Beruflich Dokumente
Kultur Dokumente
DATA
MASTER ver.3.1( WITH PLC AND HMI SCREEN 15”)
{MODEL #1, SIMILAR TO QUITO JAYA PROJECT( BUT INPUTS ARE ABOUT 3 TIMES OF QUITO JAYA)}
WE WILL USE BACK ALL EXISITING METALIC CABINETS BOTH IN FIELD AND ECR. ALSO EXTERNAL ALARM DEVICES
SUCH AS ROTATING LAMPS/ HORNS ETC... WILL BE USED BACK.
PLEASE REVERT TO ME ABOUT YOUR EXPECTATIONS AND SUGGESTIONS ON TOTAL SYSTEM AND ALSO PRICING.
DISCOUNT AND ADJUSTMENTS ON SYSTEM CAPACITY CAN BE DISCUSSED PERSONALLY AT YOUR OFFICE.
ENGINE ROOM ALARM MONITORING AND PROCESSING SYSTEM. DATA MASTER ver.3.1( WITH PLC
&SCADA INDUSTRIAL PC MONITOR 20”) {MODEL#2, }
20” HIGH BRIGHT LCD SCREEN TO DISPLAY THE ALARM LOG, DATA
MONITOR PANEL( WITH PROCESSOR, LOG, SET PARAMETERS/ GRAPHIC
1 UNIT
INDUSTRIAL PC, KEY BOARD AND DIAGRAMS/ DATA ENTRY/ AND
MOUSE+ SCADA SOFTWARE) DATA PROCESSING.
LUMP SUM FOR INSTALLATION AND COMMISSIONING (1 SYSTEM ENGINEER+2 INSTRUMENT TECHNICIANS) 10
DAYS REGULAR APPROX. SGD 15,000.00
WE WILL USE BACK ALL EXISITING METALIC CABINETS BOTH IN FIELD AND ECR. ALSO EXTERNAL ALARM DEVICES
SUCH AS ROTATING LAMPS/ HORNS ETC... WILL BE USED BACK.
PLEASE REVERT TO ME ABOUT YOUR EXPECTATIONS AND SUGGESTIONS ON TOTAL SYSTEM AND ALSO PRICING.
DISCOUNT AND ADJUSTMENTS ON SYSTEM CAPACITY CAN BE DISCUSSED PERSONALLY AT YOUR OFFICE.
ENGINE ROOM ALARM MONITORING AND PROCESSING SYSTEM. DATA
MASTER ver.3.1( WITH PLC/RTUs/ INDUSTRIAL PC,21”MONITOR,)
{MODEL#3 , THIS IS REALLY SUITABLE FOR THE VESSEL, BECAUSE OF RTUs}
WE WILL USE BACK ALL EXISITING METALIC CABINETS BOTH IN FIELD AND ECR. ALSO EXTERNAL ALARM DEVICES
SUCH AS ROTATING LAMPS/ HORNS ETC... WILL BE USED BACK.
PLEASE REVERT TO ME ABOUT YOUR EXPECTATIONS AND SUGGESTIONS ON TOTAL SYSTEM AND ALSO PRICING.
DISCOUNT AND ADJUSTMENTS ON SYSTEM CAPACITY CAN BE DISCUSSED PERSONALLY AT YOU OFFICE.