Bill of Material (BOM)

Num Part Name Qty Material Material Finishing Catalog Notes


Supplier
1. Body 1 Metal Sheet Provided - -
2. Body support 4 Metal Provided - -
3. Griller 1 Net Hardware - -
Shop
4. Leg 4 Hollow MS Provided Painted -
5. Hinge 3 Iron Hardware - -
Shop
6. Rivet screw 20 Metal Provided - -

Costing

Num Part Name Qty Price per Total


unit (RM) (RM)
1 Body 1 - -
2 Body support 4 - -
3 Griller 1 4.00 4.00
4 Leg 4 - -
5 Hinge 3 1.00 3.00
6 Rivet screw 20 - -
7 Aerosol Paint 2 7.00 14.00
Total 21.00

Conclusion

Upon the completion of the project entails various experiences and manufacturing
skills that will be useful for the production of product development. The complexities and
skills of the manufacturing processes had been acquired practically as to reference of
theoretical knowledge that had been taught. The barbecue set had been completed on time
according to the pre-planned time frame and all the required components are working
excellently without any troubles. The barbecue set had accomplished several stated
features such as the oval shape for cooking effectiveness, the cleanliness by opening door
mechanism to help in the cleaning process, the convenience through the tools drawer and
the maintenance by installing a replaceable grill.

All the features installed are user-friendly and easy to use. The spray paint
technique is very hard to master but with patient the result is wonderful which provides
an added value to the barbecue set. The completion of the barbecue set not only improves
manufacturing processing skills but foster team working spirit, thoroughly planning,
responsibility delegation and market awareness. On the whole, the project had been a
success with an assortment of knowledge attained.