By
PAGE INDEX
TOPIC PAGE NO
1 INTRODUCTION TO PROJECT/SYSTEM
1.1 DOMAIN DESCRIPTION
1.2 OBJECTIVES
1.3 LIMITATIONS OF EXISTING SYSTEM
2 FEASIBILITY ANALYSIS
2.1 TECHNICAL FEASIBILITY
2.2 OPERATIONAL FEASIBILITY
2.3 ECONOMIC FEASIBILITY
2.4 SCHEDULE FEASIBILITY
3 DEVELOPMENT MODEL
4 PROJECT PLAN
4.1 TIMELINE CHART
5 REQUIREMENT STUDY/ANALYSIS
5.1 SYSTEM REQUIREMENTS
5.1.1 FUNCTIONAL REQUIREMENT
5.1.2 NON-FUNCTIONAL REQUIREMENT
5.2 USER REQUIREMENTS AND USE CASES
6 SYSTEM DESIGN
6.1 DESIGN METHODOLOGY
6.2 ACTIVITY DIAGRAM
6.3 SEQUENCE DIAGRAM
6.4 STATE CHART DIAGRAM
6.5 E-R DIAGRAM
6.6 DATA FLOW DIAGRAM
7 STANDARD USED FOR CODING
8 TESTING
9 IMPLEMENTATION
10 SCOPE FOR FUTURE ENHANCEMENT
ANNEXURE
GLOSSARY
BIBLIOGRAPHY
FIGURE INDEX
1 ACTIVITY DIAGRAM
2 SEQUENCE DIAGRAM
3 E-R DIAGRAM
4 DATA FLOW DIAGRAM
PREFACE
It gives us great pleasure in placing in the hands of our esteemed Faculties this individual
report, which, we believe, will go through the documentation of the project work done by
us.
The objective of this report is to provide both a conceptual understanding of the system
as well as working guide.
Surely no other Science as Computer Science is proven as the driving force of the Nation.
Computer Science not only decides the present but also the future. The need for software
development today is a competence in a G.U.I based front-end tool as far as the database
programming is concerned.
A typical scenario today involves an application consisting of a visual front end for
presenting data and reporting options to the enterprise users, and a connection to a
database for piping data to controls such as text boxes, tables, and list boxes. These
applications typically feature reporting functions to provide documentation to teachers
and administrative.
As a student of B. E. (3rd Year) when we acquire all the theoretical knowledge, it is both
necessary and advisable to acquaint the students with the real situation through, well-
planned project in relevant fields. Using all the theoretical knowledge and applying into
the real application we learns to develop efficient real world application at the time of
project training. So, the project training is very important for the student for self-
development and self-confident. Also student learns organizational structure, rules and
regulations and management in a real sense, which helps student to get discipline in all
aspects of life.
Aimed for providing the reader with easier and in-depth knowledge of all the basic as
well as important aspects related to the systems having the functionality's of there
respective fields in form of report. The report contains the literature of almost all the
things, which I have gone through from the point of view of any system development life
cycle.
ACKNOWLEDGEMENT
With great enthusiasm I present this project carried out as a part of Computer semester
VI. I would like to take this opportunity to express my hearty thanks to all those who
have guided, advised, inspired & supported me during the project work. This project
work is an integrated effort of all those persons concerned, without whose co-operation
and effective guidance I couldn’t have achieved its completion
First I would like to thank for giving me the opportunity to work on this project. I would
like to thank my faculty Mrs. Neha Soni for always assisting and helping me in
compilation of the project work successfully. I am very grateful to
I would also like to thank my head of the department Mrs. Bijal Talati for constantly
sharing his knowledge and experience with me throughout the project work.
I am very grateful to all others whose names might not appear in this formal
acknowledgement but the sense of gratitude will always remain in my heart for them.
1.INTRODUCTION TO PROJECT
1.2 Objectives
Employees are the backbone of any company; their management pays a major role in
deciding the success of the organization. Employee information management helps in
deciding the future management needs and any changes that has to be made for greater
productivity. It keeps the records of the functions performed by the individual employee
playing a vital role at the time of performance appraisal. Employee management software
can carry out many functions like employee data analysis, employee monitoring,
centralized employee database, management of the time sheet, etc.
The usage of payroll management system would ultimately reduce the overall
management costs thus ensuring greater profits and reduced burdens. The system is very
easy to use and can adjust into any business frame.
1.3 Limitations of the existing system
The institute doesn’t have any software application which maintains data of the
employees. The record keeping is done manually. This leads to great difficulty when
certain needs arrive of looking into employees’ past data.
The institute uses a payroll application which has limited features and doesn’t work
efficiently and effectively. It doesn’t fulfill many requirement of the administrative
department. The application just keeps very trivial information of the employees and
doesn’t facilitate with any kind of analytical ability.
2.FEASIBILITY ANALYSIS
1. Technical Feasibility
2. Operational Feasibility
3. Economical Feasibility
4. Scheduled Feasibility
2.4 Scheduled feasibility: Projects are always given deadlines. Every project is
completed in a specific duration. I was the only working on the project and I had the
project duration of four months only. So i have tried our level best to fulfill each and
every requirement. I had to complete the project in time and if it is not possible to
complete the software in time then I would try our best to fulfill client requirements.
3.DEVELOPMENT MODEL
The waterfall model is a popular version of the systems development life cycle model for
software engineering. Often considered the classic approach to the systems development
life cycle, the waterfall model describes a development method that is linear and
sequential. Waterfall development has distinct goals for each phase of development.
Imagine a waterfall on the cliff of a steep mountain. Once the water has flowed over the
edge of the cliff and has begun its journey down the side of the mountain, it cannot turn
back. It is the same with waterfall development. Once a phase of development is
completed, the development proceeds to the next phase and there is no turning back.
Thus the waterfall model maintains that one should move to a phase only when its
preceding phase is completed and perfected. However, there are various modified
waterfall models (including Royce's final model) that may include slight or major
variations upon this process.
System
Engineering Analysis
Design
Code
Testing
Maintenance
4.PROJECT PLAN
REQUIREMENT ANALYSIS
DESIGN
CODING
TESTING
DOCUMENTATION
FINAL
4.2 DOCUMENTATION
TEAM ORGANISATION
There are three types of team organizations:
1. DD: Democratic Decentralized
2. CD: Control Decentralized
3. CC: Control Centralized
For our project the team organization is Control Decentralized because here we are
having the lecturers as our guide. The problems are being recognized by them and are
solved by us.
The software project team for “Payroll Management System” consists of 2
member:
Bhavin Patel and Bhavik Patel (S.V.I.T. – Computer department)
The project was undertaken under the guidance of Mrs.Neha Soni, Mr. Milin
Patel And Ms. Jignya Seth.
5.REQUIREMENT ANALYSIS
Nowadays, the world is moving at a lightening swiftness and so is computer field. It is
advancing
each and every day.
Initially the work of project management was done manually and the data was
kept in files
but now the technology is such that each employee who is part of project management
team has
all the projects, their phases, reports all at hand.
Due to which user can quickly know regarding the status of any project and its
progress.
Such is the technology which is increasing at a very fast pace. This system has been made
so, that user can work faster and in a much better environment.
FUNCTIONAL REQUIREMENTS:
NON-FUNCTIONAL REQUIREMENTS:
Hardware Requirements :
Software Requirements :
USER
Login
Registration Process
Selection of
different
Categories
Diff. Depat
View Reports
Exit
6.System Design
Function – 4 Function - 5
1) Add Employee:
Check Access [Not Allowed] Return Error Message
[Allowed]
2)Delete Employee:
[Allowed]
3)Update Employee:
[Allowed]
Sequence diagrams are sometimes called Event-trace diagrams, event scenarios, and
timing diagrams.
USER USER DB SERVER
Enter password
Verify password
User Functions
Verify functions
Acknowledge functions
Perform functions
Display result
Incentive/Increment Backup/Restore
C a t e g a r y
C a n 1 C a n
T a k e T a k e
C a n
H a v e
1 1
C a n E m p l o y e e C a n
H a v e M 1 T a k e
1 1
1 1
D e p a r t m e n t A d v a n c e
M
C a n C a n
H a v e H a v e
1 1
A l l o w a n c e s D e d u c t i o n
C u t
M M A m t
C a t e
g a r y
C a n M M
H a v e
M o n t h l y S a l a r y
L e a v e
D e t a i l S a l a r y S t a t e m e n t
L e a v e A c c o u n t
t e g C a a r ty e g a r 1 y . 0
C a 1 . 1
D e t a i lP r o c e s s i n g P r o c e s s i n g
L e a v e L D e e a t va e i l o f o f
S a l a r yS a l a r y A l l o w a n c e s
D e t a i l i n f o r m Ia n t if oo nr m c a a t il oc un l a t i o n
O v e r T i m e
O v e r t i m e
D e t a i l
P r e s e n t D e t a i l
P r e s e n t D e t a i l
G r o s s S a l a r y
A d v a n c e 1 . 2
A d v a n c e
D e t a i l P r o c e s sG i n r go s s S a l 1 a . r3 y
o f N e t
D e d u c t i o n s S a l a r y
L o a n D c e a t al c i ul l a t i o n
L o a n
E m p l o y e e
R e p o r t s
D e d u c t i o n
S a l a r y S t a t m e
D e d u c t i o n o r
R e p o r t s
2 . 0
C a
t e g a r y
C a t e g a r y P r o c e s s i n g
D e t a i l O f O v e r t i m
S a l a r y D e t a i l
i n f o r m a t i o n
D e p a r m e n t
D e p a r t m e n t
D e t a i l
O v e r t i m
E m p l o y e e
P r e s e n t s
P r e s e n t s D e
2 . 1
T A P r o c e s s i n g
T r a v e l l i i nn f g o r m a t i o n o f
A l l o w a n c e s A l l o w a n c e s
c a l c u l a t i o n
H R A
i n f o r m a t i o n M e d i c a l
H R A
M e d i c a l
i n f o r m a t i o n
G r o s s S a l a r y
2 . 2 G r o s s S a l
P r o c e s s i n g
o f
D e d u c t i o n s
c a l c u l a t i o n
A d v a n c e L o a n
D e t a i l D e t a i l
2 . 2
. 0 2 . 2 . 1
A d v a n c e L o a n
D e t a i l D e t a i l
E m p l o y e e L o a n
A d v a n c e M a s t e Lr o a n
D e t a i l T r a n s e c t i o
D e t a i l
A d v a n c e L o a n _ M a s t
L o a n _ T
CONTROL PREFIX
8.TESTING
• Testing plan is one of the modules of the system analysis and the design, which has
greater importance. After system is ready it should go for testing. Testing is one of the
critical phases. The system Developer has to undergo and which one should not avoid
before final system implementation.
• If testing is conducted successfully, it will never cover errors in the software.
Secondly, testing demonstrates that software functions appear to be working according to
specification and that performance requirements appear to have been met. In addition,
data collected as testing is conducted provides a good indication of software reliability
and some indication of software quality as a whole. But there is one thing that testing
cannot do:
• Testing cannot show the absence of defects, it can only show that software errors
are present. Testing should be planned before testing begins. Test planning can begin as
soon as the coding phase is complete.
• During system testing the system is used experimentally to ensure that software
does not fail special test data are input and result examined and likewise corrections are
done.
• Unit Testing
• Integration Testing
• System Testing
• Acceptance Testing
Unit Testing
Integration
Testing
System Testing
Acceptance
Testing
• In Unit Testing, we tested individual components like each controls for their
validations to ensure that they operate correctly.
• The next level is called Integration Testing. In this many unit tested modules are
combined into subsystems, which are then tested. The goal here is to see if the
modules can be integrated properly. This testing activity can be considered testing the
design.
• In System Testing, we tested whether system elements have been properly integrated
and perform allocated functions to detect the errors that may result from unanticipated
interactions between sub-system and system components.
In this employee management system I have used unit testing & integration Testing
TEST CASES:
If it is checked already
Checks remember my name
directly jump to password Checked and OK
Check box
page.
Selects any previously taken Restore the database to the Checked and OK
Backup from log original path
9.IMPLEMENTATION
When a new system needs to be implemented in an organization, there are three different
ways to adopt this new system: The big bang adoption, phased adoption and parallel
adoption.
• Parallel adoption: The old and the new system are running parallel, so all the
users can get used to the new system, and meanwhile do their work using the old
system.
• Phased adoption :The adoption will happen in several phases, so after each phase
the system is a little nearer to be fully adopted.
• Big bang adoption: The switch between using the old system and using the new
system happens at one single date, the so called instant changeover of the system.
Everybody starts to use the new system at the same date and the old system will
not be used anymore from that moment on.
Since our system is completely independent from the existing system and makes no
use of the existing system, the implementation method used is the Big Bang Adoption.
User documentation does not need to be updated during the implementation process,
because it happens in such a short period. There are no special interfaces needed to be
able to get used to the new system, because the new system is all there is.
10.SCOPE OF THE FURTHER ENHANCEMENT
This application can be further enhanced to cover each aspect of the institutes. Employee
management system will be extended towards a complete management package for the
institute. It will really help to manage and organize the employees’ detail very efficiently
and effectively. The application will prove itself as a powerful tool which enhance the
working power of the administration department and can help in improving overall
management of the institute.
The following are some of the important enhancement that can take place into the current
working software application :
1) This includes management of employees salary , leave status and each kind of
financial features which helps the institute as a financial tool.
2) In Our System an Administor easily Modify and Update the any Emplyee’s
information.
3) Easily add new user in database.
ANNEXURE
1. Process: A process done in the system is denoted by this symbol. For example prepare
attendance report, pay slip, etc.
4. Data store: Any store data but with no reference to the physical method of storing.
*
6. Association: It represents the relationship between the entities
Data Flow Diagram: a means of representing a system at any level of detail with a
graphic network of symbols showing data flows, data stores, data processes, and data
sources/destination.
Data Table: the connection between the output of one object or process and The
Input to another.
Function: it describe in the statement of scope are evaluated and in some Cases
refined to provide more detail prior to the beginning of estimation.
Process: something that transfers the data value. It processes input data and generates
Requirement specification: it is the final work product produced by the system and
requirements engineer.
System Design: the first stage of design, during which high-level decisions
are made about the overall structure of the system.
BIBLIOGRAPHY
• VB Black Book
• Mastering VB
• Visual Basic in 21 Days
• SQL/PLSQL - Ivan Bayross
• www.vbtutor.net
• www.google.co.in
• www.wikipedia.com