machine
shop having more than 150 machines and :-
Correct Answer A heat treatment shop , Metrology section , Packing section

Your Answer A heat treatment shop , Metrology section , Packing section

Multiple Choice Single Answer


Question This Question refers to the case of 'The Gujrat Engineering
company Limited' : The company also executes :-
Correct Answer Rush orders

Your Answer Rush orders

Select The Blank


Question This Question refers to 'Uday Electroplating Shop' :The owner
finds it ________ to get part time employees when there is
heavy work load.
Correct Answer Difficult

Your Answer Difficult

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers' :Kalpak
Engineers have contracted from a boiler company manufacturing
of 500 nos of stay bolt. In the manufacturing process grinding
operation is carried out on following machine :-
Correct Answer Cylindrical grinder

Your Answer Cylindrical grinder

Multiple Choice Single Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' :
Process sheet for exhaust manifold provides following
information:-
Correct Answer Jigs and fixtures required

Your Answer Jigs and fixtures required

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Classic Engineering
Components Ltd.' : The company supplies components to :-
Correct Answer Automobile industries , Printing machines , Machine tool &
process equipment industries
Your Answer Automobile industries , Printing machines , Machine tool &
process equipment industries

True/False
Question This Question refers to the case of 'Classic Engineering
Components Ltd.' : Mr. Sen noticed that each worker was
provided with the drawing of the component.
Correct Answer False

Your Answer False

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Eagle Machine Company' :
Cost of running Sally's department is Rs 3,70,000 per year. This
is on account of :-
Correct Answer Salaries , Fringes , Expenses

Your Answer Salaries , Fringes , Expenses

Select The Blank


Question This Question refers to the case 'Quality Gauges Pvt. Ltd.' : After
the introduction of scheme, shop floor manager has complained
of pressure from workmen for ________.
Correct Answer Overtime

Your Answer Overtime


Match The Following
Question Correct Answer Your Answer

Test of viability of Production study Production study


standards
This question refers to Scanlon Plan Predetermined Method
case on 'Morbay Time standards
Engineering Works
(MEW)' : Guaranteed time
wage
Base wage rate Job Evaluation Work Measurement

Fixation of Performance Work Measurement Job Evaluation


standard

Select The Blank


Question This Question refers to the case of 'The Irate Vendor' : Jones
had been brought in by a management consultant to ________
the department's buying activities.
Correct Answer Centralize

Your Answer Centralize

Multiple Choice Single Answer


Question This Question refers to the case of 'Kerson Automobiles' : It was
decided to modify the existing layout of the plant in the year :-
Correct Answer 1972

Your Answer 1972

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Gujrat Engineering
company Limited' : The company has received a special order
where :-
Correct Answer A special cylinder is to be manufactured. , The item is to be
manufactured from a hollow bored forging , Fastest delivery is
requested
Your Answer A special cylinder is to be manufactured. , The item is to be
manufactured from a hollow bored forging , Fastest delivery is
requested

Select The Blank


Question This question refer to the case on "Allied Industries Pvt Ltd" :
One of the assumptions of the case is- other incidental costs
(e.g. paper work, Transport charges for acquiring and regrinding
thread roll) are ________.
Correct Answer Negligible
Your Answer Low

Select The Blank


Question This Question refers to the case of 'Artwood Products' : The
________ furniture is sold through distributors.
Correct Answer Standard

Your Answer Standard

Multiple Choice Single Answer


Question This Question refers to the case of 'Divgi Metalwares Private
Limited' : It is a :-
Correct Answer Light engineering company

Your Answer Light engineering company

True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : The
average efficiency on the other components currently being
produced is around 75%.
Correct Answer True

Your Answer True

Multiple Choice Multiple Answer


Question This Question refers to the case 'Suyog Udyog' : The process
involves the use of :-
Correct Answer HMT M-2V machine , HMT-2U machine , Investa Pillar drill

Your Answer HMT M-2V machine , HMT-2U machine , Investa Pillar drill

Select The Blank


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Jigs
and fixtures once provided will be able to maintain accuracy up
to about ________ pieces.
Correct Answer 20000

Your Answer 20000

True/False
Question This question refers to case on 'Morbay Engineering Works
(MEW)' : "It is difficult to install an incentive scheme and easy to
withdraw when desired."
Correct Answer False

Your Answer True


True/False
Question This Question refers to the case 'Suyog Udyog' : The operation
time for C' sunk 14 dia holes on both sides is 0.50 per piece.
Correct Answer True

Your Answer True

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Geer Company' :
Problems got created due to :-
Correct Answer Added work load in purchasing , Divided buying responsibilities ,
Number of inexperienced buyers
Your Answer Added work load in purchasing , Divided buying responsibilities ,
Number of inexperienced buyers

Multiple Choice Single Answer


Question This Question refers to the case 'Indus Foundries Ltd.': The
company is faced with following problems :-
Correct Answer Choice of Location

Your Answer Choice of Plant machinery

Multiple Choice Multiple Answer


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
Following is the information requirement for using CPM/PERT
techniques:-
Correct Answer List of activities , Activity duration , Precedent relationship of the
activities
Your Answer List of activities , Activity duration , Person responsible for
activity completion

Multiple Choice Single Answer


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : The success of an incentive plan to a large extent
depends on the following factor:-
Correct Answer Quality of performance standard

Your Answer Production Planning and Control system

Multiple Choice Multiple Answer


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : Following systems are prerequisites for an incentive
scheme:-
Correct Answer Good production planning and control system , Good Inspection
and quality control system , Sound system of accounting
operators daily output
Your Answer Good production planning and control system , Good Inspection
and quality control system , Sound system of accounting
operators daily output

Select The Blank


Question This Question refers to the case of 'K.T Gears' : The problem
envisages determining the rate of ________ before and after
improvement in the existing method.
Correct Answer Production

Your Answer Speed

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Geer Company' : The
problems reported are :-
Correct Answer Delays in placing orders , Frequently late deliveries , Incorrect
ordering quantities
Your Answer Delays in placing orders , Frequently late deliveries , Incorrect
ordering quantities

Multiple Choice Single Answer


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : Following practice if prevalent, must be eliminated to
guarantee success of wage incentive scheme :-
Correct Answer Overtime

Your Answer Encashment of leave

True/False
Question This Question refers to the case of 'Universal Fasteners Ltd.' :
The organization has reputation for poor deliveries.
Correct Answer False

Your Answer False

Multiple Choice Single Answer


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
Use of Network Techniques beside computing project duration
also helps in the following :-
Correct Answer Possibilities of reducing project duration

Your Answer Computing manpower requirement

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers' : This case
is concerned with following element of production planning:-
Correct Answer Routing

Your Answer Scheduling


Multiple Choice Single Answer
Question This Question refers to the case of 'Hansa Tractomotive Ltd.' :
The machines were completed by Kay Jee :-
Correct Answer Within the stipulated delivery period

Your Answer Within the stipulated delivery period

Select The Blank


Question This Question refers to the case of 'Kerson Automobiles' : The
pedestal grinder mounted on the huge work table, gives out
________ and blows out dust.
Correct Answer Sparks

Your Answer Sparks

Select The Blank


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : In
machining Exhaust Manifold, no cutting oil is required as the
material is ________.
Correct Answer Cast iron

Your Answer Plastic

Select The Blank


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : Success of wage incentive plans to a large extent
depends on the ________ of performance standards.
Correct Answer Quality

Your Answer Quality

True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : The
cost of foundry reject is borne by the company.
Correct Answer True

Your Answer True

True/ False
Question This question refers to the case of 'Northern Machinery Ltd' : As
per summary of purchases of the last year, Material cost as a
proportion of sales is 26%.
Correct Answer False

Your Answer True


True/False
Question This Question refers to the case 'Quality Gauges Pvt. Ltd.' : The
executives were entitled for incentive bonus.
Correct Answer True

Your Answer True

Select The Blank


Question This Question refers to the case 'Suyog Udyog' : Number of work
stations are to be decided based on assumption that monthly off
take is ________ numbers.
Correct Answer 8000

Your Answer 8000


LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Hansa Tractomotive Ltd.' :
After completion of manufacturing, Jay Jee took following actions
:-
Correct Answer Dispatched the consignment by Express Roadlines by truck ,
Raised the Hundi for the invoiced amount , Did not send the

al
consignment by Hansa's designated carrier
Your Answer Did not send the consignment by Hansa's designated carrier ,
Dispatched the consignment by Express Roadlines by truck ,

om ri
Raised the Hundi for the invoiced amount

T
Multiple Choice Single Answer
Question This Question refers to the case of 'Universal Fasteners Ltd.' :
During the meeting with G.M (Mr. Kaul) Store Keeper Mr. Bapat

r F
informed that purchases were made from :-
Correct Answer Several sourcesiza D
Your Answer Several sources

d.c
P
Multiple Choice Single Answer
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' :
One of the following is not a variable overhead:-
.p m

Correct Answer Space

Your Answer Space


dfw
o
cuC

True/False
Question This Question refers to 'Uday Electroplating Shop' : As per cost
figures collected, Expected volume of work on special equipment
next year is 10,000 Nos.
w

Correct Answer True


ww

Your Answer True


Do

Multiple Choice Single Answer


Question This Question refers to the case of Narmada Electricals Ltd.: In
the existing method, the scarp generated in processes like
machining was stored in :-
Correct Answer Scrap yard

Your Answer Scrap yard

Match The Following


Question Correct Answer Your Answer
Anonymous letter Need to justify Need to justify
received by M.D.
This question refers to the Seen in top hotels with No material facts to
case of 'Northern suppliers support the arguments
Machinery Ltd.' : Senior
buyers
Reason for failure to No material facts to No confidence in Material
convince the Board of support the arguments manager and Senior
Directors buyers

al
Lot of items on the Need to be concise and to Need to be concise and to
agenda the point the point

om ri
Multiple Choice Multiple Answer

T
Question This Question refers to the case of 'Divgi Metalwares Private
Limited' : The new items contracted by the company are handled
by the development department for :-
Correct Answer Submission of samples , Manufacture of one or two production

r F
lots , Transfer to manufacturing department for regular
production, after successful development
Your Answer
iza D
Submission of samples , Manufacture of one or two production
lots , Transfer to manufacturing department for regular
d.c
production, after successful development
P
Multiple Choice Multiple Answer
Question This Question refers to the case of 'Classic Engineering
.p m

Components Ltd.' : The company has well established machine


shop having more than 150 machines and :-
Correct Answer A heat treatment shop , Metrology section , Packing section
dfw
o

Your Answer A heat treatment shop , Metrology section , Packing section


cuC

Multiple Choice Single Answer


Question This Question refers to the case of 'The Gujrat Engineering
w

company Limited' : The company also executes :-


Correct Answer Rush orders
ww
Do

Your Answer Rush orders

Select The Blank


Question This Question refers to 'Uday Electroplating Shop' :The owner
finds it ________ to get part time employees when there is
heavy work load.
Correct Answer Difficult

Your Answer Difficult

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers' :Kalpak
Engineers have contracted from a boiler company manufacturing
of 500 nos of stay bolt. In the manufacturing process grinding
operation is carried out on following machine :-
Correct Answer Cylindrical grinder

Your Answer Cylindrical grinder

Multiple Choice Single Answer

al
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' :
Process sheet for exhaust manifold provides following
information:-

om ri
Correct Answer Jigs and fixtures required

T
Your Answer Jigs and fixtures required

r F
Multiple Choice Multiple Answer
Question This Question refers to the case of 'Classic Engineering
Components Ltd.' : The company supplies components to :-
iza D
Correct Answer Automobile industries , Printing machines , Machine tool &

Your Answer
process equipment industries
d.c
Automobile industries , Printing machines , Machine tool &
P
process equipment industries

True/False
.p m

Question This Question refers to the case of 'Classic Engineering


Components Ltd.' : Mr. Sen noticed that each worker was
provided with the drawing of the component.
dfw
o

Correct Answer False


cuC

Your Answer False

Multiple Choice Multiple Answer


w

Question This Question refers to the case of 'Eagle Machine Company' :


ww

Cost of running Sally's department is Rs 3,70,000 per year. This


is on account of :-
Do

Correct Answer Salaries , Fringes , Expenses

Your Answer Salaries , Fringes , Expenses

Select The Blank


Question This Question refers to the case 'Quality Gauges Pvt. Ltd.' : After
the introduction of scheme, shop floor manager has complained
of pressure from workmen for ________.
Correct Answer Overtime

Your Answer Overtime


Match The Following
Question Correct Answer Your Answer

Test of viability of Production study Production study


standards
This question refers to Scanlon Plan Predetermined Method
case on 'Morbay Time standards
Engineering Works
(MEW)' : Guaranteed time

al
wage
Base wage rate Job Evaluation Work Measurement

om ri
Fixation of Performance Work Measurement Job Evaluation
standard

T
Select The Blank
Question This Question refers to the case of 'The Irate Vendor' : Jones

r F
had been brought in by a management consultant to ________
the department's buying activities.
Correct Answer Centralize
iza D
Your Answer Centralize d.c
P
Multiple Choice Single Answer
.p m

Question This Question refers to the case of 'Kerson Automobiles' : It was


decided to modify the existing layout of the plant in the year :-
Correct Answer 1972
dfw
o

Your Answer 1972


cuC

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Gujrat Engineering
w

company Limited' : The company has received a special order


where :-
ww

Correct Answer A special cylinder is to be manufactured. , The item is to be


Do

manufactured from a hollow bored forging , Fastest delivery is


requested
Your Answer A special cylinder is to be manufactured. , The item is to be
manufactured from a hollow bored forging , Fastest delivery is
requested

Select The Blank


Question This question refer to the case on "Allied Industries Pvt Ltd" :
One of the assumptions of the case is- other incidental costs
(e.g. paper work, Transport charges for acquiring and regrinding
thread roll) are ________.
Correct Answer Negligible
Your Answer Low

Select The Blank


Question This Question refers to the case of 'Artwood Products' : The
________ furniture is sold through distributors.
Correct Answer Standard

Your Answer Standard

al
Multiple Choice Single Answer
Question This Question refers to the case of 'Divgi Metalwares Private

om ri
Limited' : It is a :-
Correct Answer Light engineering company

T
Your Answer Light engineering company

r F
True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : The
iza D
average efficiency on the other components currently being
produced is around 75%.
d.c
P
Correct Answer True

Your Answer True


.p m

Multiple Choice Multiple Answer


Question This Question refers to the case 'Suyog Udyog' : The process
dfw
o

involves the use of :-


Correct Answer HMT M-2V machine , HMT-2U machine , Investa Pillar drill
cuC

Your Answer HMT M-2V machine , HMT-2U machine , Investa Pillar drill
w

Select The Blank


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Jigs
ww

and fixtures once provided will be able to maintain accuracy up


Do

to about ________ pieces.


Correct Answer 20000

Your Answer 20000

True/False
Question This question refers to case on 'Morbay Engineering Works
(MEW)' : "It is difficult to install an incentive scheme and easy to
withdraw when desired."
Correct Answer False

Your Answer True


True/False
Question This Question refers to the case 'Suyog Udyog' : The operation
time for C' sunk 14 dia holes on both sides is 0.50 per piece.
Correct Answer True

Your Answer True

Multiple Choice Multiple Answer

al
Question This Question refers to the case of 'The Geer Company' :
Problems got created due to :-
Correct Answer Added work load in purchasing , Divided buying responsibilities ,

om ri
Number of inexperienced buyers
Your Answer Added work load in purchasing , Divided buying responsibilities ,

T
Number of inexperienced buyers

Multiple Choice Single Answer

r F
Question This Question refers to the case 'Indus Foundries Ltd.': The
company is faced with following problems :-
iza D
Correct Answer Choice of Location

Your Answer Choice of Plant machinery


d.c
P
Multiple Choice Multiple Answer
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
.p m

Following is the information requirement for using CPM/PERT


techniques:-
dfw

Correct Answer List of activities , Activity duration , Precedent relationship of the


o

activities
Your Answer List of activities , Activity duration , Person responsible for
cuC

activity completion

Multiple Choice Single Answer


w

Question This question refers to case on 'Morbay Engineering Works


(MEW)' : The success of an incentive plan to a large extent
ww

depends on the following factor:-


Do

Correct Answer Quality of performance standard

Your Answer Production Planning and Control system

Multiple Choice Multiple Answer


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : Following systems are prerequisites for an incentive
scheme:-
Correct Answer Good production planning and control system , Good Inspection
and quality control system , Sound system of accounting
operators daily output
Your Answer Good production planning and control system , Good Inspection
and quality control system , Sound system of accounting
operators daily output

Select The Blank


Question This Question refers to the case of 'K.T Gears' : The problem
envisages determining the rate of ________ before and after
improvement in the existing method.
Correct Answer Production

Your Answer Speed

al
Multiple Choice Multiple Answer

om ri
Question This Question refers to the case of 'The Geer Company' : The
problems reported are :-

T
Correct Answer Delays in placing orders , Frequently late deliveries , Incorrect
ordering quantities
Your Answer Delays in placing orders , Frequently late deliveries , Incorrect

r F
ordering quantities

Multiple Choice Single Answer


Question
iza D
This question refers to case on 'Morbay Engineering Works
d.c
(MEW)' : Following practice if prevalent, must be eliminated to
P
guarantee success of wage incentive scheme :-
Correct Answer Overtime

Your Answer Encashment of leave


.p m dfw

True/False
o

Question This Question refers to the case of 'Universal Fasteners Ltd.' :


The organization has reputation for poor deliveries.
cuC

Correct Answer False

Your Answer False


w
ww

Multiple Choice Single Answer


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
Do

Use of Network Techniques beside computing project duration


also helps in the following :-
Correct Answer Possibilities of reducing project duration

Your Answer Computing manpower requirement

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers' : This case
is concerned with following element of production planning:-
Correct Answer Routing

Your Answer Scheduling


Multiple Choice Single Answer
Question This Question refers to the case of 'Hansa Tractomotive Ltd.' :
The machines were completed by Kay Jee :-
Correct Answer Within the stipulated delivery period

Your Answer Within the stipulated delivery period

Select The Blank

al
Question This Question refers to the case of 'Kerson Automobiles' : The
pedestal grinder mounted on the huge work table, gives out
________ and blows out dust.

om ri
Correct Answer Sparks

T
Your Answer Sparks

r F
Select The Blank
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : In
machining Exhaust Manifold, no cutting oil is required as the
iza D
material is ________.
Correct Answer Cast iron
d.c
P
Your Answer Plastic
.p m

Select The Blank


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : Success of wage incentive plans to a large extent
dfw
o

depends on the ________ of performance standards.


Correct Answer Quality
cuC

Your Answer Quality


w

True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : The
ww

cost of foundry reject is borne by the company.


Do

Correct Answer True

Your Answer True

True/ False
Question This question refers to the case of 'Northern Machinery Ltd' : As
per summary of purchases of the last year, Material cost as a
proportion of sales is 26%.
Correct Answer False

Your Answer True


True/False
Question This Question refers to the case 'Quality Gauges Pvt. Ltd.' : The
executives were entitled for incentive bonus.
Correct Answer True

Your Answer True

Select The Blank


Question This Question refers to the case 'Suyog Udyog' : Number of work

al
stations are to be decided based on assumption that monthly off
take is ________ numbers.
Correct Answer 8000

om ri
Your Answer 8000

r F
T
iza D
d.c
.p m
P
dfw
o
cuC
w
ww
Do
CASES OF OPERATIONS MANAGEMENT

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Select The Blank


Question This Question refers to the case of 'Narmada Electricals Ltd.' : The disposal of
material was done on ________ basis.
Correct Answer Weight

Your Answer Weight

Select The Blank


Question This Question refers to the case of 'National Engineering Co.' : GM commented
that every department in this company competes with others in matter of
________.
Correct Answer Inefficiency

Your Answer Inefficiency

Select The Blank


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Delays in
execution of project leads to cost ________.
Correct Answer Overrun

Your Answer Overrun

True/False
Question This Question refers to the case of 'Artwood Products' : It is necessary to keep
stock of standard furniture to cater to sudden requirement of the customers.
Correct Answer True

Your Answer True

Multiple Choice Single Answer


Question This Question refers to 'Automotive Gears Private Limited' : The company, for its
various items, has recently introduced the concept of :-
Correct Answer Economic lot size

Your Answer Economic lot size

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Narmada Electricals Ltd.' : Other material
considered to be scrap/obsolete is :-
Correct Answer Packing material , Maintenance spares , Parts/components

Your Answer Packing material , Maintenance spares , Parts/components , Electric motors

True/False
Question This Question refers to the case of 'Kerson Automobiles' : MD has agreed to carry
out modification of existing plant.
Correct Answer True

Your Answer True

1
Multiple Choice Single Answer
Question This Question refers to the case of Narmada Electricals Ltd.: G.M. recruited a
senior purchase manager, Mr. Sajid Durrani in the purchased department :-
Correct Answer In view of need to procure parts/components for development in time

Your Answer In view of need to procure parts/components for development in time

Multiple Choice Single Answer


Question This question refers to case on 'Morbay Engineering Works (MEW)' : Following
was the solution conceived by the Production Manager to the need of increasing
production:-
Correct Answer Introduction of incentive scheme

Your Answer Introduction of incentive scheme

Select The Blank


Question This question refers to case on 'Morbay Engineering Works (MEW)' : Overtime
must be ________ to guarantee the success of the wage incentive scheme.
Correct Answer Eliminative

Your Answer Eliminative

Multiple Choice Multiple Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : If the Exhaust
Manifold is manufactured in house, following costs wll increase:-
Correct Answer Cost of power , Cost of labour , Cost of consumables like grease, lubricant

Your Answer Cost of power , Cost of labour , Cost of consumables like grease, lubricant , Fixed
overheads

Multiple Choice Single Answer


Question This Question refers to the case of 'The Geer Company' : The purchase of steel
was done exclusively by :-
Correct Answer One buyer

Your Answer One buyer

Multiple Choice Single Answer


Question This Question refers to the case of 'Kerson Automobiles' : Cars are manually
pushed over the wooden stand placed in the major repairs section because of :-
Correct Answer Absence of the underground pit

Your Answer Absence of the underground pit

True/False
Question This question refers to case on 'Morbay Engineering Works (MEW)' : Under
Scanlon Plan employee is paid incentive bonus based on individual efforts and
additional output.
Correct Answer True

Your Answer True

True/False
Question This Question refers to the case of 'The Geer Company' : During the period of
rapid expansion, it became necessary to subcontract a significant volume of

2
machining operations.

Correct Answer True

Your Answer True

Multiple Choice Single Answer


Question This Question refers to the case of 'K.T Gears' : The groove cutting operation is
performed at the :-
Correct Answer Capston lathe

Your Answer Capston lathe

Multiple Choice Single Answer


Question This question refer to the case on "Allied Industries Pvt Ltd" : Following cost
element is considered while calculating total cost of buying :-
Correct Answer Transport cost

Your Answer Transport cost

Multiple Choice Multiple Answer


Question This Question refers to the case 'Indus Foundries Ltd.' :Following items are readily
available at all the three locations :-
Correct Answer Raw materials , Scrap , Foundry chemicals

Your Answer Raw materials , Scrap , Foundry chemicals , Manpower

Match The Following


Question Correct Answer Your Answer

Capacity cost Unabsorbed overheads Unabsorbed overheads

This question refers to case on Variable over head Variable over head
'Uma Tools Pvt Ltd (UTPL)' :
Power cost
Setup cost Fixed labour cost Marginal cost

Material cost Direct cost Direct cost

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Northern Machinery Limited' : As per Materials
Manager basis of awarding contract is :-
Correct Answer Justified in each case , All Purchase orders above Rs. 10,000/- are counter signed
by him , All Purchase orders above Rs. 50,000/- are signed by V.P.
Your Answer Justified in each case , All Purchase orders above Rs. 10,000/- are counter signed
by him , All Purchase orders above Rs. 50,000/- are signed by V.P. , Case to case
basis

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Divgi Metalwares Private Limited' : As per the
Activity description given in the table, Preparation of operational layout activity
affects following activities :-
Correct Answer Design and draft hobbing fixture , Procure plug gauge , Procure ring gauge

Your Answer Design and draft hobbing fixture , Procure plug gauge , Procure ring gauge ,
Manufacture hobbing fixture

3
Multiple Choice Multiple Answer
Question This Question refers to the case of 'Kerson Automobiles' : As per the MD, the
company is faced with following problems :-
Correct Answer Union leaders do not work , Lower efficiency of the mechanics, as they do not
work at their place of work , Union leaders waste their time
Your Answer Union leaders do not work , Lower efficiency of the mechanics, as they do not
work at their place of work , Union leaders waste their time , Unsatisfactory layout

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers' :Kalpak Engineers have
contracted from a boiler company manufacturing of 500 nos of stay bolt. In the
manufacturing process grinding operation is carried out on following machine :-
Correct Answer Cylindrical grinder

Your Answer Cylindrical grinder

Select The Blank


Question This Question refers to the case of 'Artwood Products' : Entire shop floor was
________ due to piles of work in progress.
Correct Answer Congested

Your Answer Congested

Multiple Choice Single Answer


Question This Question refers to the case of 'Hansa Tractomotive Ltd.' : The machines were
completed by Kay Jee :-
Correct Answer Within the stipulated delivery period

Your Answer Within the stipulated delivery period

Select The Blank


Question This Question refers to the case of 'Kerson Automobiles' : The pedestal grinder
mounted on the huge work table, gives out ________ and blows out dust.
Correct Answer Sparks

Your Answer Sparks

Multiple Choice Single Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Process sheet for
exhaust manifold provides following information:-
Correct Answer Jigs and fixtures required

Your Answer Utilization of machine planned

Multiple Choice Single Answer


Question This question refers to case on Uma Tools Pvt Ltd (UTPL)' : Presently the raw
castings are procured by UTPL and given to machining to three vendors. If UTPL
has to manufacture Exhaust Manifold in house it would have to provide one of the
following:
Correct Answer New jigs and fixtures

Your Answer New jigs and fixtures

Match The Following

4
Question Correct Answer Your Answer

Mechanics going to clerk with Get the replacements Get the replacements
requisition authorization authorization
This Question refers to the case Obtaining replacement of Obtaining replacement of spares
of 'Kerson Automobiles' : Loss spares from stores from stores
of productive time
Transfer of parts from work Blowing off parts clean with Blowing off parts clean with
table to a hand trolley and compressed air compressed air
pushing it out to the service bay
Space for storage of seats Avoid wasteful movements Avoid wasteful movements
inside the workshop

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Irate Vendor' : The old supplier :-

Correct Answer Has been supplying for over 30 years , Does not understand why he has been cut
off , Does not understand why no chance has been given to him to discuss his bid
Your Answer Has been supplying for over 30 years , Does not understand why he has been cut
off , Does not understand why no chance has been given to him to discuss his bid
, Is always asked his opinion about quantity to be ordered

True/False
Question This Question refers to the case of 'K.T Gears' : The activities performed by the
operator are listed on the practitioner's data sheet.
Correct Answer True

Your Answer True

True/False
Question This Question refers to the case of 'Classic Engineering Components Ltd.' : Mr.
Sen noticed that each worker was provided with the drawing of the component.
Correct Answer False

Your Answer False

Select The Blank


Question This Question refers to the case of 'Northern Machinery Limited' : The V.P.
instructed Materials Manager to collect ________ information and evidence to
clarify that their system is foolproof.
Correct Answer Relevant

Your Answer Relevant

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Autogears Private Limited' : Work elements
performed by a gear shaving operator are :-
Correct Answer Load gear on mandrel and secure it with a nut , Raise bed to enable gear teeth to
mesh with cutter teeth , Unlock nut and remove gear from the mandrel
Your Answer Load gear on mandrel and secure it with a nut , Raise bed to enable gear teeth to
mesh with cutter teeth , Unlock nut and remove gear from the mandrel , Raise oil
guard and switch on the machine

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Artwood Products' : The cost of manufacturing
has increased due to :-

5
Correct Answer Blockage of funds in inventory , Longer manufacturing cycle time , Poor quality of
products
Your Answer Blockage of funds in inventory , Longer manufacturing cycle time , Poor quality of
products , Non availability of skilled labour

Select The Blank


Question This Question refers to the case of 'K.T Gears' : The cycle time per piece to
perform the set of activities listed adds up to ________.
Correct Answer 2.30 minutes

Your Answer 2.30 minutes

Select The Blank


Question This Question refers to the case of 'Universal Fasteners Ltd.' : Personnel Officer
Mr. Sinha informed Mr. Kaul that Employee ________ is very high.
Correct Answer Turnover

Your Answer Turnover

Multiple Choice Single Answer


Question This Question refers to the case of 'National Engineering Co.' : As per GM, the
route cause of this non-sensical situation is lack of :-
Correct Answer Co-ordination

Your Answer Co-ordination

Multiple Choice Single Answer


Question This Question refers to the case of 'The Geer Company' : The company had a
small foundry until 1946. This was subsequently closed and the purchase of
ferrous castings were handled by :-
Correct Answer A man who had been a supervisor in the foundry

Your Answer A man who had been a supervisor in the foundry

Multiple Choice Multiple Answer


Question This question refers to case on 'Morbay Engineering Works (MEW)' : An incentive
plan can be considered as a tool for following:-
Correct Answer Increase productivity , Create more capacity , Reduce manufacturing costs

Your Answer Increase productivity , Create more capacity , Reduce manufacturing costs ,
Increase sales

True/False
Question This question refers to 'Automotive Gears Private Limited' : The table given in the
case study gives approximate machine hour rate for each indicated machine.
Correct Answer True

Your Answer True

Select The Blank


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : To manufacture
exhaust Manifild in-house additional capacity is required. Extra capacity can be
generated at UTPL by additional ________.
Correct Answer Shift

Your Answer Shift

6
True/False
Question This Question refers to the case of 'Universal Fasteners Ltd.' : Mr. Sharma,
Production Engineer informed Mr. Kaul that Hardening & Tempering was the last
operation.
Correct Answer True

Your Answer True

Multiple Choice Multiple Answer


Question This Question refers to the case of 'K.T Gears' : The firm is :-

Correct Answer A proprietary firm , Engaged in manufacture of spur gears , Engaged in


manufacture of helical gear
Your Answer A proprietary firm , Engaged in manufacture of spur gears , Engaged in
manufacture of helical gear , Engaged in manufacture of cutting gears

Multiple Choice Multiple Answer


Question This question refer to the case on "Allied Industries Pvt Ltd" : Following are cost
elements of make indicator :-
Correct Answer Transport cost , Tooling cost , Indirect Employee cost

Your Answer Transport cost , Tooling cost , Indirect Employee cost , Power cost

True/False
Question This Question refers to the case of 'Classic Engineering Components Ltd.' : Mr.
Sen was informed by Mr. Ravikant, Materials Manager that counting is not
necessary at every stage as they count at the initial stage and since their workers
and supervisors are experienced, they can easily identify the components at each
stage of production.
Correct Answer True

Your Answer True

True/False
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Project duration
can always be reduced by deploying additional recourses.
Correct Answer False

Your Answer False

ND
2 COPY

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

True/False
Question This Question refers to the case of 'Divgi Metalwares Private Limited' :
The order has been finalized from a leading engineering firm.
Correct Answer False

Your Answer True

True/False
Question This Question refers to the case of 'Autogears Private Limited' : It takes
0.2 minutes to measure dimensions and set aside gear into the trolley.

7
Correct Answer True

Your Answer True

Multiple Choice Single Answer


Question This Question refers to the case of 'Eagle Machine Company' : The
President demands that in the remaining quarter the firm should :-
Correct Answer Break even

Your Answer Break even

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Narmada Electricals Ltd.' : Production
or Quality department decide when these become surplus/obsolete :-
Correct Answer Part , Component , Item

Your Answer Part , Component , Item , Material

Multiple Choice Multiple Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : While making
Make or Buy decisions, Buy indicator includes following costs :-
Correct Answer Raw material cost , Purchase cost , Fixed overhead cost

Your Answer Raw material cost , Variable overhead cost , Purchase cost , Fixed
overhead cost

Multiple Choice Multiple Answer


Question This question refer to the case on "Allied Industries Pvt Ltd" : Following
are cost elements of make indicator :-
Correct Answer Transport cost , Tooling cost , Indirect Employee cost

Your Answer Transport cost , Tooling cost , Indirect Employee cost , Power cost

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Gujrat Engineering company
Limited' : The forged cylinder ordered on new vendor :-
Correct Answer Was received on schedule , Was priced 15 % lower than the price of the
previous supplier , Had missed out carrying out some machining
operations

Your Answer Was received on schedule , Was priced 15 % lower than the price of the
previous supplier , Had missed out carrying out some machining
operations , Was of sub standard quality

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Divgi Metalwares Private Limited' :
The new items contracted by the company are handled by the
development department for :-
Correct Answer Submission of samples , Manufacture of one or two production lots ,
Transfer to manufacturing department for regular production, after
successful development
Your Answer Submission of samples , Manufacture of one or two production lots ,
Transfer to manufacturing department for regular production, after
successful development , Transfer to sales department for sales, after
successful development

Multiple Choice Multiple Answer

8
Question This Question refers to the case 'Indus Foundries Ltd.' :Following items
are readily available at all the three locations :-
Correct Answer Raw materials , Scrap , Foundry chemicals

Your Answer Manpower , Raw materials , Scrap , Foundry chemicals

Multiple Choice Multiple Answer


Question This Question refers to the case 'Indus Foundries Ltd.':The location of
plant has been narrowed down to following locations :-
Correct Answer Kolhapur , Ahmedabad , Coimbatore

Your Answer Kolhapur , Ahmedabad , Coimbatore , Nasik

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Universal Fasteners Ltd.' : Mr
Banerjee, Manager Quality informed Mr.Kaul that :-
Correct Answer Raw Material received was without test certificate and was not inspected
by the inspector , Laid down procedure for processes of heat treatment,
painting etc. are not followed due to heavy labour turnover and frequent
work allocation , Management has been requested to get the crack
detection machine repaired.
Your Answer Raw Material received was without test certificate and was not inspected
by the inspector , Laid down procedure for processes of heat treatment,
painting etc. are not followed due to heavy labour turnover and frequent
work allocation , Management has been requested to get the crack
detection machine repaired. , Broken studs were not hardened

Match The Following


Question Correct Answer Your Answer

Machine shop congested with Shortage of space Shortage of space


semi-processed material kept
in the bins and components
lying on the floors all around.
This Question refers to the Shared by operators Shared by operators
case of 'Classic Engineering
Components Ltd.' :
Measuring instruments like
vernier calipers, micrometers
or gauges
Unispected lots Processed Identifiable by tags and
markings
Responsibility of oiling Maintenance department Maintenance department
/greasing

Select The Blank


Question This Question refers to the case of 'Kerson Automobiles' : The pedestal
grinder mounted on the huge work table, gives out ________ and blows
out dust.
Correct Answer Sparks

Your Answer Sparks

Multiple Choice Single Answer


Question This Question refers to the case of 'Classic Engineering Components Ltd.'
: This company was acquired by Das Group of Industries. Mr. Mohit
Sen,(head of Business planning function in the corporate office) was

9
visiting the factory as its :-

Correct Answer Turn over was stagnating

Your Answer Turn over was stagnating

Multiple Choice Single Answer


Question This Question refers to the case of 'Divgi Metalwares Private Limited' :
The company is manned by :-
Correct Answer Professional managers

Your Answer Professional managers

Multiple Choice Multiple Answer


Question This question refers to case on 'Morbay Engineering Works (MEW)' :
Following systems are prerequisites for an incentive scheme:-
Correct Answer Good production planning and control system , Good Inspection and
quality control system , Sound system of accounting operators daily
output
Your Answer Good production planning and control system , Good Inspection and
quality control system , Sound system of accounting operators daily
output , Efficient wage payment system

Multiple Choice Multiple Answer


Question This Question refers to the case of 'K.T Gears' : The firm is :-

Correct Answer A proprietary firm , Engaged in manufacture of spur gears , Engaged in


manufacture of helical gear
Your Answer A proprietary firm , Engaged in manufacture of spur gears , Engaged in
manufacture of helical gear , Engaged in manufacture of cutting gears

Select The Blank


Question This Question refers to the case 'Suyog Udyog' : Number of work stations
are to be decided based on assumption that monthly off take is ________
numbers.
Correct Answer 8000

Your Answer 8000

Multiple Choice Single Answer


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : The basic
management problem of WIPL in context of the project is following :-
Correct Answer On which date the project will be completed

Your Answer On which date the project will be completed

Multiple Choice Multiple Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : If the Exhaust
Manifold is to be manufactured in house, following are the requirements:-
Correct Answer New jigs and fixtures , Additional shift , Additional manpower

Your Answer New jigs and fixtures , Additional shift , Additional manpower , Additional
machinery

Select The Blank


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Delays in
completion of ________ would increase Project cost.

10
Correct Answer Project

Your Answer Project

Multiple Choice Single Answer


Question This Question refers to the case of 'Kerson Automobiles' : Distance
traveled every day, by a mechanic to get replacement from stores is :-
Correct Answer 4 to 6 miles

Your Answer 4 to 6 miles

Select The Blank


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : To
manufacture exhaust Manifild in-house additional capacity is required.
Extra capacity can be generated at UTPL by additional ________.
Correct Answer Shift

Your Answer Shift

Multiple Choice Single Answer


Question This question refers to case on 'Morbay Engineering Works (MEW)':
Following is not the prerequisite for sound incentive scheme:-
Correct Answer Existence of union

Your Answer Reporting System for daily production of workers

Multiple Choice Multiple Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : If the Exhaust
Manifold is manufactured in house, following costs wll increase:-
Correct Answer Cost of power , Cost of labour , Cost of consumables like grease, lubricant

Your Answer Cost of power , Cost of labour , Cost of consumables like grease, lubricant
, Fixed overheads

Select The Blank


Question This Question refers to the case of 'The Geer Company' : The volume of
growth tripled due to ________ management.
Correct Answer Aggressive

Your Answer Aggressive

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Irate Vendor' : The President's
memorandum says :-
Correct Answer We have treated this supplier unfairly , He would like to see if his
complaint is justified , The Vendor's letter suggests that we do not have a
policy on evaluating our vendors
Your Answer We have treated this supplier unfairly , He would like to see if his
complaint is justified , The Vendor's letter suggests that we do not have a
policy on evaluating our vendors , The vendor always quotes high price of
finished goods

Select The Blank


Question This Question refers to the case of 'Divgi Metalwares Private Limited' :
The company has finalized the order for manufacture of a ________
driven gear.

11
Correct Answer Speedmeter

Your Answer Speedmeter

Select The Blank


Question This question refers to case on 'Morbay Engineering Works (MEW)' :
Success of wage incentive plans to a large extent depends on the
________ of performance standards.
Correct Answer Quality

Your Answer Quality

True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : The average
efficiency on the other components currently being produced is around
75%.
Correct Answer True

Your Answer True

True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : It is
economical to continue subcontracting the machining of Exhaust Manifold
to vendors.
Correct Answer False

Your Answer False

Select The Blank


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Delays in
execution of project leads to cost ________.
Correct Answer Overrun

Your Answer Overrun

Multiple Choice Single Answer


Question This Question refers to the case 'Quality Gauges Pvt. Ltd.' : With the
introduction of the scheme :-
Correct Answer The sales picked up

Your Answer The sales picked up

Select The Blank


Question This Question refers to the case of 'National Engineering Co.' : GM
commented that every department in this company competes with others
in matter of ________.
Correct Answer Inefficiency

Your Answer Productivity

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Irate Vendor' : The old supplier :-

Correct Answer Has been supplying for over 30 years , Does not understand why he has
been cut off , Does not understand why no chance has been given to him

12
to discuss his bid

Your Answer Has been supplying for over 30 years , Does not understand why he has
been cut off , Does not understand why no chance has been given to him
to discuss his bid , Is always asked his opinion about quantity to be
ordered

13
LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Multiple Choice Single Answer


Question This Question refers to the case of 'Universal Fasteners Ltd.' :
Mr. Bose, Purchase Engineer informed Mr. Kaul that previous lot
of 500 kg material was purchased from :-
Correct Answer A source who is not in the approved list

Your Answer A source who is not in the approved list

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Divgi Metalwares Private
Limited' : As per the Activity description given in the table,
Preparation of operational layout activity affects following
activities :-
Correct Answer Design and draft hobbing fixture , Procure plug gauge , Procure
ring gauge
Your Answer Procure plug gauge , Procure ring gauge , Design and draft
hobbing fixture

Select The Blank


Question This Question refers to the case of 'Artwood Products' : The
________ furniture is sold through distributors.
Correct Answer Standard

Your Answer Standard

Multiple Choice Single Answer


Question This question refers to 'Automotive Gears Private Limited' : It is :-

Correct Answer An O.E. Supplier

Your Answer An O.E. Supplier

Multiple Choice Single Answer


Question This Question refers to the case of 'Hansa Tractomotive Ltd.' :
The company contracted with Kay Jee Hydraulics Ltd. Bombay
for supply of :-
Correct Answer Filtering & Transfer machines

Your Answer Filtering & Transfer machines

Select The Blank


Question This question refer to the case on "Allied Industries Pvt Ltd" :
Allied Industries Pvt ltd is a small ________ concern with 25
workmen.
Correct Answer Proprietary

Your Answer Proprietary

Multiple Choice Single Answer


Question This Question refers to the case of 'Narmada Electricals
Ltd.(NEL)' : Mr. Ashok Rai, General Manager is concerned about
stock of surplus/obsolete material :-
Correct Answer Lyinig in stores

Your Answer Lyinig in stores

Multiple Choice Single Answer


Question This question refer to the case on "Allied Industries Pvt Ltd" :
Following cost element is considered while calculating total cost
of buying :-
Correct Answer Transport cost

Your Answer Transport cost

Select The Blank


Question This Question refers to the case of 'Hansa Tractomotive Ltd.' :
The loss of consignment was ________.
Correct Answer Total

Your Answer Total

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Universal Fasteners Ltd.' :
Mr Sharma, Production Engineer informed Mr. Kaul that :-
Correct Answer Material testing was done by a worker as Raw Material Inspector
was absent , Visual checking for cracks on sample basis was
carried out , Heat treatment operator is a new one .
Your Answer Material testing was done by a worker as Raw Material Inspector
was absent , Visual checking for cracks on sample basis was
carried out , Heat treatment operator is a new one .

Select The Blank


Question This Question refers to the case of 'Narmada Electricals Ltd.' :
NEL has plans for expanding its activities and shortage
________ was one of the major constraints for its plans.
Correct Answer Space

Your Answer Space

Select The Blank


Question This question refers to 'Automotive Gears Private Limited' : The
company produces items for ________ manufacturers.
Correct Answer Automobile

Your Answer Automobile

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Kerson Automobiles' : As per
consultants, problems are due to following reasons :-
Correct Answer Material flow (Cars) is not smooth , A major chunk of productive
time is lost in obtaining replacement of spares from stores. , Too
often, helpers are found busy in transferring parts from work
table to a hand trolley.
Your Answer Material flow (Cars) is not smooth , A major chunk of productive
time is lost in obtaining replacement of spares from stores. , Too
often, helpers are found busy in transferring parts from work
table to a hand trolley.

Multiple Choice Single Answer


Question This Question refers to the case of 'Kerson Automobiles' : Cars
are manually pushed over the wooden stand placed in the major
repairs section because of :-
Correct Answer Absence of the underground pit

Your Answer Absence of the underground pit

True/False
Question This Question refers to the case of 'Kerson Automobiles' : The
decision to utilize gnagway space as "Service Bays" is good.
Correct Answer False

Your Answer False

True/ False
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
Project duration can always be reduced by deploying additional
recourses.
Correct Answer False

Your Answer False

Multiple Choice Single Answer


Question This Question refers to the case of 'Eagle Machine Company' :
The company is facing following problem :-
Correct Answer Sales are declining

Your Answer Sales are declining

Select The Blank


Question This Question refers to the case of 'K.T Gears' : The cycle time
per piece to perform the set of activities listed adds up to
________.
Correct Answer 2.30 minutes

Your Answer 2.30 minutes

True/False
Question This Question refers to the case of 'Kerson Automobiles' : MD
has agreed to carry out modification of existing plant.
Correct Answer True

Your Answer True

True/False
Question This Question refers to the case of 'Kerson Automobiles' : Some
areas can not be used because of odour emanating from
adjoining two painting bays.
Correct Answer True

Your Answer True

Match The Following


Question Correct Answer Your Answer

Activity in CPM Arrow Arrow

This question refers to Project duration Project duration


case on 'Weldtech India
Pvt Ltd (WIPL)' : Critical
Path
CPM/PERT Project planning/ Project planning/
scheduling technique scheduling technique
Cost overrun Delays in project Delays in project

Select The Blank


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : Incentive scheme should not be regarded as a
substitute for ________ wage structure.
Correct Answer Poor

Your Answer Poor

Multiple Choice Single Answer


Question This Question refers to the case of 'Eagle Machine Company' :
The President demands that in the remaining quarter the firm
should :-

Correct Answer Break even

Your Answer Break even

Multiple Choice Single Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' :
Power consumption cost is considered as :-
Correct Answer Variable overhead cost

Your Answer Variable overhead cost

Multiple Choice Single Answer


Question This Question refers to the case 'Suyog Udyog' : Balancing
weights are manufactured using facilities arranged in :-
Correct Answer Process type of layout

Your Answer Process type of layout

Multiple Choice Multiple Answer


Question This Question refers to the case 'Suyog Udyog' : Operation
details are as follows :-
Correct Answer Drill and ream 3 holes, 14 mm dia , Deburr , Mill 2 slots 28 mm
wide
Your Answer Drill and ream 3 holes, 14 mm dia , Deburr , Mill 2 slots 28 mm
wide

Multiple Choice Multiple Answer


Question This Question refers to the case of National Engineering Co.

Correct Answer Despatched the consignment by Express Roadlines by truck ,


Raised the Hundi for the invoiced amount , Did not send the
consignment by Hansa's designated carrier
Your Answer Despatched the consignment by Express Roadlines by truck ,
Raised the Hundi for the invoiced amount , Did not send the
consignment by Hansa's designated carrier

True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' :
Cost of reject above 5% machining rejection is borne by the
vendor.
Correct Answer True

Your Answer True

True/False
Question This Question refers to the case of 'Eagle Machine Company' :
The company buys a variety of material, ranging from a few
ponds of rare metals to sizable quantities of sheet metal.

Correct Answer True

Your Answer True

True/False
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
In order to save time in construction, ready factory building was
purchased.
Correct Answer True

Your Answer True

Select The Blank


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : Incentive scheme is a tool to create ________
capacity, increase productivity and reduce manufacturing costs.
Correct Answer More

Your Answer More

Match The Following


Question Correct Answer Your Answer

Inspection Dimensional accuracy Dimensional accuracy

The question refer to the Saw off Saw off


case on 'Kalpak
Engineers' : First
operation
Consecutive operations Copy turning machine Copy turning machine

Last machining operation Thread rolling Thread rolling

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Kerson Automobiles' : The
huge work table placed outside the machine shop can be used
to carry out :-
Correct Answer Filing work , Debarring work , Cleaning work

Your Answer Filing work , Debarring work , Cleaning work

True/False
Question This question refer to the case on "Allied Industries Pvt Ltd"
:Capital recovery per annum is an element of fixed cost.
Correct Answer True

Your Answer True

Multiple Choice Multiple Answer


Question This Question refers to the case of 'K.T Gears' : The groove
cutting operation is performed by :-
Correct Answer Holding the gear blank on a mandrel in face plate , Cutting the
groove by two tools , One tool is held in rear side and other held
in front side
Your Answer Holding the gear blank on a mandrel in face plate , Cutting the
groove by two tools , One tool is held in rear side and other held
in front side

Multiple Choice Multiple Answer


Question The question refer to the case on 'Kalpak Engineers' : Following
are the operations involved in manufacturing stay bolt in the
case:-
Correct Answer Copy turning , Thread Rolling , Drilling

Your Answer Copy turning , Thread Rolling , Drilling

Select The Blank


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
In order to save time in construction the management purchased
a ________.
Correct Answer Factory-building

Your Answer Factory-building

True/False
Question This Question refers to the case of 'Classic Engineering
Components Ltd.' : Mr. Sen noticed that each worker was
provided with the drawing of the component.
Correct Answer False

Your Answer False

Select The Blank


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : Many incentives schemes fail in their ________ due to
'loose standards'.
Correct Answer Objectives

Your Answer Objectives

Multiple Choice Single Answer


Question This Question refers to the case 'Suyog Udyog' :The
management wants to switch over to :-
Correct Answer Line production

Your Answer Line production

Multiple Choice Single Answer


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
Use of Network Techniques beside computing project duration
also helps in the following :-
Correct Answer Possibilities of reducing project duration

Your Answer Possibilities of reducing project duration

Multiple Choice Multiple Answer


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : Following are some of the shortcomings of scanlon
plan:-
Correct Answer It rewards workers even if increase in sales is due to factor like
price increase , The plan does not recognize individual efforts ,
The increase in labour cost due to wage agreement may result in
lesser incentive bonus to the workmen
Your Answer It rewards workers even if increase in sales is due to factor like
price increase , The plan does not recognize individual efforts ,
The increase in labour cost due to wage agreement may result in
lesser incentive bonus to the workmen

Multiple Choice Multiple Answer


Question This question refers to 'Automotive Gears Private Limited' : The
spline Grinding machine is used for operation :-
Correct Answer Spline Grind (section'AA') , Spline Grind (section'BB') , Spline
Grind (section'CC')
Your Answer Spline Grind (section'AA') , Spline Grind (section'BB') , Spline
Grind (section'CC')

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Narmada Electricals Ltd.' :
Production or Quality department decide when these become
surplus/obsolete :-
Correct Answer Part , Component , Item

Your Answer Part , Component , Item

Select The Blank


Question This Question refers to the case of 'Divgi Metalwares Private
Limited' : The company has finalized the order for manufacture
of a ________ driven gear.
Correct Answer Speedmeter
Your Answer Speedmeter

True/False
Question This Question refers to the case of 'Classic Engineering
Components Ltd.' : Mr. Sen was informed by Mr. Ravikant,
Materials Manager that counting is not necessary at every stage
as they count at the initial stage and since their workers and
supervisors are experienced, they can easily identify the
components at each stage of production.
Correct Answer True

Your Answer True

Multiple Choice Multiple Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : For
calculating fixed labour cost following data is required:-
Correct Answer Set up time for operation , Labour hour rate , No of production
runs per year
Your Answer Set up time for operation , Labour hour rate , No of production
runs per year
LIST OF ATTEMPTED QUESTIONS AND ANSWERS

True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : The
average efficiency on the other components currently being
produced is around 75%.
Correct Answer True

Your Answer True

True/False
Question This Question refers to the case of 'Divgi Metalwares Private
Limited' : The order has been finalized from a leading
engineering firm.
Correct Answer False

Your Answer False

True/False
Question This question refers to the case of 'Northern Machinery Ltd' : As
per summary of purchases of the last year, Material cost as a
proportion of sales is 26%.
Correct Answer False

Your Answer False

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Hansa Tractomotive Ltd.' :
After completion of manufacturing, Jay Jee took following actions
:-
Correct Answer Dispatched the consignment by Express Roadlines by truck ,
Raised the Hundi for the invoiced amount , Did not send the
consignment by Hansa's designated carrier
Your Answer Dispatched the consignment by Express Roadlines by truck ,
Raised the Hundi for the invoiced amount , Did not send the
consignment by Hansa's designated carrier

True/False
Question This Question refers to the case of 'Artwood Products' : It is
necessary to keep stock of standard furniture to cater to sudden
requirement of the customers.
Correct Answer True

Your Answer True

Select The Blank


Question This Question refers to the case of 'Narmada Electricals Ltd.' :
The disposal of material was done on ________ basis.
Correct Answer Weight

Your Answer Weight

Select The Blank


Question This Question refers to the case 'Quality Gauges Pvt. Ltd.' : After
the introduction of scheme, shop floor manager has complained
of pressure from workmen for ________.
Correct Answer Overtime

Your Answer Overtime

Select The Blank


Question This Question refers to the case of 'K.T Gears' : The problem
envisages determining the rate of ________ before and after
improvement in the existing method.
Correct Answer Production

Your Answer Production

Select The Blank


Question This Question refers to the case of 'Universal Fasteners Ltd.' : In
the tempering process of studs, the ________ was reduced to
25-28 HRC.
Correct Answer Hardness

Your Answer Hardness

True/False
Question This question refers to 'Automotive Gears Private Limited' : The
table given in the case study gives approximate machine hour
rate for each indicated machine.
Correct Answer True

Your Answer True

Multiple Choice Single Answer


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
Though the company has acquired a ready factory building,
following task is yet to be completed:-
Correct Answer Modification/finishing work in the building

Your Answer Modification/finishing work in the building

Select The Blank


Question This Question refers to the case of 'Kerson Automobiles' : The
pedestal grinder mounted on the huge work table, gives out
________ and blows out dust.

Correct Answer Sparks

Your Answer Sparks

Multiple Choice Single Answer


Question This Question refers to the case of 'Northern Machinery Limited'
: The V.P. asked Material Manager to prepare short report to be
presented to board of directors about :-
Correct Answer Buying policies

Your Answer Buying policies

Multiple Choice Single Answer


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : The success of an incentive plan to a large extent
depends on the following factor:-
Correct Answer Quality of performance standard

Your Answer Quality of performance standard

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Hansa Tractomotive Ltd.':
The contract with Kay Jee Hydraulics Ltd was agreed with
following terms & conditions :-
Correct Answer Price per unit FOR Bombay , Delivery 10-12 weeks after receipt
of buyer's confirmed order , Payment 60 days after dispatch of
material
Your Answer Price per unit FOR Bombay , Delivery 10-12 weeks after receipt
of buyer's confirmed order , Payment 60 days after dispatch of
material

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers' : This case
is concerned with following element of production planning:-
Correct Answer Routing

Your Answer Routing

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Geer Company' :
Problems got created due to :-
Correct Answer Added work load in purchasing , Divided buying responsibilities ,
Number of inexperienced buyers
Your Answer Added work load in purchasing , Divided buying responsibilities ,
Number of inexperienced buyers

Select The Blank


Question This Question refers to the case of 'The Gujrat Engineering
company Limited' : The ________ supplier invoiced this
company for a cancellation charge.
Correct Answer Original

Your Answer Original

Multiple Choice Single Answer


Question This Question refers to the case of 'Northern Machinery Limited'
: Vice President ( Commercials) called the Materials Manager
Mr. Khan and informed him that an anonymous letter was
received which mentioned :-
Correct Answer Corruption in purchase department

Your Answer Corruption in purchase department

Multiple Choice Multiple Answer


Question This question refer to the case on "Allied Industries Pvt Ltd" :
Following are cost elements of make indicator :-
Correct Answer Transport cost , Tooling cost , Indirect Employee cost

Your Answer Tooling cost , Indirect Employee cost , Transport cost

Multiple Choice Multiple Answer


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : Following systems are prerequisites for an incentive
scheme:-
Correct Answer Good production planning and control system , Good Inspection
and quality control system , Sound system of accounting
operators daily output
Your Answer Good production planning and control system , Good Inspection
and quality control system , Sound system of accounting
operators daily output

Multiple Choice Single Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' :
Process sheet for exhaust manifold provides following
information:-
Correct Answer Jigs and fixtures required

Your Answer Jigs and fixtures required

True/False
Question This Question refers to the case of 'Narmada Electricals Ltd.'
:The rates of scrap were reviewed from time to time.
Correct Answer False

Your Answer False


True/False
Question The question refer to the case on 'Kalpak Engineers' : Set up
time for the machines is not more than an hour in the case.
Correct Answer True

Your Answer True

Select The Blank


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : In Scanlon Plan all employees receive guaranteed
________ wages.
Correct Answer Time

Your Answer Time

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Universal Fasteners Ltd.' :
Mr Banerjee, Manager Quality informed Mr.Kaul that :-
Correct Answer Raw Material received was without test certificate and was not
inspected by the inspector , Laid down procedure for processes
of heat treatment, painting etc. are not followed due to heavy
labour turnover and frequent work allocation , Management has
been requested to get the crack detection machine repaired.
Your Answer Raw Material received was without test certificate and was not
inspected by the inspector , Laid down procedure for processes
of heat treatment, painting etc. are not followed due to heavy
labour turnover and frequent work allocation , Management has
been requested to get the crack detection machine repaired.

True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : As
extra capacity can be generated by starting an additional shift,
hence fixed overheads are sizable.
Correct Answer False

Your Answer False

Multiple Choice Single Answer


Question This Question refers to the case of 'Universal Fasteners Ltd.' :
During meeting with Director(Operations) of GVL, it was
informed that in the event of any non-conformity during
guarantee :-
Correct Answer GVL has to pay heavy penalty for studs

Your Answer GVL has to pay heavy penalty for studs

Select The Blank


Question This Question refers to the case of 'Hansa Tractomotive Ltd.' :
Enroute to Delhi, the truck collided with an incoming ________.
Correct Answer Tractor Trailer

Your Answer Tractor Trailer

True/False
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
The management knew the activities involved, their durations
and interrelationship, still are not in position to tell when the
project will be completed.
Correct Answer True

Your Answer True

Multiple Choice Single Answer


Question This Question refers to the case of 'The Irate Vendor' : The
supplier's bid was not accepted because :-
Correct Answer It was not the lowest

Your Answer It was not the lowest

Select The Blank


Question This question refers to 'Automotive Gears Private Limited' : The
case study requires calculation of set up ________ for the job.
Correct Answer Cost

Your Answer Cost

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Artwood Products' : The cost
of manufacturing has increased due to :-
Correct Answer Poor quality of products , Blockage of funds in inventory , Longer
manufacturing cycle time
Your Answer Blockage of funds in inventory , Longer manufacturing cycle time
, Poor quality of products

Select The Blank


Question This Question refers to the case of 'National Engineering Co.' :
GM commented that every department in this company
competes with others in matter of ________.
Correct Answer Inefficiency

Your Answer Inefficiency

Multiple Choice Single Answer


Question This question refer to the case on "Allied Industries Pvt Ltd" :
Following cost element is not considered while calculating total
cost of thread rolling in-house :-

Correct Answer Transport cost

Your Answer Transport cost

Multiple Choice Single Answer


Question This Question refers to the case of 'Artwood Products' : As per
study conducted by Mr. Tahil, it was observed that Artwood's
profitability has :-
Correct Answer Eroded

Your Answer Eroded

Multiple Choice Single Answer


Question This Question refers to 'Uday Electroplating Shop' : It is a job
order :-
Correct Answer Production unit

Your Answer Production unit

Match The Following


Question Correct Answer Your Answer

Equipment cost Capital recovery factor Capital recovery factor

This question refer to the Power cost Power cost


case on "Allied Industries
Pvt Ltd." : Variable cost
Fixed cost Space cost Space cost

Item Sealing pump Sealing pump

True/False
Question This Question refers to the case of 'K.T Gears' : The activities
performed by the operator are listed on the practitioner's data
sheet.
Correct Answer True

Your Answer True

Multiple Choice Multiple Answer


Question The question refer to the case on 'Kalpak Engineers' : For
manufacturing Stay Bolt following machines are planned:-
Correct Answer Copying Lathe , Radial Drilling Machine , Thread Rolling
machine
Your Answer Copying Lathe , Radial Drilling Machine , Thread Rolling
machine

Select The Blank


Question This Question refers to the case of 'The Irate Vendor' : As per
Jones, the new ________ procedures were sound.
Correct Answer Purchasing

Your Answer Purchasing

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Classic Engineering
Components Ltd.' : The company has well established machine
shop having more than 150 machines and :-
Correct Answer A heat treatment shop , Metrology section , Packing section

Your Answer A heat treatment shop , Metrology section , Packing section

Multiple Choice Single Answer


Question This question refers to case on 'Morbay Engineering Works
(MEW)': Following is not the prerequisite for sound incentive
scheme:-
Correct Answer Existence of union

Your Answer Existence of union

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Gujrat Engineering
company Limited' : The company has received a special order
where :-
Correct Answer A special cylinder is to be manufactured. , The item is to be
manufactured from a hollow bored forging , Fastest delivery is
requested
Your Answer A special cylinder is to be manufactured. , The item is to be
manufactured from a hollow bored forging , Fastest delivery is
requested

Multiple Choice Multiple Answer


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
Following is the information requirement for using CPM/PERT
techniques:-
Correct Answer List of activities , Activity duration , Precedent relationship of the
activities
Your Answer List of activities , Activity duration , Precedent relationship of the
activities

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Gujrat Engineering
company Limited' : The forged cylinder ordered on new vendor :-
Correct Answer Was received on schedule , Was priced 15 % lower than the
price of the previous supplier , Had missed out carrying out
some machining operations
Your Answer Was received on schedule , Was priced 15 % lower than the
price of the previous supplier , Had missed out carrying out
some machining operations

Match The Following


Question Correct Answer Your Answer

Raw material is received Without test certificate Without test certificate

This Question refers to the 100 % inspection for 100 % inspection for
case of 'Universal hardness and cracks hardness and cracks
Fasteners Ltd.' : Dispatch
of studs, ready at works
Acceptance of raw In view of urgency of In view of urgency of
materials as a special delivery delivery
case
Material from different Due to paucity of space Due to paucity of space
sources gets mixed up at
stores
Cases in Operation Management

Semester 4

PGDBA (Operations)

Page 1
Question-: 1

The “Quality Auto Works” is a manufacturer of auto parts. All the auto parts being
manufactured in the industry are required to be phosphated for surface protection.
Presently other small units are done this phosphated work.
Quality Auto Work is now thinking of installing its own phosphating plant and is
interested about knowing about following.
(A) Should the install new plant or continue the present practice of subcontracting?

For finding out whether the firm should do the phosphating work by own or it should
contract other for the some one, we have to compare both the cost which are as follows.

Annual Cost of subcontracting

Cost of purchase =6.25x12000x12 =9, 00,000/-


Cost of Transportation =1800x12=21600/-
Total Cost =9, 21,600

Annual cost for installing own phosphating plant:

Installation cost of plant: 2, 80,000x0.2452= 68,656/-


Labor cost : 8000x12 = 96,000/-
Benefit to labor : 96000x40/100 = 38,400/-
Power : 12,000x0.23x12 = 33,120/-
Raw material : 12000x0.45x12 = 64,800/-
Total cost of installing = 3, 00,976/-

According to above calculation installing its own plant will benefit form.

(B) If the phosphating work expected to go up around 30,000Kg, what should the
company do?

In this case also both type of cost are to be compared, which are as follows:

Cost of purchase: 6.25x30, 000x12 =2,250,000/-


Cost of transportation: 18000x12 =21,600/-

Annual cost of installing own plant

Installation cost of plant: 2, 80,000x0.2452= 68,656/-


Labor cost : 8000x12 = 96,000/-
Benefit to labor : 96000x40/100 = 38,400/-
Power : 30,000x0.23x12 = 82,800/-
Raw material : 30,000x0.45x12 = 1, 62,000/-
Total cost of installing = 4, 47,856/-

Page 2
According to above calculation the firm should install its own phosphating plant; it
will be beneficiary for it.
Question-2

Nitneel Industries P Ltd is a firm dealing in different types of operations the firm in
interested in knowing about the following.

A) Estimate the requirement of power hacksaw sand manpower for the above
mentioned production target. If presently company has four power hacksaws,
establish additional requirement.

For finding out the requirement of power hacksaws and manpower according to
mentioned production target we have to make some calculation, which is based on the
following assumption.

a) The labor efficiency against output standards is @80%.


b) The plant utilization against output standard is @75%
c) Hour available per month is 200 hrs(25x8hrs)

Part Name/Part No Std Avg. Usage Running Capacity No of No of


time Quant/month hr in hrs 80% hrs 75% Fitter hacksaw
per month reqd Reqd
piece
1 Agro Control Shaft 8.46 1250 176.25 220.3 293.7 1.46 1.1
(50.16252.0)
2 Serration Shaft 8.46 1250 176.25 220.3 293.7 1.46 1.1
(0.16288.0)
3 Oil Pump Gear 5.4 4000 360 450 600 3 2.25
(2523.1810.5401/5402)
4 Helical Oil Pump 4.8 2000 160 200 266.6 1.33 1
Gear(312.181.0308.51)
5 Break 5.4 1000 90 112.6 150 0.75 0.56
shaft(2573.4230.7904)
6 Hub(640393) 9.6 2500 400 500 666.6 3.33 2.5
7 Hex nuts(50.52 17.16 250 71.5 89.3 119 0.59 0.44
5001/A
8 Thread Rolls 96 30 48 60 80 0.4 0.3
12.32 9.25
(12) (9)
Total Requirement

As 4 power hacksaws are available therefore total fitter & hacksaws will be 12& 5

Page 3
B) The company has received an order for a new item to be produced from bar
stock in lots of 2000 nos per month. The standard time required to source of
each part of this item is estimated to be 12 minutes. What will be total
requirement of machines and manpower use? Should the company accept the
order or regret the same considering six power hacksaws being available.

Assumptions remaining the same our purpose can be solved with the help of following
calculation.

Required no of item per month = 2000


Minutes required for one item = 12 min

Hrs required = 2000x12/60


= 400hrs

Hours required for machining = 400/80x100


= 500 hrs

Hours required by the labor = 500/75x100


= 667 hrs

No of machines required = 500/200


= 2.5
= 3 appx

no of Labor required = 667/200


= 3.33
= 3appx.

As company is having six hacksaws and only three of them are required, the order
should be accepted.

Page 4
Question -3

Summary

Sidharth Chemicals Ltd is an organic chemical plant, in its one of the scheduled
activities of the corrective maintenance, the activity is performed 4 times per year and
the average down time per occasion and other information are been provided, with the
help of it following information are required

A) Draw an arrow diagram.

Page 5
B) Establish the appropriate method of performing the activities involved.

Most popular techniques available in the market for such types of situations are PERT
(Problem evolution review technique) and CPM (Cortical path method) both the
techniques were developed by two different companies and has their own importance.
PERT is a probable model based on the concept that time estimate for use three-time
estimate (pessimistic, optimistic and most likely) and based on these three estimate they
calculate the expected time. This model is most suitable for research & development
project which are non recurring in nature on the other hand CPM is deterministic in
nature this model assume time estimate for the activity is accurate so they estimate the
time every activity on single time basis This model is most suitable for construction
projects and those which are recurring in nature.

As per my view the most appropriate methods is CPM, because the


Siddhartha Chemical Ltd. Followed one time estimate and it is clearly mentioned that
all the activities are performed four times in a year so it is clear that all the activities are
recurring in nature. In the case pf project, which is recurring in nature The CPM
methods, is best, hence it is suggested the CPM methods is most appropriate.

C) Determine the time required to complete the task.

The different paths to perform the above corrective maintenance activity are as
follows:

 A→ B→ J→ K = 190 mins.
 C→ E→ F→ G→ H→ K = 180 mins.
 C→ E→ F→ G→ J→ K = 150 mins

Thus critical path →

C→ E→ F→ G→ H→ K = 180 mins

Time required to complete the task is 180 mins.

Page 6
Question. 5

Summary:
Mr. Roy the purchase manager of m/s Surgical Instruments Company has narrated
description of expedited purchases with which he was involved. He declared that his
expediting organization consisted of six expediters assigned individually to specific
purchase assistants to operate as a team. The purchase assistants are also required to
perform assignments desired by superiors.

The company placed an order for electric power control system. The system
was to be designed, developed and sold to the company by the vendor. Sample were
submitted and approved by the engineering department and order was placed for one
thousand units, the units were received at a reasonable rate considering start up by a
new company. Quality problems that emerged were resolved with a minimum
production breakdown.

Another order was placed also for accelerated delivery as experience with
the first unit proved a satisfactory sale. The consignment of the unit received against
the second order was found to be 50 % defective because of an electronic
component, on further enquiry it was found that an attempt was made by the
supplies to cut of the cost.

After discussion vendor required around 30-32 days to reproduce whereas


engineering division stated it would take 45 days of reliably testing. The
management insisted on having the products ready for delivery before the end of the
three months but would not be authorize the use of substitute units. Thus the
following questions is been asked.

How would you proceed to get the delivery of accepted units in time to meet sales
and profit objectives?

As the company is newly formed a proper concentration is required to be given on


quality of the product to be sold as well as the time on which requirement of the
buyers to be fulfilled because one of these activities affects the position or fame of
the organization in the market.

In the case stated above while keeping both of the things that are quality and time
new venders are to be contracted which can fulfill the requirements of the company
as well as can supply the goods in the stipulated time period.

Another step which can be taken is the appointment of quality control inspector
which can be employed with the help of vender in the vender’s premises which can
stop the deficit items over their on time so extra time should not be wasted.

Page 7
Question.8

Summary
Tom Jones is a recently hired purchasing director at a medium-sized purchasing firm.
He is responsible form making changes in the buying policies of the firm from direct
purchase on bid system, due to which the president of the company has received a letter
of complaint from the supplier of the company who is involved in selling to the firm
from last thirty years as well as is helping the companies people in making many types
decisions, but he was rejected to sale its product to the company because his bid was
$40 over the lowest quotation filed.

The President after going through the complaint of the seller is thinking that they have
treated the seller unfairly and he could be giving order for coming months requirement.
The purchasing director is also being asked to submit its views on what has to be done`.
Following things are being asked relating to the memorandum and response to the
vendor:

1) What should Jones memorandum to the president contain?

The memorandum of the purchasing director to the president should be furnished as


follows.

Inter office memo

Date- DD: MM: YYYY

To
The President

Subject-; Justification for supplier’s complaint for new bidding system/ steps to be
taken on supplier complaint.

We have changed our purchasing system from old purchasing system to new bidding
system and as per the new bidding system rules the company has to give contract to the
supplier who submits lowest possible bid. This method of purchasing is quite good as it
minimize the effect of personal relation with supplier and also minimizes the chance of
bribery action. This also help company in getting competitive priced product from the
market it will be against the rule if we select the same supplier even if he has not
submitted the lowest bid, so on official ground it is not wise extend the contract with
this supplier as he has to failed to submit the lowest bid, but on the basis of very long
term relation as he has spend thirty years with the company we can think about it as
exceptional case.

The post history of supplier make it clear that his performance is quite good in term of
quality, time as well as competitive price even he suggest the purchase people of the
company time to time. Such type of supplier are really an asset of the company so we
cannot afford to loose such type of asset as they can help the company to run on

Page 8
profitable track, so as an exceptional case we accept the contract to this particular
supplier

Tom Jones

(Director Purchase)

(2) Who should answer the vendor’s letter and what should the answer say?

The letter to the vendor should be written by the purchase director and should contain
the following.

To-: The vendor/seller (M/s xy Ltd.)

This is to bring to your notice that our president has gone through your case and your
past history with our organization, so there we hereby are placing an order for our next
month’s requirement i.e 10, 000 unit of the product. Please be ensure to fulfill our
requirement as were done by you in past, the contract will be revised on monthly basis
in coming months

Tom Jones.

Page 9
LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Match The Following


Question Correct Answer Your Answer

Activity in CPM Arrow Shortest path

This question refers to Project duration Project duration


case on 'Weldtech India
Pvt Ltd (WIPL)' : Critical
Path
CPM/PERT Project planning/ Project planning/
scheduling technique scheduling technique
Cost overrun Delays in project Delays in project

Multiple Choice Single Answer


Question This Question refers to the case of 'The Irate Vendor' : The new
policy of the company is :-
Correct Answer To keep minimum inventory

Your Answer Order material at lowest price

Multiple Choice Single Answer


Question This Question refers to the case of 'Narmada Electricals
Ltd.(NEL)' : Mr. Ashok Rai, General Manager is concerned about
stock of surplus/obsolete material :-
Correct Answer Lyinig in stores

Your Answer Lying in shop floor

Multiple Choice Multiple Answer


Question This Question refers to the case 'Quality Gauges Pvt. Ltd.' : The
consultant made following recommendations :-
Correct Answer Creation of industrial engineering department , Methods
improvement & fixation of performance standards , Introduction
of incentive scheme
Your Answer Methods improvement & fixation of performance standards ,
Introduction of incentive scheme , Decentralization and
reorganization of Production Engg. Department

Select The Blank


Question This Question refers to the case 'Quality Gauges Pvt. Ltd.' : After
the introduction of scheme, shop floor manager has complained
of pressure from workmen for ________.
Correct Answer Overtime
Your Answer Overtime

Select The Blank


Question The question refer to the case on 'Kalpak Engineers' : Raw
material in the form of bar stock is supplied by the ________.
Correct Answer Customer

Your Answer Stockiest

Select The Blank


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : Incentive scheme should not be regarded as a
substitute for ________ wage structure.
Correct Answer Poor

Your Answer Adhoc

Multiple Choice Multiple Answer


Question The question refer to the case on 'Kalpak Engineers' : For
manufacturing Stay Bolt following machines are planned:-
Correct Answer Copying Lathe , Radial Drilling Machine , Thread Rolling
machine
Your Answer Copying Lathe , Radial Drilling Machine , Thread Rolling
machine

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Northern Machinery Limited'
: The writer of anonymous letter :-
Correct Answer Is a share holder of the company , Has the interest of the
shareholders of the company , Wants the Company to put a stop
before it is too late
Your Answer Has the interest of the shareholders of the company , Wants the
Company to put a stop before it is too late , Has not received
payment for his supplies

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers' : This case
is concerned with following element of production planning:-
Correct Answer Routing

Your Answer Manufacturing Cost reduction

True/False
Question This question refers to case on Morbay Engineering Works
(MEW).Overtime tend to reward more than incentive scheme.
Correct Answer True

Your Answer True


True/False
Question This question refers to case on 'Morbay Engineering Works
(MEW)' : Under Scanlon Plan employee is paid incentive bonus
based on individual efforts and additional output.
Correct Answer True

Your Answer False

Multiple Choice Multiple Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : For
calculating fixed labour cost following data is required:-
Correct Answer Set up time for operation , Labour hour rate , No of production
runs per year
Your Answer Set up time for operation , Labour hour rate , No of production
runs per year

Multiple Choice Single Answer


Question This Question refers to the case of 'Universal Fasteners Ltd.' :
Heat Treatment process for the studs involves two operations viz
:-
Correct Answer Hardening & Tempering

Your Answer Hardening & Tempering

Multiple Choice Multiple Answer


Question This Question refers to the case 'Suyog Udyog' : Operation
details are as follows :-
Correct Answer Drill and ream 3 holes, 14 mm dia , Deburr , Mill 2 slots 28 mm
wide
Your Answer Deburr , Mill 2 slots 28 mm wide , Drill and ream 3 holes, 14 mm
dia

Multiple Choice Multiple Answer


Question This question refers to 'Automotive Gears Private Limited' : The
spline Grinding machine is used for operation :-
Correct Answer Spline Grind (section'AA') , Spline Grind (section'BB') , Spline
Grind (section'CC')
Your Answer Spline Grind (section'AA') , Spline Grind (section'BB') , Spline
Grind (section'CC')

True/False
Question This question refers to the case of 'Northern Machinery Ltd' : The
company's suppliers are of all sizes and scattered across the
country.
Correct Answer True

Your Answer True


Multiple Choice Single Answer
Question This question refers to 'Automotive Gears Private Limited' : It is :-

Correct Answer An O.E. Supplier

Your Answer An O.E. Supplier

Multiple Choice Single Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' :
Power consumption cost is considered as :-
Correct Answer Variable overhead cost

Your Answer Variable cost

Multiple Choice Multiple Answer


Question The question refer to the case on 'Kalpak Engineers' : Following
are the operations involved in manufacturing stay bolt in the
case:-
Correct Answer Copy turning , Thread Rolling , Drilling

Your Answer Threading , Copy turning , Thread Rolling

Multiple Choice Multiple Answer


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
Following is the information requirement for using CPM/PERT
techniques:-
Correct Answer List of activities , Activity duration , Precedent relationship of the
activities
Your Answer List of activities , Activity duration , Person responsible for
activity completion

True/False
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
The management knew the activities involved, their durations
and interrelationship, still are not in position to tell when the
project will be completed.
Correct Answer True

Your Answer True

Multiple Choice Single Answer


Question This Question refers to the case 'Indus Foundries Ltd.' :In the
proposed plant, heating of charge is to be done by :-
Correct Answer Induction furnace

Your Answer Steam boiler

Select The Blank


Question This question refers to 'Automotive Gears Private Limited' : The
case study requires calculation of set up ________ for the job.
Correct Answer Cost

Your Answer Cost

True/False
Question This Question refers to the case of 'Universal Fasteners Ltd.' :
Mr. Sharma, Production Engineer informed Mr. Kaul that
Hardening & Tempering was the last operation.
Correct Answer True

Your Answer False

Multiple Choice Single Answer


Question This Question refers to the case of 'National Engineering Co' :
As per Mr. Khanna( Planning Manager) sales plans are changed
:-
Correct Answer Overnight

Your Answer Yearly

True/False
Question This Question refers to the case 'Indus Foundries Ltd.' : Skilled
manpower at worker level is not available in plenty at Kolhapur.
Correct Answer False

Your Answer False

Select The Blank


Question This Question refers to the case 'Quality Gauges Pvt. Ltd.' : The
agreement mentioned that Incentive amount will be paid along
with ________.
Correct Answer Wages

Your Answer Wages

True/False
Question This Question refers to the case of 'Universal Fasteners Ltd.' :
The organization has reputation for poor deliveries.
Correct Answer False

Your Answer False

Multiple Choice Multiple Answer


Question This Question refers to the case 'Quality Gauges Pvt. Ltd.' :
Salient features of the scheme were published in the form of
small booklet which indicated :-

Correct Answer Incentive period , Incentive payment , Basis of payment

Your Answer Incentive period , Incentive payment , Basis of payment

True/False
Question This Question refers to the case of 'Classic Engineering
Components Ltd.' : Mr. Sen noticed that each worker was
provided with the drawing of the component.
Correct Answer False

Your Answer False

Select The Blank


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : The
item exhaust manifold is presently not ________.
Correct Answer Manufactured

Your Answer Manufactured

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers' : Process
sheet does not provide following data:-
Correct Answer Shift

Your Answer Shift

Multiple Choice Single Answer


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : One of the most popular and widely used incentive plan
is called by following name:-
Correct Answer Scanlon Plan

Your Answer Scanlon Plan

Multiple Choice Single Answer


Question This Question refers to the case of 'Universal Fasteners Ltd.' :
The General Manager gets the news that the Studs supplied
them have broken :-
Correct Answer While assembling

Your Answer While assembling

Select The Blank


Question This question refers to 'Automotive Gears Private Limited' : The
company produces items for ________ manufacturers.
Correct Answer Automobile

Your Answer Automobile

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Kerson Automobiles' : As per
the MD, the company is faced with following problems :-
Correct Answer Union leaders do not work , Lower efficiency of the mechanics,
as they do not work at their place of work , Union leaders waste
their time
Your Answer Lower efficiency of the mechanics, as they do not work at their
place of work , Unsatisfactory layout

Multiple Choice Single Answer


Question This Question refers to the case of 'Universal Fasteners Ltd.' :
Mr. Bose, Purchase Engineer informed Mr. Kaul that previous lot
of 500 kg material was purchased from :-
Correct Answer A source who is not in the approved list

Your Answer A source who is not in the approved list, but sample check was
carried out before acceptance

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers' : In the
case for all machining operations following data on time is
furnished:-
Correct Answer Setup time and standard time separately

Your Answer Setup time and standard time separately

Multiple Choice Single Answer


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : The Scanlon plan for incentive payment is useful for
the organizations of following characteristic:-
Correct Answer Highly labour intensive

Your Answer Highly labour intensive

Match The Following


Question Correct Answer Your Answer

Material from different Due to paucity of space Due to paucity of space


sources gets mixed up at
stores
Raw material is received Without test certificate Without test certificate

This Question refers to the 100 % inspection for 100 % inspection for
case of 'Universal hardness and cracks hardness and cracks
Fasteners Ltd.' : Dispatch
of studs, ready at works
Acceptance of raw In view of urgency of In view of urgency of
materials as a special delivery delivery
case

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers' :Kalpak
Engineers have contracted from a boiler company manufacturing
of 500 nos of stay bolt. In the manufacturing process grinding
operation is carried out on following machine :-
Correct Answer Cylindrical grinder

Your Answer Cylindrical grinder

Select The Blank


Question This Question refers to the case of 'Eagle Machine Company' :
The purchase department is responsible only for buying and
________.
Correct Answer Expediting

Your Answer Stocking

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Northern Machinery Limited'
: As per Materials Manager basis of awarding contract is :-
Correct Answer Justified in each case , All Purchase orders above Rs. 10,000/-
are counter signed by him , All Purchase orders above Rs.
50,000/- are signed by V.P.
Your Answer All Purchase orders above Rs. 10,000/- are counter signed by
him , All Purchase orders above Rs. 50,000/- are signed by V.P.
, Case to case basis

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Kerson Automobiles' : The
huge work table placed outside the machine shop can be used
to carry out :-
Correct Answer Filing work , Debarring work , Cleaning work

Your Answer Filing work , Debarring work , Cleaning work

True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : The
average efficiency on the other components currently being
produced is around 75%.
Correct Answer True

Your Answer True


Select The Blank
Question This Question refers to the case of 'Eagle Machine Company' :
The Marketing Manager ________ the finished stock.
Correct Answer Controls

Your Answer Controls


LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Universal Fasteners Ltd.' :
Mr Sharma, Production Engineer informed Mr. Kaul that :-
Correct Answer Heat treatment operator is a new one . , Material testing was
done by a worker as Raw Material Inspector was absent , Visual
checking for cracks on sample basis was carried out
Your Answer Material testing was done by a worker as Raw Material Inspector
was absent , Visual checking for cracks on sample basis was
carried out , Workers were instructed to observe the cracks
during machining.

Multiple Choice Single Answer


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
For finding out the duration of completion of a project following
technique is not used:-
Correct Answer Project Evaluation and Control Technique

Your Answer Network Analysis/Planning

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Classic Engineering
Components Ltd.' : The company has well established machine
shop having more than 150 machines and :-
Correct Answer A heat treatment shop , Metrology section , Packing section

Your Answer A heat treatment shop , Metrology section , Packing section

True/False
Question This Question refers to the case of 'The Gujrat Engineering
company Limited' : The company received an order and finally
authorized completion of the forging and placed it in stock.
Correct Answer False

Your Answer True

Multiple Choice Single Answer


Question This Question refers to the case of 'Northern Machinery Limited'
: Khan had used a paper to deliver a talk to his senior buyers.
This paper contained :-
Correct Answer Summary of purchases

Your Answer Summary of purchases

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Hansa Tractomotive Ltd.':
The contract with Kay Jee Hydraulics Ltd was agreed with
following terms & conditions :-
Correct Answer Price per unit FOR Bombay , Delivery 10-12 weeks after receipt
of buyer's confirmed order , Payment 60 days after dispatch of
material
Your Answer Price per unit FOR Bombay , Delivery 10-12 weeks after receipt
of buyer's confirmed order , Payment 60 days after dispatch of
material

Match The Following


Question Correct Answer Your Answer

Inspection Dimensional accuracy Dimensional accuracy

The question refer to the Saw off Saw off


case on 'Kalpak
Engineers' : First
operation
Consecutive operations Copy turning machine Copy turning machine

Last machining operation Thread rolling Thread rolling

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Geer Company' : The
problems reported are :-
Correct Answer Delays in placing orders , Frequently late deliveries , Incorrect
ordering quantities
Your Answer Delays in placing orders , Frequently late deliveries , Incorrect
ordering quantities

Multiple Choice Single Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : The
case is about decision making in one of the areas given below:-
Correct Answer Make or Buy

Your Answer Make or Buy

Select The Blank


Question This Question refers to the case of 'K.T Gears' : The problem
envisages determining the rate of ________ before and after
improvement in the existing method.
Correct Answer Production

Your Answer Speed

Multiple Choice Single Answer


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
Though the company has acquired a ready factory building,
following task is yet to be completed:-
Correct Answer Modification/finishing work in the building

Your Answer Modification/finishing work in the building

Select The Blank


Question This Question refers to the case of 'The Irate Vendor' : Jones
had been brought in by a management consultant to ________
the department's buying activities.
Correct Answer Centralize

Your Answer Centralize

True/False
Question This Question refers to the case of 'Kerson Automobiles' : Some
areas can not be used because of odour emanating from
adjoining two painting bays.
Correct Answer True

Your Answer True

True/False
Question This Question refers to the case of 'Narmada Electricals Ltd.'
:The rates of scrap were reviewed from time to time.
Correct Answer False

Your Answer False

Select The Blank


Question The question refer to the case on 'Kalpak Engineers' : The
sawed off pieces from power hacksaw are then moved to
________ facing and centering machine.
Correct Answer Special- purpose

Your Answer Special- purpose

Multiple Choice Single Answer


Question This Question refers to the case of 'Classic Engineering
Components Ltd.' : Mr. Sen noticed in the gangway a couple of
bins containing :-
Correct Answer Semi processed components

Your Answer Semi processed components

Multiple Choice Single Answer


Question This Question refers to the case of Narmada Electricals Ltd.:
G.M. recruited a senior purchase manager, Mr. Sajid Durrani in
the purchased department :-
Correct Answer In view of need to procure parts/components for development in
time
Your Answer In view of need to procure parts/components for development in
time

True/False
Question This Question refers to the case of 'The Geer Company' : During
the period of rapid expansion, it became necessary to
subcontract a significant volume of machining operations.
Correct Answer True

Your Answer True

True/False
Question This Question refers to the case of 'K.T Gears' : The activities
performed by the operator are listed on the practitioner's data
sheet.
Correct Answer True

Your Answer True

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Kerson Automobiles' : As per
consultants, problems are due to following reasons :-
Correct Answer Material flow (Cars) is not smooth , A major chunk of productive
time is lost in obtaining replacement of spares from stores. , Too
often, helpers are found busy in transferring parts from work
table to a hand trolley.
Your Answer Material flow (Cars) is not smooth , A major chunk of productive
time is lost in obtaining replacement of spares from stores. , Too
often, helpers are found busy in transferring parts from work
table to a hand trolley.

Select The Blank


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' :
Each raw casting weighs 0.45 Kgs and costs Rs 4.5 which
includes cost of ________.
Correct Answer Transportation

Your Answer Transportation

Select The Blank


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Jigs
and fixtures once provided will be able to maintain accuracy up
to about ________ pieces.
Correct Answer 20000
Your Answer 20000

Select The Blank


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : Incentive scheme is a tool to create ________
capacity, increase productivity and reduce manufacturing costs.
Correct Answer More

Your Answer More

Multiple Choice Single Answer


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
The WIPL project involves several activities like procurement of
material/machines, hiring people, civil work, training, trial run etc.
If duration of all the activities is known then project duration will
be one of the following :-
Correct Answer Less than sum of duration of all the activity's

Your Answer Equal to sum of duration of all the activity's

Multiple Choice Single Answer


Question This Question refers to the case of 'The Geer Company' : The
company is engaged in the business of manufacturing :-
Correct Answer Heavy-duty road building equipment

Your Answer Heavy-duty road building equipment

Multiple Choice Multiple Answer


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
For the project following tasks are yet to be completed :-
Correct Answer Purchase of machinery , Purchase of material , Recruitment of
personnel
Your Answer Purchase of machinery , Purchase of material , Recruitment of
personnel

True/False
Question This Question refers to the case of 'Hansa Tractomotive Ltd.' :
Kay Jee dispatched the consignment as per the terms of the
order.
Correct Answer False

Your Answer False

Select The Blank


Question This Question refers to the case of 'Universal Fasteners Ltd.' : In
the tempering process of studs, the ________ was reduced to
25-28 HRC.
Correct Answer Hardness

Your Answer Hardness

True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : It is
economical to continue subcontracting the machining of Exhaust
Manifold to vendors.
Correct Answer False

Your Answer True

Match The Following


Question Correct Answer Your Answer

Machine shop congested Shortage of space Shortage of space


with semi-processed
material kept in the bins
and components lying on
the floors all around.
This Question refers to the Shared by operators Shared by operators
case of 'Classic
Engineering Components
Ltd.' : Measuring
instruments like vernier
calipers, micrometers or
gauges
Unispected lots Processed Processed

Responsibility of oiling Maintenance department Maintenance department


/greasing

Multiple Choice Single Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' :
Following is One apparent saving if the machining is done at the
company's own plant:-
Correct Answer Sale of scrap

Your Answer Sale of scrap

Select The Blank


Question This Question refers to the case of 'The Gujrat Engineering
company Limited' : The ________ supplier invoiced this
company for a cancellation charge.
Correct Answer Original

Your Answer Original


True/False
Question This question refers to case on 'Morbay Engineering Works
(MEW)' : "It is difficult to install an incentive scheme and easy to
withdraw when desired."
Correct Answer False

Your Answer False

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Divgi Metalwares Private
Limited' : As per the Activity description given in the table,
Preparation of operational layout activity affects following
activities :-
Correct Answer Design and draft hobbing fixture , Procure plug gauge , Procure
ring gauge
Your Answer Design and draft hobbing fixture , Procure plug gauge , Procure
ring gauge

Multiple Choice Single Answer


Question This Question refers to the case of 'National Engineering Co.' :
As per GM, the route cause of this non-sensical situation is lack
of :-
Correct Answer Co-ordination

Your Answer Co-ordination

Multiple Choice Single Answer


Question This question refers to case on 'Morbay Engineering Works
(MEW) : Weakest area of functioning of MEW is:-
Correct Answer Inability to say no to customers

Your Answer Inability to say no to customers

Select The Blank


Question This Question refers to the case of 'Northern Machinery Limited'
: M.D. has asked for ________ from the Vice President.
Correct Answer Explanation

Your Answer Explanation

Select The Blank


Question This Question refers to the case 'Suyog Udyog' : The process
sheet involves selection of ________ time.
Correct Answer Cycle

Your Answer Cycle


True/False
Question This Question refers to the case of 'Kerson Automobiles' : The
decision to utilize gnagway space as "Service Bays" is good.
Correct Answer False

Your Answer False

Select The Blank


Question This question refer to the case on "Allied Industries Pvt Ltd" :
Allied Industries Pvt ltd is a small ________ concern with 25
workmen.
Correct Answer Proprietary

Your Answer Proprietary

Multiple Choice Single Answer


Question This Question refers to the case of Narmada Electricals
Ltd.(NEL) : This company is about 15 years old, manufactures
electric motors and caters to the requirement of :-
Correct Answer Engineering industry and railways

Your Answer Engineering industry and railways

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Autogears Private Limited' :
Work elements performed by a gear shaving operator are :-
Correct Answer Load gear on mandrel and secure it with a nut , Raise bed to
enable gear teeth to mesh with cutter teeth , Unlock nut and
remove gear from the mandrel
Your Answer Load gear on mandrel and secure it with a nut , Raise bed to
enable gear teeth to mesh with cutter teeth , Unlock nut and
remove gear from the mandrel

Multiple Choice Single Answer


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
Weldtech India Private Ltd proposes to manufacture following
products:-
Correct Answer General purpose welding electrodes

Your Answer General purpose welding electrodes

Multiple Choice Single Answer


Question This Question refers to the case of 'Hansa Tractomotive Ltd.' :
The machines were completed by Kay Jee :-
Correct Answer Within the stipulated delivery period

Your Answer Within the stipulated delivery period


True/False
Question This question refer to the case on "Allied Industries Pvt Ltd"
:Capital recovery per annum is an element of fixed cost.
Correct Answer True

Your Answer True

Multiple Choice Single Answer


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : MEW management would never say no to customer. If
a customer require material urgently, they would meet his
requirement by doing the following:-
Correct Answer Load the new job on machines in place of existing running
orders
Your Answer Subcontracting the jobs

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Artwood Products' : The cost
of manufacturing has increased due to :-
Correct Answer Blockage of funds in inventory , Longer manufacturing cycle time
, Poor quality of products
Your Answer Blockage of funds in inventory , Longer manufacturing cycle time
, Poor quality of products
Select The Blank
Question This Question refers to the case of 'Kerson Automobiles' :
Battery charger placed on one end of table creates ________.
Correct Answer Nuisance

Your Answer Nuisance

Match The Following


Question Correct Answer Your Answer

Mechanics going to clerk Get the replacements Get the replacements


with requisition authorization authorization
This Question refers to the Obtaining replacement of Obtaining replacement of
case of 'Kerson spares from stores spares from stores
Automobiles' : Loss of
productive time
Transfer of parts from Blowing off parts clean Blowing off parts clean with
work table to a hand with compressed air compressed air
trolley and pushing it out
to the service bay
Space for storage of seats Avoid wasteful Avoid wasteful movements
inside the workshop movements

Select The Blank


Question The question refer to the case on 'Kalpak Engineers' : The
sawed off pieces from power hacksaw are then moved to
________ facing and centering machine.
Correct Answer Special- purpose

Your Answer Special- purpose

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Geer Company' : The
problems reported are :-
Correct Answer Delays in placing orders , Frequently late deliveries , Incorrect
ordering quantities
Your Answer Delays in placing orders , Frequently late deliveries , Incorrect
ordering quantities

Select The Blank


Question This Question refers to the case 'Quality Gauges Pvt. Ltd.' : The
agreement mentioned that Incentive amount will be paid along
with ________.
Correct Answer Wages

Your Answer Wages


Multiple Choice Single Answer
Question This Question refers to the case of 'Universal Fasteners Ltd.' :
The General Manager gets the news that the Studs supplied
them have broken :-
Correct Answer While assembling

Your Answer While assembling

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers' : This case
is concerned with following element of production planning:-
Correct Answer Routing

Your Answer Routing

Multiple Choice Single Answer


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
The company WIPL is :
Correct Answer A new organization at project stage

Your Answer An established organization for around a decade

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers' :Kalpak
Engineers have contracted from a boiler company manufacturing
of 500 nos of stay bolt. In the manufacturing process grinding
operation is carried out on following machine :-
Correct Answer Cylindrical grinder

Your Answer Cylindrical grinder

Multiple Choice Single Answer


Question This Question refers to the case of 'Northern Machinery Limited'
: The V.P. informed the Material Manager that the anonymous
letter was received by :-
Correct Answer M.D.

Your Answer M.D., with copy to all the directors

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Artwood Products' : The cost
of manufacturing has increased due to :-
Correct Answer Blockage of funds in inventory , Longer manufacturing cycle time
, Poor quality of products
Your Answer Blockage of funds in inventory , Longer manufacturing cycle time
, Poor quality of products

True/False
Question This Question refers to the case 'Suyog Udyog' : The operation
time for C' sunk 14 dia holes on both sides is 0.50 per piece.
Correct Answer True

Your Answer True

True/False
Question This Question refers to the case of 'Hansa Tractomotive Ltd.' :
Kay Jee dispatched the consignment as per the terms of the
order.
Correct Answer False

Your Answer False

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers' : Process
sheet does not provide following data:-
Correct Answer Shift

Your Answer Shift

True/False
Question This Question refers to the case of 'K.T Gears' : The activities
performed by the operator are listed on the practitioner's data
sheet.
Correct Answer True

Your Answer True

Multiple Choice Multiple Answer


Question This question refer to the case on "Allied Industries Pvt Ltd" :
Following are cost elements of make indicator :-
Correct Answer Transport cost , Tooling cost , Indirect Employee cost

Your Answer Tooling cost , Indirect Employee cost , Power cost

Select The Blank


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' :
Each raw casting weighs 0.45 Kgs and costs Rs 4.5 which
includes cost of ________.
Correct Answer Transportation

Your Answer Transportation

Multiple Choice Single Answer


Question This Question refers to the case of 'Eagle Machine Company' :
The company is facing following problem :-
Correct Answer Sales are declining

Your Answer Sales are declining

Multiple Choice Single Answer


Question This Question refers to the case of 'The Geer Company' : The
purchase of steel was done exclusively by :-
Correct Answer One buyer

Your Answer One buyer

True/False
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
Installation of machine should follow recruitment of workmen.
Correct Answer True

Your Answer True

Select The Blank


Question This Question refers to the case of 'Kerson Automobiles' :
Haphazard parking of cars inside the workshop, leads to
________ movements.
Correct Answer Unproductive

Your Answer Unproductive

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers' : In the
case for all machining operations following data on time is
furnished:-
Correct Answer Setup time and standard time separately

Your Answer Setup time and standard time separately

Match The Following


Question Correct Answer Your Answer

Capacity cost Unabsorbed overheads Unabsorbed overheads

This question refers to Variable over head Variable over head


case on 'Uma Tools Pvt
Ltd (UTPL)' : Power cost
Setup cost Fixed labour cost Direct cost

Material cost Direct cost Marginal cost


True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : The
cost of foundry reject is borne by the company.
Correct Answer True

Your Answer True

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Classic Engineering
Components Ltd.' : The company has well established machine
shop having more than 150 machines and :-
Correct Answer A heat treatment shop , Metrology section , Packing section

Your Answer A heat treatment shop , Metrology section , Packing section

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Universal Fasteners Ltd.' :
Mr Sharma, Production Engineer informed Mr. Kaul that :-
Correct Answer Material testing was done by a worker as Raw Material Inspector
was absent , Visual checking for cracks on sample basis was
carried out , Heat treatment operator is a new one .
Your Answer Material testing was done by a worker as Raw Material Inspector
was absent , Visual checking for cracks on sample basis was
carried out , Heat treatment operator is a new one .

True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : It is
economical to continue subcontracting the machining of Exhaust
Manifold to vendors.
Correct Answer False

Your Answer False

Select The Blank


Question This Question refers to the case of 'The Irate Vendor' : As per
Jones, the new ________ procedures were sound.
Correct Answer Purchasing

Your Answer Purchasing

Select The Blank


Question This question refer to the case on "Allied Industries Pvt Ltd" :
One of the assumptions of the case is- other incidental costs
(e.g. paper work, Transport charges for acquiring and regrinding
thread roll) are ________.
Correct Answer Negligible
Your Answer Negligible

Multiple Choice Single Answer


Question This Question refers to the case of Narmada Electricals Ltd.:
G.M. recruited a senior purchase manager, Mr. Sajid Durrani in
the purchased department :-
Correct Answer In view of need to procure parts/components for development in
time
Your Answer In view of need to procure parts/components for development in
time

Select The Blank


Question This Question refers to the case of 'The Gujrat Engineering
company Limited' : The ________ supplier invoiced this
company for a cancellation charge.
Correct Answer Original

Your Answer Original

Multiple Choice Multiple Answer


Question This question refers to 'Automotive Gears Private Limited' : For
Hob splines Operations, it uses :-
Correct Answer Newark Hobbing machine , Thread Milling machine , Cleaveland
Hobbing machine
Your Answer Cleaveland Hobbing machine , Newark Hobbing machine ,
Thread Milling machine

True/False
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
In order to save time in construction, ready factory building was
purchased.
Correct Answer True

Your Answer True

True/False
Question This Question refers to the case of 'Classic Engineering
Components Ltd.' : Mr. Sen noticed that each worker was
provided with the drawing of the component.
Correct Answer False

Your Answer False

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Hansa Tractomotive Ltd.':
The contract with Kay Jee Hydraulics Ltd was agreed with
following terms & conditions :-
Correct Answer Price per unit FOR Bombay , Delivery 10-12 weeks after receipt
of buyer's confirmed order , Payment 60 days after dispatch of
material
Your Answer Price per unit FOR Bombay , Delivery 10-12 weeks after receipt
of buyer's confirmed order , Payment 60 days after dispatch of
material

Multiple Choice Single Answer


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : The success of an incentive plan to a large extent
depends on the following factor:-
Correct Answer Quality of performance standard

Your Answer Inspection and Quality Control System

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Kerson Automobiles' : As per
consultants, problems are due to following reasons :-
Correct Answer Material flow (Cars) is not smooth , A major chunk of productive
time is lost in obtaining replacement of spares from stores. , Too
often, helpers are found busy in transferring parts from work
table to a hand trolley.
Your Answer Material flow (Cars) is not smooth , A major chunk of productive
time is lost in obtaining replacement of spares from stores. , Too
often, helpers are found busy in transferring parts from work
table to a hand trolley.

Multiple Choice Multiple Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : If
the Exhaust Manifold is manufactured in house, following costs
wll increase:-
Correct Answer Cost of power , Cost of labour , Cost of consumables like
grease, lubricant
Your Answer Cost of power , Cost of labour , Cost of consumables like
grease, lubricant

True/False
Question This Question refers to the case of 'Kerson Automobiles' : MD
has agreed to carry out modification of existing plant.
Correct Answer True

Your Answer True

Multiple Choice Single Answer


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' :
Though the company has acquired a ready factory building,
following task is yet to be completed:-
Correct Answer Modification/finishing work in the building
Your Answer Modification/finishing work in the building

Multiple Choice Single Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : The
case is about decision making in one of the areas given below:-
Correct Answer Make or Buy

Your Answer Make or Buy

Multiple Choice Multiple Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : If
the Exhaust Manifold is to be manufactured in house, following
are the requirements:-
Correct Answer New jigs and fixtures , Additional shift , Additional manpower

Your Answer New jigs and fixtures , Additional shift , Additional manpower

Select The Blank


Question This Question refers to the case of 'Universal Fasteners Ltd.' :
Personnel Officer Mr. Sinha informed Mr. Kaul that Employee
________ is very high.
Correct Answer Turnover

Your Answer Turnover

Select The Blank


Question This Question refers to the case of 'Eagle Machine Company' :
The Marketing Manager ________ the finished stock.
Correct Answer Controls

Your Answer Controls

Multiple Choice Multiple Answer


Question This question refers to case on 'Morbay Engineering Works
(MEW)' : An incentive plan can be considered as a tool for
following:-
Correct Answer Increase productivity , Create more capacity , Reduce
manufacturing costs
Your Answer Increase productivity , Create more capacity , Reduce
manufacturing costs

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Gujrat Engineering
company Limited' : The company has received a special order
where :-
Correct Answer A special cylinder is to be manufactured. , The item is to be
manufactured from a hollow bored forging , Fastest delivery is
requested
Your Answer A special cylinder is to be manufactured. , The item is to be
manufactured from a hollow bored forging , Fastest delivery is
requested

Select The Blank


Question This Question refers to the case of 'Artwood Products' : Entire
shop floor was ________ due to piles of work in progress.
Correct Answer Congested

Your Answer Congested


CASES OF OPERATIONS MANAGEMENT

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

Select The Blank


Question This Question refers to the case of 'Narmada Electricals Ltd.' : The disposal of
material was done on ________ basis.
Correct Answer Weight

Your Answer Weight

Select The Blank


Question This Question refers to the case of 'National Engineering Co.' : GM commented
that every department in this company competes with others in matter of
________.
Correct Answer Inefficiency

Your Answer Inefficiency

Select The Blank


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Delays in
execution of project leads to cost ________.
Correct Answer Overrun

Your Answer Overrun

True/False
Question This Question refers to the case of 'Artwood Products' : It is necessary to keep
stock of standard furniture to cater to sudden requirement of the customers.
Correct Answer True

Your Answer True

Multiple Choice Single Answer


Question This Question refers to 'Automotive Gears Private Limited' : The company, for its
various items, has recently introduced the concept of :-
Correct Answer Economic lot size

Your Answer Economic lot size

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Narmada Electricals Ltd.' : Other material
considered to be scrap/obsolete is :-
Correct Answer Packing material , Maintenance spares , Parts/components

Your Answer Packing material , Maintenance spares , Parts/components , Electric motors

True/False
Question This Question refers to the case of 'Kerson Automobiles' : MD has agreed to carry
out modification of existing plant.
Correct Answer True

Your Answer True

1
Multiple Choice Single Answer
Question This Question refers to the case of Narmada Electricals Ltd.: G.M. recruited a
senior purchase manager, Mr. Sajid Durrani in the purchased department :-
Correct Answer In view of need to procure parts/components for development in time

Your Answer In view of need to procure parts/components for development in time

Multiple Choice Single Answer


Question This question refers to case on 'Morbay Engineering Works (MEW)' : Following
was the solution conceived by the Production Manager to the need of increasing
production:-
Correct Answer Introduction of incentive scheme

Your Answer Introduction of incentive scheme

Select The Blank


Question This question refers to case on 'Morbay Engineering Works (MEW)' : Overtime
must be ________ to guarantee the success of the wage incentive scheme.
Correct Answer Eliminative

Your Answer Eliminative

Multiple Choice Multiple Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : If the Exhaust
Manifold is manufactured in house, following costs wll increase:-
Correct Answer Cost of power , Cost of labour , Cost of consumables like grease, lubricant

Your Answer Cost of power , Cost of labour , Cost of consumables like grease, lubricant , Fixed
overheads

Multiple Choice Single Answer


Question This Question refers to the case of 'The Geer Company' : The purchase of steel
was done exclusively by :-
Correct Answer One buyer

Your Answer One buyer

Multiple Choice Single Answer


Question This Question refers to the case of 'Kerson Automobiles' : Cars are manually
pushed over the wooden stand placed in the major repairs section because of :-
Correct Answer Absence of the underground pit

Your Answer Absence of the underground pit

True/False
Question This question refers to case on 'Morbay Engineering Works (MEW)' : Under
Scanlon Plan employee is paid incentive bonus based on individual efforts and
additional output.
Correct Answer True

Your Answer True

True/False
Question This Question refers to the case of 'The Geer Company' : During the period of
rapid expansion, it became necessary to subcontract a significant volume of

2
machining operations.

Correct Answer True

Your Answer True

Multiple Choice Single Answer


Question This Question refers to the case of 'K.T Gears' : The groove cutting operation is
performed at the :-
Correct Answer Capston lathe

Your Answer Capston lathe

Multiple Choice Single Answer


Question This question refer to the case on "Allied Industries Pvt Ltd" : Following cost
element is considered while calculating total cost of buying :-
Correct Answer Transport cost

Your Answer Transport cost

Multiple Choice Multiple Answer


Question This Question refers to the case 'Indus Foundries Ltd.' :Following items are readily
available at all the three locations :-
Correct Answer Raw materials , Scrap , Foundry chemicals

Your Answer Raw materials , Scrap , Foundry chemicals , Manpower

Match The Following


Question Correct Answer Your Answer

Capacity cost Unabsorbed overheads Unabsorbed overheads

This question refers to case on Variable over head Variable over head
'Uma Tools Pvt Ltd (UTPL)' :
Power cost
Setup cost Fixed labour cost Marginal cost

Material cost Direct cost Direct cost

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Northern Machinery Limited' : As per Materials
Manager basis of awarding contract is :-
Correct Answer Justified in each case , All Purchase orders above Rs. 10,000/- are counter signed
by him , All Purchase orders above Rs. 50,000/- are signed by V.P.
Your Answer Justified in each case , All Purchase orders above Rs. 10,000/- are counter signed
by him , All Purchase orders above Rs. 50,000/- are signed by V.P. , Case to case
basis

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Divgi Metalwares Private Limited' : As per the
Activity description given in the table, Preparation of operational layout activity
affects following activities :-
Correct Answer Design and draft hobbing fixture , Procure plug gauge , Procure ring gauge

Your Answer Design and draft hobbing fixture , Procure plug gauge , Procure ring gauge ,
Manufacture hobbing fixture

3
Multiple Choice Multiple Answer
Question This Question refers to the case of 'Kerson Automobiles' : As per the MD, the
company is faced with following problems :-
Correct Answer Union leaders do not work , Lower efficiency of the mechanics, as they do not
work at their place of work , Union leaders waste their time
Your Answer Union leaders do not work , Lower efficiency of the mechanics, as they do not
work at their place of work , Union leaders waste their time , Unsatisfactory layout

Multiple Choice Single Answer


Question The question refer to the case on 'Kalpak Engineers' :Kalpak Engineers have
contracted from a boiler company manufacturing of 500 nos of stay bolt. In the
manufacturing process grinding operation is carried out on following machine :-
Correct Answer Cylindrical grinder

Your Answer Cylindrical grinder

Select The Blank


Question This Question refers to the case of 'Artwood Products' : Entire shop floor was
________ due to piles of work in progress.
Correct Answer Congested

Your Answer Congested

Multiple Choice Single Answer


Question This Question refers to the case of 'Hansa Tractomotive Ltd.' : The machines were
completed by Kay Jee :-
Correct Answer Within the stipulated delivery period

Your Answer Within the stipulated delivery period

Select The Blank


Question This Question refers to the case of 'Kerson Automobiles' : The pedestal grinder
mounted on the huge work table, gives out ________ and blows out dust.
Correct Answer Sparks

Your Answer Sparks

Multiple Choice Single Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : Process sheet for
exhaust manifold provides following information:-
Correct Answer Jigs and fixtures required

Your Answer Utilization of machine planned

Multiple Choice Single Answer


Question This question refers to case on Uma Tools Pvt Ltd (UTPL)' : Presently the raw
castings are procured by UTPL and given to machining to three vendors. If UTPL
has to manufacture Exhaust Manifold in house it would have to provide one of the
following:
Correct Answer New jigs and fixtures

Your Answer New jigs and fixtures

Match The Following

4
Question Correct Answer Your Answer

Mechanics going to clerk with Get the replacements Get the replacements
requisition authorization authorization
This Question refers to the case Obtaining replacement of Obtaining replacement of spares
of 'Kerson Automobiles' : Loss spares from stores from stores
of productive time
Transfer of parts from work Blowing off parts clean with Blowing off parts clean with
table to a hand trolley and compressed air compressed air
pushing it out to the service bay
Space for storage of seats Avoid wasteful movements Avoid wasteful movements
inside the workshop

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Irate Vendor' : The old supplier :-

Correct Answer Has been supplying for over 30 years , Does not understand why he has been cut
off , Does not understand why no chance has been given to him to discuss his bid
Your Answer Has been supplying for over 30 years , Does not understand why he has been cut
off , Does not understand why no chance has been given to him to discuss his bid
, Is always asked his opinion about quantity to be ordered

True/False
Question This Question refers to the case of 'K.T Gears' : The activities performed by the
operator are listed on the practitioner's data sheet.
Correct Answer True

Your Answer True

True/False
Question This Question refers to the case of 'Classic Engineering Components Ltd.' : Mr.
Sen noticed that each worker was provided with the drawing of the component.
Correct Answer False

Your Answer False

Select The Blank


Question This Question refers to the case of 'Northern Machinery Limited' : The V.P.
instructed Materials Manager to collect ________ information and evidence to
clarify that their system is foolproof.
Correct Answer Relevant

Your Answer Relevant

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Autogears Private Limited' : Work elements
performed by a gear shaving operator are :-
Correct Answer Load gear on mandrel and secure it with a nut , Raise bed to enable gear teeth to
mesh with cutter teeth , Unlock nut and remove gear from the mandrel
Your Answer Load gear on mandrel and secure it with a nut , Raise bed to enable gear teeth to
mesh with cutter teeth , Unlock nut and remove gear from the mandrel , Raise oil
guard and switch on the machine

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Artwood Products' : The cost of manufacturing
has increased due to :-

5
Correct Answer Blockage of funds in inventory , Longer manufacturing cycle time , Poor quality of
products
Your Answer Blockage of funds in inventory , Longer manufacturing cycle time , Poor quality of
products , Non availability of skilled labour

Select The Blank


Question This Question refers to the case of 'K.T Gears' : The cycle time per piece to
perform the set of activities listed adds up to ________.
Correct Answer 2.30 minutes

Your Answer 2.30 minutes

Select The Blank


Question This Question refers to the case of 'Universal Fasteners Ltd.' : Personnel Officer
Mr. Sinha informed Mr. Kaul that Employee ________ is very high.
Correct Answer Turnover

Your Answer Turnover

Multiple Choice Single Answer


Question This Question refers to the case of 'National Engineering Co.' : As per GM, the
route cause of this non-sensical situation is lack of :-
Correct Answer Co-ordination

Your Answer Co-ordination

Multiple Choice Single Answer


Question This Question refers to the case of 'The Geer Company' : The company had a
small foundry until 1946. This was subsequently closed and the purchase of
ferrous castings were handled by :-
Correct Answer A man who had been a supervisor in the foundry

Your Answer A man who had been a supervisor in the foundry

Multiple Choice Multiple Answer


Question This question refers to case on 'Morbay Engineering Works (MEW)' : An incentive
plan can be considered as a tool for following:-
Correct Answer Increase productivity , Create more capacity , Reduce manufacturing costs

Your Answer Increase productivity , Create more capacity , Reduce manufacturing costs ,
Increase sales

True/False
Question This question refers to 'Automotive Gears Private Limited' : The table given in the
case study gives approximate machine hour rate for each indicated machine.
Correct Answer True

Your Answer True

Select The Blank


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : To manufacture
exhaust Manifild in-house additional capacity is required. Extra capacity can be
generated at UTPL by additional ________.
Correct Answer Shift

Your Answer Shift

6
True/False
Question This Question refers to the case of 'Universal Fasteners Ltd.' : Mr. Sharma,
Production Engineer informed Mr. Kaul that Hardening & Tempering was the last
operation.
Correct Answer True

Your Answer True

Multiple Choice Multiple Answer


Question This Question refers to the case of 'K.T Gears' : The firm is :-

Correct Answer A proprietary firm , Engaged in manufacture of spur gears , Engaged in


manufacture of helical gear
Your Answer A proprietary firm , Engaged in manufacture of spur gears , Engaged in
manufacture of helical gear , Engaged in manufacture of cutting gears

Multiple Choice Multiple Answer


Question This question refer to the case on "Allied Industries Pvt Ltd" : Following are cost
elements of make indicator :-
Correct Answer Transport cost , Tooling cost , Indirect Employee cost

Your Answer Transport cost , Tooling cost , Indirect Employee cost , Power cost

True/False
Question This Question refers to the case of 'Classic Engineering Components Ltd.' : Mr.
Sen was informed by Mr. Ravikant, Materials Manager that counting is not
necessary at every stage as they count at the initial stage and since their workers
and supervisors are experienced, they can easily identify the components at each
stage of production.
Correct Answer True

Your Answer True

True/False
Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Project duration
can always be reduced by deploying additional recourses.
Correct Answer False

Your Answer False

ND
2 COPY

LIST OF ATTEMPTED QUESTIONS AND ANSWERS

True/False
Question This Question refers to the case of 'Divgi Metalwares Private Limited' :
The order has been finalized from a leading engineering firm.
Correct Answer False

Your Answer True

True/False
Question This Question refers to the case of 'Autogears Private Limited' : It takes
0.2 minutes to measure dimensions and set aside gear into the trolley.

7
Correct Answer True

Your Answer True

Multiple Choice Single Answer


Question This Question refers to the case of 'Eagle Machine Company' : The
President demands that in the remaining quarter the firm should :-
Correct Answer Break even

Your Answer Break even

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Narmada Electricals Ltd.' : Production
or Quality department decide when these become surplus/obsolete :-
Correct Answer Part , Component , Item

Your Answer Part , Component , Item , Material

Multiple Choice Multiple Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : While making
Make or Buy decisions, Buy indicator includes following costs :-
Correct Answer Raw material cost , Purchase cost , Fixed overhead cost

Your Answer Raw material cost , Variable overhead cost , Purchase cost , Fixed
overhead cost

Multiple Choice Multiple Answer


Question This question refer to the case on "Allied Industries Pvt Ltd" : Following
are cost elements of make indicator :-
Correct Answer Transport cost , Tooling cost , Indirect Employee cost

Your Answer Transport cost , Tooling cost , Indirect Employee cost , Power cost

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Gujrat Engineering company
Limited' : The forged cylinder ordered on new vendor :-
Correct Answer Was received on schedule , Was priced 15 % lower than the price of the
previous supplier , Had missed out carrying out some machining
operations

Your Answer Was received on schedule , Was priced 15 % lower than the price of the
previous supplier , Had missed out carrying out some machining
operations , Was of sub standard quality

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Divgi Metalwares Private Limited' :
The new items contracted by the company are handled by the
development department for :-
Correct Answer Submission of samples , Manufacture of one or two production lots ,
Transfer to manufacturing department for regular production, after
successful development
Your Answer Submission of samples , Manufacture of one or two production lots ,
Transfer to manufacturing department for regular production, after
successful development , Transfer to sales department for sales, after
successful development

Multiple Choice Multiple Answer

8
Question This Question refers to the case 'Indus Foundries Ltd.' :Following items
are readily available at all the three locations :-
Correct Answer Raw materials , Scrap , Foundry chemicals

Your Answer Manpower , Raw materials , Scrap , Foundry chemicals

Multiple Choice Multiple Answer


Question This Question refers to the case 'Indus Foundries Ltd.':The location of
plant has been narrowed down to following locations :-
Correct Answer Kolhapur , Ahmedabad , Coimbatore

Your Answer Kolhapur , Ahmedabad , Coimbatore , Nasik

Multiple Choice Multiple Answer


Question This Question refers to the case of 'Universal Fasteners Ltd.' : Mr
Banerjee, Manager Quality informed Mr.Kaul that :-
Correct Answer Raw Material received was without test certificate and was not inspected
by the inspector , Laid down procedure for processes of heat treatment,
painting etc. are not followed due to heavy labour turnover and frequent
work allocation , Management has been requested to get the crack
detection machine repaired.
Your Answer Raw Material received was without test certificate and was not inspected
by the inspector , Laid down procedure for processes of heat treatment,
painting etc. are not followed due to heavy labour turnover and frequent
work allocation , Management has been requested to get the crack
detection machine repaired. , Broken studs were not hardened

Match The Following


Question Correct Answer Your Answer

Machine shop congested with Shortage of space Shortage of space


semi-processed material kept
in the bins and components
lying on the floors all around.
This Question refers to the Shared by operators Shared by operators
case of 'Classic Engineering
Components Ltd.' :
Measuring instruments like
vernier calipers, micrometers
or gauges
Unispected lots Processed Identifiable by tags and
markings
Responsibility of oiling Maintenance department Maintenance department
/greasing

Select The Blank


Question This Question refers to the case of 'Kerson Automobiles' : The pedestal
grinder mounted on the huge work table, gives out ________ and blows
out dust.
Correct Answer Sparks

Your Answer Sparks

Multiple Choice Single Answer


Question This Question refers to the case of 'Classic Engineering Components Ltd.'
: This company was acquired by Das Group of Industries. Mr. Mohit
Sen,(head of Business planning function in the corporate office) was

9
visiting the factory as its :-

Correct Answer Turn over was stagnating

Your Answer Turn over was stagnating

Multiple Choice Single Answer


Question This Question refers to the case of 'Divgi Metalwares Private Limited' :
The company is manned by :-
Correct Answer Professional managers

Your Answer Professional managers

Multiple Choice Multiple Answer


Question This question refers to case on 'Morbay Engineering Works (MEW)' :
Following systems are prerequisites for an incentive scheme:-
Correct Answer Good production planning and control system , Good Inspection and
quality control system , Sound system of accounting operators daily
output
Your Answer Good production planning and control system , Good Inspection and
quality control system , Sound system of accounting operators daily
output , Efficient wage payment system

Multiple Choice Multiple Answer


Question This Question refers to the case of 'K.T Gears' : The firm is :-

Correct Answer A proprietary firm , Engaged in manufacture of spur gears , Engaged in


manufacture of helical gear
Your Answer A proprietary firm , Engaged in manufacture of spur gears , Engaged in
manufacture of helical gear , Engaged in manufacture of cutting gears

Select The Blank


Question This Question refers to the case 'Suyog Udyog' : Number of work stations
are to be decided based on assumption that monthly off take is ________
numbers.
Correct Answer 8000

Your Answer 8000

Multiple Choice Single Answer


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : The basic
management problem of WIPL in context of the project is following :-
Correct Answer On which date the project will be completed

Your Answer On which date the project will be completed

Multiple Choice Multiple Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : If the Exhaust
Manifold is to be manufactured in house, following are the requirements:-
Correct Answer New jigs and fixtures , Additional shift , Additional manpower

Your Answer New jigs and fixtures , Additional shift , Additional manpower , Additional
machinery

Select The Blank


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Delays in
completion of ________ would increase Project cost.

10
Correct Answer Project

Your Answer Project

Multiple Choice Single Answer


Question This Question refers to the case of 'Kerson Automobiles' : Distance
traveled every day, by a mechanic to get replacement from stores is :-
Correct Answer 4 to 6 miles

Your Answer 4 to 6 miles

Select The Blank


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : To
manufacture exhaust Manifild in-house additional capacity is required.
Extra capacity can be generated at UTPL by additional ________.
Correct Answer Shift

Your Answer Shift

Multiple Choice Single Answer


Question This question refers to case on 'Morbay Engineering Works (MEW)':
Following is not the prerequisite for sound incentive scheme:-
Correct Answer Existence of union

Your Answer Reporting System for daily production of workers

Multiple Choice Multiple Answer


Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : If the Exhaust
Manifold is manufactured in house, following costs wll increase:-
Correct Answer Cost of power , Cost of labour , Cost of consumables like grease, lubricant

Your Answer Cost of power , Cost of labour , Cost of consumables like grease, lubricant
, Fixed overheads

Select The Blank


Question This Question refers to the case of 'The Geer Company' : The volume of
growth tripled due to ________ management.
Correct Answer Aggressive

Your Answer Aggressive

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Irate Vendor' : The President's
memorandum says :-
Correct Answer We have treated this supplier unfairly , He would like to see if his
complaint is justified , The Vendor's letter suggests that we do not have a
policy on evaluating our vendors
Your Answer We have treated this supplier unfairly , He would like to see if his
complaint is justified , The Vendor's letter suggests that we do not have a
policy on evaluating our vendors , The vendor always quotes high price of
finished goods

Select The Blank


Question This Question refers to the case of 'Divgi Metalwares Private Limited' :
The company has finalized the order for manufacture of a ________
driven gear.

11
Correct Answer Speedmeter

Your Answer Speedmeter

Select The Blank


Question This question refers to case on 'Morbay Engineering Works (MEW)' :
Success of wage incentive plans to a large extent depends on the
________ of performance standards.
Correct Answer Quality

Your Answer Quality

True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : The average
efficiency on the other components currently being produced is around
75%.
Correct Answer True

Your Answer True

True/False
Question This question refers to case on 'Uma Tools Pvt Ltd (UTPL)' : It is
economical to continue subcontracting the machining of Exhaust Manifold
to vendors.
Correct Answer False

Your Answer False

Select The Blank


Question This question refers to case on 'Weldtech India Pvt Ltd (WIPL)' : Delays in
execution of project leads to cost ________.
Correct Answer Overrun

Your Answer Overrun

Multiple Choice Single Answer


Question This Question refers to the case 'Quality Gauges Pvt. Ltd.' : With the
introduction of the scheme :-
Correct Answer The sales picked up

Your Answer The sales picked up

Select The Blank


Question This Question refers to the case of 'National Engineering Co.' : GM
commented that every department in this company competes with others
in matter of ________.
Correct Answer Inefficiency

Your Answer Productivity

Multiple Choice Multiple Answer


Question This Question refers to the case of 'The Irate Vendor' : The old supplier :-

Correct Answer Has been supplying for over 30 years , Does not understand why he has
been cut off , Does not understand why no chance has been given to him

12
to discuss his bid

Your Answer Has been supplying for over 30 years , Does not understand why he has
been cut off , Does not understand why no chance has been given to him
to discuss his bid , Is always asked his opinion about quantity to be
ordered

13