NANDINI IMPEX PVT.LTD.

CLIENT : M/S EPIL CONSULTANT : M/S EESL


Document No: RANIGANJ DURGAPUR GAS PIPELINE PROJECT
NIPL-EPIL-RDPL- INSPECTION TEST PLAN FOR PNEUMATIC
STN-ITP-07 TESTING
Owner : Essar Oil Limited. Format No. : NIPL-EPIL-RDPL-ITP-07
Consultant : EESL Revision : 0
Client : EPIL
CONTRCTOR: NANDINI IMPEX PVT LTD
Inspection
S.NO Activity Description by Verification by EPIL Records To be Submitted by SEIC
NIPL

1 Approval of Procedure W A Procedure

2 Dewatering W RM : NIPL-EPIL-RDPL-FM-07

3 Leak testing (Flange joints) W W : NIPL-EPIL-RDPL-FM-07

4 Valve passing test W W : NIPL-EPIL-RDPL-FM-07

RM-Random

R-Review documents

W-Witness

0 For Review and Approval


Prepared for Checked by Reviwed by
Rev Date Description NIPL EPIL EPIL Approved by EPIL
NANDINI IMPEX PVT.LTD.
CLIENT : M/S EPIL CONSULTANT : M/S EESL
Document No: RANIGANJ DURGAPUR GAS PIPELINE PROJECT
NIPL-EPIL-RDPL- STN-FM-07 INSPECTION TEST PLAN FOR PNEUMATIC TESTING

INSPECTION REPORT FOR PIPING ERECTION


Owner : Essar Oil Limited. Station no: GGS
Consultant : EESL. Loop No. 1
Contractor : EPIL Report No. 1 PAGE-1
Date. 18/11/2010

S.No Line No. Dia(INCH) Inch. Mtr. ISO NO Remarks


Thk. Length
1 16"-GG-002005-P1 16 9.53 3.01 48.16 1 Pipe
2 16"-GG-002005-P1 16 9.53 1.096 17.54 1 Fitting
3 16"-GG-002005-P1 16 9.53 1.1 17.60 1 IJ
4 2"-GG-002005-P1-D4 2 5.54 0.56 1.12 1 PIPE
5 2''GG002004/P-3 2 5.54 9.905 19.81 3 PIPE
6 2''GG002004/P-3 2 5.54 1.168 2.34 3 Fitting
7 2''SV002103/P-3 2 5.54 3.595 7.19 3 PIPE
8 2''SV002103/P-3 2 5.54 0.256 0.51 3 Fitting
9 2''SV002101/BOIZ 2 5.54 0.2 0.40 1 PIPE
10 2''GG002005/P-1/D-3 2 5.54 0.3 0.60 1 PIPE
11 6''GG002002/P-4 6 7.11 1.895 11.37 4 PIPE
12 6''GG002002/P-4 6 7.11 0.3 1.80 4 Fitting
13 2''GG002002/P-4 2 5.54 1.745 3.49 4 PIPE
14 2''GG002002/P-4 2 5.54 0.152 0.30 4 Fitting
15 6''GG002003/P-4 6 7.11 4.21 25.26 4 PIPE
16 6''GG002003/P-4 6 7.11 0.456 2.74 4 Fitting
17 12''GG002001/P-2 12 8.4 32.32 387.84 2 PIPE
18 12''GG002001/P-2 12 8.4 3.9068 46.88 2 Fitting
19 2''GG002001/P-2/PT-16 2 5.54 0.465 0.93 2 PIPE
20 4''GG002010-BOIZ/P-5 4 6.02 6.72 26.88 5 PIPE
21 4''GG002010-BOIZ/P-5 4 6.02 1.672 6.69 5 Fitting
22 12''GG002032/P-2 12 8.4 3.5 42.00 2 PIPE
23 12''GG002032/P-2 12 8.4 1.042 12.50 2 Fitting
24 2''GG002104/P-6 2 5.54 4.165 8.33 6 PIPE
25 2''GG002104/P-6 2 5.54 0.912 1.82 6 Fitting
26 2''GG002001/P-2/PDT-10 2 5.54 0.46 0.92 2 PIPE
27 2''GG002001/P2/XV-9 2 5.54 0.46 0.92 2 PIPE
28 2''GG002001/P2/PDT-10 2 5.54 0.46 0.92 2 PIPE
29 2''GG002001/P2/PT-11 2 5.54 0.46 0.92 2 PIPE
30 2''GG002001/P2/PSV-3 2 5.54 0.36 0.72 2 PIPE
31 3''SV002102-BOIZ 3 5.59 2.74 8.22 1 PIPE
32 3''SV002102-BOIZ 3 5.59 0.228 0.68 1 Fitting
33 3''SV002104/P-2 3 5.59 2.775 8.33 2 PIPE
34 3''SV002104/P-2 3 5.59 0.228 0.68 2 Fitting
35 2"600#WNRF Flange 2 28 2.04 Nos
36 2"300#WNRF Flange 2 6 0.41 Nos
37 4"300#WNRF Flange 4 8 0.68 Nos
38 6"300#WNRF Flange 6 4 0.39 Nos
39 3"300#WNRF Flange 3 2 0.16 Nos
TOTAL 720.10

CHECKED & VERIFIED BY


For NIPL For EPIL
SIGNED SIGNED
NAME NAME
DATE DATE
NANDINI IMPEX PVT.LTD.
CLIENT : M/S EPIL CONSULTANT : M/S EESL
Document No: RANIGANJ DURGAPUR GAS PIPELINE PROJECT

NIPL-EPIL-RDPL- STN-FM-07 INSPECTION TEST PLAN FOR PNEUMATIC TESTING

INSPECTION REPORT FOR PNEUMATIC TESTING


Owner : Essar Oil Limited. Format No. : NIPL-EPIL- RDPL-FM-07

Consultant : EESL. Revision 0


Contractor : EPIL Report No. 1 PAGE-1

Date. 3/4/2011

Test Pressure: 3 Kg / cm2 Holding Time: 1/2 Hour Station no: CGS
LEAK TEST (FLANGED JOINTS)
Joint between Types of
S.No Line No. Flange size gaskets Observation ISO NO
Joint no Joint no provided

1 16"-GG-002005/P-1 16" - 1 Spiral wound Satisfactory CGS/PIPING - 01

2 4"-GG-002005/P-1/D1 4" - 7 Spiral wound Satisfactory CGS/PIPING - 01

3 4"-GG-002005/P-1/D1 4'' 9- - Spiral wound Satisfactory CGS/PIPING - 01

4 4"-GG-002005/P-1/D2 4'' - 10 Spiral wound Satisfactory CGS/PIPING - 01

5 4"-GG-002005/P-1/D2 4'' 12 - - Spiral wound Satisfactory CGS/PIPING - 01

6 2''GG002005/P-1/D-3 2'' - 13 Spiral wound Satisfactory CGS/PIPING - 01

7 2''SV002106-BOIZ 2'' - 22 Spiral wound Satisfactory CGS/PIPING - 01


8 2''SV002106-BOIZ 2'' 25- - Spiral wound Satisfactory CGS/PIPING - 01

VALVE PASSING TEST


Observation
S.No Line No. Valve size Valve type Valve Sl.No/ Tag no Open Closed Remarks
condition condition
1 2''GG002005/P-1/D-3 2'' BALL D105151/13 Satisfactory Satisfactory CGS/PIPING - 01

2 2''SV002106-BOIZ 2'' BALL D105151/10 Satisfactory Satisfactory CGS/PIPING - 01

3 2''SV002106-BOIZ 2'' PSV 1308/2010 Satisfactory Satisfactory CGS/PIPING - 01

4 2''GG002019-BO1Z 2" BALL D105151/27 Satisfactory Satisfactory CGS/PIPING - 03

5 2''GG002019-BO1Z 2" GLOBE C23538 C23533 Satisfactory Satisfactory CGS/PIPING - 03


6 2''SV002108-BOIZ 2'' BALL D105152/7 D105152/18 Satisfactory Satisfactory CGS/PIPING - 03

7 2''SV002108-BOIZ 2'' GLOBE C23536 Satisfactory Satisfactory CGS/PIPING - 03

8 16''GG002005/P-1 16'' BALL D105160/3 Satisfactory Satisfactory CGS/PIPING - 01

9 2''GG002005/P-1/D-4 2'' BALL D105151/17 Satisfactory Satisfactory CGS/PIPING - 01


10 4''GG002005/P-1/D-1 4'' GLOBE D10646 Satisfactory Satisfactory CGS/PIPING - 01

CHECKED & VERIFIED BY

For NIPL For EPIL

SIGNED SIGNED

NAME NAME

DATE DATE
NANDINI IMPEX PVT.LTD.
CLIENT : M/S EPIL CONSULTANT : M/S EESL
Document No: RANIGANJ DURGAPUR GAS PIPELINE PROJECT

NIPL-EPIL-RDPL- STN-FM-07 INSPECTION TEST PLAN FOR PNEUMATIC TESTING

Owner : Essar Oil Limited. Format No. : NIPL-EPIL- RDPL-FM-07

Consultant : EESL. Revision.--------- 0


Contractor : EPIL Report No.------- 1 PAGE-2
Date.-------------- 3/4/2011
Test Pressure: 3 Kg / cm2 Holding Time: 1/2 Hour Station no: -------- CGS
LEAK TEST (FLANGED JOINTS)
Joint between Types of
S.No Line No. Flange size gaskets Observation ISO NO
Joint no Joint no provided

1 2"-GG-002019-BO1Z 2 29 30 S/WOUND CGS/PIPING - 03


2 2"-GG-002019-BO1Z 2 22- - S/WOUND CGS/PIPING - 03
3 2"-GG-002019-BO1Z 2 17 18 S/WOUND CGS/PIPING - 03
4 2"-GG-002019-BO1Z 2 1 - S/WOUND CGS/PIPING - 03
5 2"-GG-002019-BO1Z 2 3 4 S/WOUND CGS/PIPING - 03
6 2"-GG-002019-BO1Z 2 8 - S/WOUND CGS/PIPING - 03
7 2"-GG-002019-BO1Z 2 10 - S/WOUND CGS/PIPING - 03
8 2"-SV-002108-BO1Z 2 - 11 S/WOUND CGS/PIPING - 03
9 6"-GG-002017-BO1Z 6 - 25 S/WOUND CGS/PIPING - 04
10 6"-GG-002017-BO1Z 6 22 - S/WOUND CGS/PIPING - 04
VALVE PASSING TEST
Observation
S.No Line No. Valve size Valve type Valve Tag no Remarks
Open Closed
condition condition
1 4''GG002005/P-1/D2 4'' GLOBE C23816 Satisfactory Satisfactory CGS/PIPING - 01

2 16''GG002016-BO1Z-1 16'' BALL D105163/1 Satisfactory Satisfactory CGS/PIPING - 02

3 2''GG002016/PT24 2'' BALL D105151/12 Satisfactory Satisfactory CGS/PIPING - 02

4 2''GG002016/PT30 2" BALL D105151/18 Satisfactory Satisfactory CGS/PIPING - 02


5 2''GG002016/PDT31 2" BALL D105151/16 Satisfactory Satisfactory CGS/PIPING - 02
6 2''GG002016/XV25 2'' BALL D105151/15 Satisfactory Satisfactory CGS/PIPING - 02
7 2''GG002016/PDT31 2'' BALL D105151/14 Satisfactory Satisfactory CGS/PIPING - 02
8 2''GG002016/PT32 2'' BALL D105151/11 Satisfactory Satisfactory CGS/PIPING - 02

9 6''GG002002-BO1Z 6'' BALL D105156/1,D105155/1 Satisfactory Satisfactory CGS/PIPING - 04


10 6''GG002017-BO1Z 6'' BALL D105156/2 Satisfactory Satisfactory CGS/PIPING - 04

CHECKED & VERIFIED BY

For NIPL For EPIL

SIGNED SIGNED

NAME NAME

DATE DATE
NANDINI IMPEX PVT.LTD.
CLIENT : M/S EPIL CONSULTANT : M/S EESL
Document No: RANIGANJ DURGAPUR GAS PIPELINE PROJECT

NIPL-EPIL-RDPL- STN-FM-07 INSPECTION TEST PLAN FOR PNEUMATIC TESTING

Owner : Essar Oil Limited. Format No. : NIPL-EPIL- RDPL-FM-07

Consultant : EESL. Revision.--------- 0


Contractor : EPIL Report No.------- 1 PAGE-3
Date.-------------- 3/4/2011
Test Pressure: 3 Kg / cm2 Holding Time:- 1/2 Hour Station no: -------- CGS
LEAK TEST (FLANGED JOINTS)
Joint between Types of
S.No Line No. Flange size gaskets Observation ISO NO
Joint no Joint no provided

1 6"-GG-002002-BO1Z 6 21 - Spiral wound Satisfactory CGS/PIPING - 04


2 6"-GG-002002-BO1Z 6 19 - Spiral wound Satisfactory CGS/PIPING - 04
3 4''-GG-002021-BO1Z 4 21 - Spiral wound Satisfactory CGS/PIPING -05
4 4''-GG-002022-BO1Z 4 - 22 Spiral wound Satisfactory CGS/PIPING -05
5 12"-GG-002020-BO1Z-1 12 5 6 Spiral wound Satisfactory CGS/PIPING -06
6 12"-GG-002020-BO1Z-1 12 12 - Spiral wound Satisfactory CGS/PIPING -06
7 12"-GG-002020-BO1Z-1 12 - 13 Spiral wound Satisfactory CGS/PIPING -06
8 12"-GG-002020-BO1Z-1 12 19 20 Spiral wound Satisfactory CGS/PIPING -06
9 2"-SV-02109-BO1Z 2 60 - Spiral wound Satisfactory CGS/PIPING -06
10 2"-SV-02109-BO1Z 2 62 - Spiral wound Satisfactory CGS/PIPING -06
11 2"-SV-02103-BO1Z 2 - 37 Spiral wound Satisfactory CGS/PIPING-06
12 2"-SV-02103-BO1Z 2 42 - Spiral wound Satisfactory CGS/PIPING-06
13 2"-SV-02109-BO1Z 2 43 - Spiral wound Satisfactory CGS/PIPING-06
14 2"-SV-02109-BO1Z 2 - 46 Spiral wound Satisfactory CGS/PIPING-06
15 2"-SV-02109-BO1Z 2 48 49 Spiral wound Satisfactory CGS/PIPING-06
16 12''GG002020-BO1Z-1 12 - 6 Spiral wound Satisfactory CGS/PIPING-07
17 12''GG002020-BO1Z-1 12 10 13 Spiral wound Satisfactory CGS/PIPING-07
18 12''GG002020-BO1Z-1 12 - 21 Spiral wound Satisfactory CGS/PIPING-07
19 12''GG002020-BO1Z-1 12 30 - Spiral wound Satisfactory CGS/PIPING-07
VALVE PASSING TEST
Observation
S.No Line No. Valve size Valve type Valve Tag no Open Closed Remarks
condition condition
D105153/5
1 4''GG002021-BO1Z 4'' BALL D105153/2/D105153/6 Satisfactory Satisfactory ISO NO 05

2 4''GG002021-BO1Z 4'' GLOBE D01650 Satisfactory Satisfactory ISO NO 05

3 4''GG002022-BO1Z 4'' GLOBE D01650 Satisfactory Satisfactory ISO NO 05

CHECKED & VERIFIED BY

For NIPL For EPIL

SIGNED SIGNED

NAME NAME

DATE DATE
NANDINI IMPEX PVT.LTD.
CLIENT : M/S EPIL CONSULTANT : M/S EESL
Document No: RANIGANJ DURGAPUR GAS PIPELINE PROJECT
NIPL-EPIL-RDPL- STN-FM-07 INSPECTION TEST PLAN FOR PNEUMATIC TESTING

INSPECTION REPORT FOR PNEUMATIC TESTING


Owner : Essar Oil Limited. Format No. : NIPL-EPIL- RDPL-FM-07
Consultant : EESL. Revision 0
Contractor : EPIL Report No. 1 PAGE-4
Date. 3/4/2011
Test Pressure: --3 Kg / cm2 Holding Time:---1/2 Hour Station no: -------- CGS
LEAK TEST (FLANGED JOINTS)
Joint between Types of
S.No Line No. Flange size gaskets Observation ISO NO
Joint no Joint no provided

VALVE PASSING TEST


Observation
S.No Line No. Valve size Valve type Valve Tag no Open Closed Remarks
condition condition
1 12"-GG-002006-BO1Z-1 12 BALL D 1052C8/1 Satisfactory Satisfactory ISO NO-6

2 12'-GG-002020-BO1Z-1 12 BALL D1052C9/2,D1052C9/1 Satisfactory Satisfactory ISO NO-6


3 2'-GG-002020-BO1Z-1-PDT20 2 BALL D1052C3/21 Satisfactory Satisfactory ISO NO-6
4 2'-GG-002020-BO1Z-1-PDT20 2 BALL D1052C3/29 Satisfactory Satisfactory ISO NO-6
5 2'-GG-002020-BO1Z-1-AE 2 BALL D1052C3/27 Satisfactory Satisfactory ISO NO-6
D1052C4/33,D1052C4/
26,D1052C4/31,D1052 ISO NO-6
6 2"SV-002109-BO1Z 2 BALL C4/28 Satisfactory Satisfactory
7 2"SV-002103-BO1Z 2 BALL D1052C3/26 Satisfactory Satisfactory ISO NO-6
8 2"SV-002103-BO1Z 2 PSV 1306/2010 Satisfactory Satisfactory ISO NO-6

D1052C8/6,D105157/1,
D1052C8/5,D1052C8/3 ISO NO- 7
9 12"-GG-002020-BO1Z-1 12 BALL ,D105157/2 Satisfactory Satisfactory

ISO NO-7
10 2"-GG-002020-BO1Z-1-7 2 BALL D1052C3/30 Satisfactory Satisfactory

CHECKED & VERIFIED BY


For NIPL For EPIL

SIGNED SIGNED

NAME NAME

DATE DATE
NANDINI IMPEX PVT.LTD.
CLIENT : M/S EPIL CONSULTANT : M/S EESL
Document No: RANIGANJ DURGAPUR GAS PIPELINE PROJECT
NIPL-EPIL-RDPL- STN-FM-07 INSPECTION TEST PLAN FOR PNEUMATIC TESTING

INSPECTION REPORT FOR PNEUMATIC TESTING


Owner : Essar Oil Limited. Format No. : NIPL-EPIL- RDPL-FM-07
Consultant : EESL. Revision 0
Contractor : EPIL Report No. 1 PAGE-5
Date. 3/4/2011
Test Pressure: --3 Kg / cm2 Holding Time:---1/2 Hour Station no: -------- CGS
LEAK TEST (FLANGED JOINTS)
Joint between Types of
S.No Line No. Flange size gaskets Observation ISO NO
Joint no Joint no provided

VALVE PASSING TEST


Observation
S.No Line No. Valve size Valve type Valve Tag no Open Closed Remarks
condition condition
D1052C8/6,D105157/1,
D1052C8/5,D1052C8/3 ISO NO- 7
1 12"-GG-002020-BO1Z-1 12 BALL ,D105157/2 Satisfactory Satisfactory
2 2"-GG-002020-BO1Z-1-7 2 BALL D1052C3/30 Satisfactory Satisfactory ISO NO-7
3
4
5
6
7
8
9
10

CHECKED & VERIFIED BY


For NIPL For EPIL
SIGNED SIGNED
NAME NAME
DATE DATE

NANDINI IMPEX PVT.LTD.


CLIENT : M/S EPIL CONSULTANT : M/S EESL
Document No: RANIGANJ DURGAPUR GAS PIPELINE PROJECT
NIPL-EPIL-RDPL- STN-FM-07 INSPECTION TEST PLAN FOR PNEUMATIC TESTING

INSPECTION REPORT FOR PNEUMATIC TESTING


Owner : Essar Oil Limited. Format No. : NIPL-EPIL- RDPL-FM-07
Consultant : EESL. Revision 0
Contractor : EPIL Report No. 1 PAGE-4
Date. 17/12/10
Test Pressure: --3 Kg / cm2 Holding Time:---1/2 Hour Station no: -------- GGS
LEAK TEST (FLANGED JOINTS)
Joint between
Types of
Types of
S.No Line No. Flange size gaskets Observation ISO NO
Joint no Joint no provided

1 6''GG002002/P-4 6'' 19 - Spiral wound Satisfactory GGS/PIPING - 04


2 6''GG002002/P-4 6'' 21 22 Spiral wound Satisfactory GGS/PIPING - 04
3 6''GG002003/P-4 6'' - 25 Spiral wound Satisfactory GGS/PIPING - 04
4 4''GG002010-BOIZ/P-5 4'' 9 10 Spiral wound Satisfactory GGS/PIPING - 05
5 4''GG002010-BOIZ/P-5 4'' 21 22 Spiral wound Satisfactory GGS/PIPING - 05
6 2''GG002104/P-6 2'' - 7- Spiral wound Satisfactory GGS/PIPING - 06
7 2''GG002104/P-6 2'' 14 15 Spiral wound Satisfactory GGS/PIPING - 06
8
9
10
VALVE PASSING TEST
Observation
S.No Line No. Valve size Valve type Valve Tag no Open Closed Remarks
condition condition

CHECKED & VERIFIED BY


For NIPL For EPIL
SIGNED SIGNED
NAME NAME
DATE DATE

NANDINI IMPEX PVT.LTD.


CLIENT : M/S EPIL CONSULTANT : M/S EESL
Document No: RANIGANJ DURGAPUR GAS PIPELINE PROJECT
NIPL-EPIL-RDPL- STN-FM-07 INSPECTION TEST PLAN FOR PNEUMATIC TESTING

INSPECTION REPORT FOR PIPING ERECTION


Owner : Essar Oil Limited. Station no: GGS
Consultant : EESL. Loop No. 1
Contractor : EPIL Report No. 1 PAGE-1
Date. 18/11/2010

S.No Line No. Dia(INCH) Inch. Mtr. ISO NO Remarks


Thk. Length
1 16"-GG-002005-P1 16 9.53 3.01 48.16 1 Pipe
2 16"-GG-002005-P1 16 9.53 1.096 17.54 1 Fitting
3 16"-GG-002005-P1 16 9.53 1.1 17.60 1 IJ
4 2"-GG-002005-P1-D4 2 5.54 0.56 1.12 1 PIPE
5 2''GG002004/P-3 2 5.54 9.905 19.81 3 PIPE
6 2''GG002004/P-3 2 5.54 1.168 2.34 3 Fitting
7 2''SV002103/P-3 2 5.54 3.595 7.19 3 PIPE
8 2''SV002103/P-3 2 5.54 0.256 0.51 3 Fitting
9 2''SV002101/BOIZ 2 5.54 0.2 0.40 1 PIPE
10 2''GG002005/P-1/D-3 2 5.54 0.3 0.60 1 PIPE
11 6''GG002002/P-4 6 7.11 1.895 11.37 4 PIPE
12 6''GG002002/P-4 6 7.11 0.3 1.80 4 Fitting
13 2''GG002002/P-4 2 5.54 1.745 3.49 4 PIPE
14 2''GG002002/P-4 2 5.54 0.152 0.30 4 Fitting
15 6''GG002003/P-4 6 7.11 4.21 25.26 4 PIPE
16 6''GG002003/P-4 6 7.11 0.456 2.74 4 Fitting
17 12''GG002001/P-2 12 8.4 32.32 387.84 2 PIPE
18 12''GG002001/P-2 12 8.4 3.9068 46.88 2 Fitting
19 2''GG002001/P-2/PT-16 2 5.54 0.465 0.93 2 PIPE
20 4''GG002010-BOIZ/P-5 4 6.02 6.72 26.88 5 PIPE
21 4''GG002010-BOIZ/P-5 4 6.02 1.672 6.69 5 Fitting
22 12''GG002032/P-2 12 8.4 3.5 42.00 2 PIPE
23 12''GG002032/P-2 12 8.4 1.042 12.50 2 Fitting
24 2''GG002104/P-6 2 5.54 4.165 8.33 6 PIPE
25 2''GG002104/P-6 2 5.54 0.912 1.82 6 Fitting
26 2''GG002001/P-2/PDT-10 2 5.54 0.46 0.92 2 PIPE
27 2''GG002001/P2/XV-9 2 5.54 0.46 0.92 2 PIPE
28 2''GG002001/P2/PDT-10 2 5.54 0.46 0.92 2 PIPE
29 2''GG002001/P2/PT-11 2 5.54 0.46 0.92 2 PIPE
30 2''GG002001/P2/PSV-3 2 5.54 0.36 0.72 2 PIPE
31 3''SV002102-BOIZ 3 5.59 2.74 8.22 1 PIPE
32 3''SV002102-BOIZ 3 5.59 0.228 0.68 1 Fitting
33 3''SV002104/P-2 3 5.59 2.775 8.33 2 PIPE
34 3''SV002104/P-2 3 5.59 0.228 0.68 2 Fitting
35 2"600#WNRF Flange 2 28 2.04 Nos
36 2"300#WNRF Flange 2 6 0.41 Nos
37 4"300#WNRF Flange 4 8 0.68 Nos
38 6"300#WNRF Flange 6 4 0.39 Nos
39 3"300#WNRF Flange 3 2 0.16 Nos
TOTAL 720.10

CHECKED & VERIFIED BY


For NIPL For EPIL
SIGNED SIGNED
NAME NAME
DATE DATE
NANDINI IMPEX PVT.LTD.
CLIENT : M/S EPIL CONSULTANT : M/S EESL
Document No: RANIGANJ DURGAPUR GAS PIPELINE PROJECT

NIPL-EPIL-RDPL- STN-FM-07 INSPECTION TEST PLAN FOR PNEUMATIC TESTING

INSPECTION REPORT FOR PNEUMATIC TESTING


Owner : Essar Oil Limited. Format No. : NIPL-EPIL- RDPL-FM-07

Consultant : EESL. Revision 0


Contractor : EPIL Report No. 1 PAGE-1

Date. 17/12/10

Test Pressure: --3 Kg / cm2 Holding Time:---1/2 Hour Station no: -------- GGS
LEAK TEST (FLANGED JOINTS)
Joint between Types of
S.No Line No. Flange size gaskets Observation Remarks
Joint no Joint no provided

1 16"-GG-002005-API 5L-X65 16" 1 6 Spiral wound Satisfactory

2 4"-GG-002005-D1 & 2 4" 7 12 Spiral wound Satisfactory

3 2"-GG-002005-D3 & D4 2" 13 29 Spiral wound Satisfactory


4 2"-SV-002101-BO1Z 2" 30 33 Spiral wound Satisfactory

5 3"-SV-002102-BO1Z 3" 34 38 Spiral wound Satisfactory

6 12"-GG-002032-BO1Z 12" 5 10 Spiral wound Satisfactory

7 12"-GG-002001-BO1Z 12" 1 25 Spiral wound Satisfactory


8 2"-GG-002001-P2-PSV3 2" 26 30 Spiral wound Satisfactory

9 3"-SV-002104-BO1Z 3" 31 35 Spiral wound Satisfactory

VALVE PASSING TEST


Observation
S.No Line No. Valve size Valve type Valve Tag no Open Closed Remarks
condition condition
1 16"-GG-002005-API 5L-X65 16" BALL D105160/2 Satisfactory Satisfactory

2 4"-GG-002005-D1 & 2 4" BALL 2CS/2,2CS/3 Satisfactory Satisfactory

3 4"-GG-002005-D1 & 2 4" GLOBE D01651, D01649 Satisfactory Satisfactory


D105151/2
4 2"-GG-002005-D3 & D4 2" BALL D105151/3 Satisfactory Satisfactory

5 2"-SV-002101-BO1Z 2" BALL D105151/34 Satisfactory Satisfactory

6 12"-GG-002032-BO1Z 12" BALL D1052C8/2 Satisfactory Satisfactory


7 12"-GG-002001-BO1Z 12" BALL D105159/1 Satisfactory Satisfactory

8 12"-GG-002001-BO1Z 12" NRV C24875 Satisfactory Satisfactory

9 12"-GG-002001-BO1Z 12" PCV XV9 Satisfactory Satisfactory

10 2"-GG-002001-P2-PSV3 2" BALL D105151/30 Satisfactory Satisfactory

CHECKED & VERIFIED BY

For NIPL For EPIL

SIGNED SIGNED

NAME NAME

DATE DATE
NANDINI IMPEX PVT.LTD.
CLIENT : M/S EPIL CONSULTANT : M/S EESL
Document No: RANIGANJ DURGAPUR GAS PIPELINE PROJECT

NIPL-EPIL-RDPL- STN-FM-07 INSPECTION TEST PLAN FOR PNEUMATIC TESTING

Owner : Essar Oil Limited. Format No. : NIPL-EPIL- RDPL-FM-07

Consultant : EESL. Revision.--------- 0


Contractor : EPIL Report No.------- 1 PAGE-2
Date.-------------- 17/12/10
Test Pressure: --3 Kg / cm2 Holding Time:---1/2 Hour Station no: -------- GGS
LEAK TEST (FLANGED JOINTS)
Joint between Types of
S.No Line No. Flange size gaskets Observation Remarks
Joint no Joint no provided

1 2"-GG-002001-PT16 2" 36 45 Spiral wound Satisfactory


2 2"-GG-002001-PT11 2" 46 54 Spiral wound Satisfactory
3 2"-GG-002001-XV9 2" 55 61 Spiral wound Satisfactory
4 2"-GG-002001-PDT10 2" 62 79 Spiral wound Satisfactory
5 2"-GG-002004-BO1Z 2" 1 38 Spiral wound Satisfactory
6 2"-GG-002103-BO1Z 2" 11 15 Spiral wound Satisfactory
7 6"-GG-002002-BO1Z 6" 1 21 Spiral wound Satisfactory
8 6"-GG-002003-BO1Z 6" 22 25 Spiral wound Satisfactory
9 2"-GG-002002-BO1Z 2" 7 16 Spiral wound Satisfactory

VALVE PASSING TEST


Observation
S.No Line No. Valve size Valve type Valve Tag no Remarks
Open Closed
condition condition
1 2"-GG-002001-PT16 2" BALL D105151/33 Satisfactory Satisfactory

2 2"-GG-002001-PT11 2" BALL D105151/28 Satisfactory Satisfactory

3 2"-GG-002001-XV9 2" BALL D105151/35,D105152/3 Satisfactory Satisfactory


D105151/29,D105151/32
4 2"-GG-002001-PDT10 2" BALL D105152/1,D105152/2 Satisfactory Satisfactory
5 2"-GG-002004-BO1Z 2" BALL/GLOBE D105151/3,C23542 Satisfactory Satisfactory
6 2"-GG-002103-BO1Z 2" GLOBE C23543 Satisfactory Satisfactory
7 6"-GG-002002-BO1Z 6" BALL D151155/2,D151156/3 Satisfactory Satisfactory
8 6"-GG-002003-BO1Z 6" BALL D151156/4 Satisfactory Satisfactory
9 2"-GG-002002-BO1Z 2" BALL D105151/6 Satisfactory Satisfactory

CHECKED & VERIFIED BY

For NIPL For EPIL

SIGNED SIGNED

NAME NAME

DATE DATE
NANDINI IMPEX PVT.LTD.
CLIENT : M/S EPIL CONSULTANT : M/S EESL
Document No: RANIGANJ DURGAPUR GAS PIPELINE PROJECT

NIPL-EPIL-RDPL- STN-FM-07 INSPECTION TEST PLAN FOR PNEUMATIC TESTING

Owner : Essar Oil Limited. Format No. : NIPL-EPIL- RDPL-FM-07

Consultant : EESL. Revision.--------- 0


Contractor : EPIL Report No.------- 1 PAGE-3
Date.-------------- 17/12/10
Test Pressure: --3 Kg / cm2 Holding Time:---1/2 Hour Station no: -------- GGS
LEAK TEST (FLANGED JOINTS)
Joint between Types of
S.No Line No. Flange size gaskets Observation Remarks
Joint no Joint no provided

1 4"-GG-002008-BO1Z 4" 22 26 Spiral wound Satisfactory


2 4"-GG-002010-BO1Z 4" 1 21 Spiral wound Satisfactory
3 2"-GG-002104-BO1Z 2" 1 23 Spiral wound Satisfactory

VALVE PASSING TEST


Observation
S.No Line No. Valve size Valve type Valve Tag no Open Closed Remarks
condition condition

1 4"-GG-002010-BO1Z 4" BALL Satisfactory Satisfactory

2 4"-GG-002010-BO1Z 4" GLOBE C23817,C23810 Satisfactory Satisfactory

3 2"-GG-2104-BO1Z 2" GLOBE C23537 Satisfactory Satisfactory

9 2"-GG-002002-BO1Z 2" BALL D105151/6 Satisfactory Satisfactory

CHECKED & VERIFIED BY

For NIPL For EPIL

SIGNED SIGNED
NAME NAME

DATE DATE
NANDINI IMPEX PVT.LTD.
16 12''GG002020-BO1Z-1 12 - 6 Spiral wound Satisfactory CGS/PIPING-07
17 12''GG002020-BO1Z-1 12 10 13 Spiral wound Satisfactory CGS/PIPING-07
18 12''GG002020-BO1Z-1 12 - 21 Spiral wound Satisfactory CGS/PIPING-07
19 12''GG002020-BO1Z-1 12 30 - Spiral wound Satisfactory CGS/PIPING-07

D1052C8/6,D105157/1,
D1052C8/5,D1052C8/3 ISO NO- 7
9 12"-GG-002020-BO1Z-1 12 BALL ,D105157/2 Satisfactory Satisfactory

ISO NO-7
10 2"-GG-002020-BO1Z-1-7 2 BALL D1052C3/30 Satisfactory Satisfactory

D1052C8/6,D105157/1,
D1052C8/5,D1052C8/3 ISO NO- 7
1 12"-GG-002020-BO1Z-1 12 BALL ,D105157/2 Satisfactory Satisfactory
2 2"-GG-002020-BO1Z-1-7 2 BALL D1052C3/30 Satisfactory Satisfactory ISO NO-7