4th Annual Strategic Asset
Management for Power Plants

Assessing Boiler Performance


&
The Main Areas
for Energy Conservation

2
how do we reduce costs while increasing efficiency and productivity?

we will highlight and discuss practical methods


to aid in streamlining inspection and repair practices

3
the asset managers are left holding the bag

maintenance philosophy changes


& the good old days
4
increase electrical output without increasing fuel burn

component replacement

proper maintenance

performance improvements

5
reactive replacement

a reaction to unexpected component failures

6
replace worn or aging components that are expected
to fail in the future or whose performance is deteriorating

predictive replacement

7
environmental impact plays a greater role than equipment reliability and
in some cases safety

8
What we give… investment

TS
FI
availability performance

NE
improvements pertaining

BE
to existing units
funds are being allocated for
pollutant controls
S

renewable fuel
ST

source research
CO

while….
less money
is being allocated towards
maintaining
the actual equipment
What we get… returns currently energizing
our nation

Return on investment… worth


9
our nations craze for alternative energy
sources and
fuels has depleted our efforts to work towards

operating our existing equipment and


fuels to their cleanest,
fullest potential

10
the key is to
practice
maintenance
procedures that
allow us to operate
reliably while
controlling
pollutants
11
AVAILABILITY,
RELIABILITY, AND
SUSTAINABILITY IN A
DOWN ECONOMY
12
paradigm shift
 availability has taken a back seat to
environmental, safety and economic
considerations
 decisions made now can have a
substantial impact on our systems
sustainability for decades to come

13
how do we accomplish these
goals when we have fewer
resources available

14
discovery inspections
* discovery inspections followed by prioritization and
execution of remediation have proven to be effective

* unfortunately in tough times some choose to cut the legs out from
under the discovery inspection portion of the program and expect a
positive outcome

* if we restrict our ability to gather information how can


we make good decisions on where best to put our limited
resources …maintaining a vigorous and robust discovery
inspection regime will provide our decision makers with
a full picture of the condition of the asset

15
Data Driven
Planning
16
"Cost-based“ VS "Value-based“

17
“Cost-based” approach relies on
available budget

can we afford it?

18
“Value-based” involves strategic
decision-making

19
choice of corrective
/preemptive action
permanent VS temporary

20
Problem Definition

Multidiscipline Approach

Permanent Engineered Solutions

21
22

Operations
personnel
play a key
role in hea
rate and em t
issions
improvem
ent and
reliability a
t facilities
PERSONNEL
TRAINING REGIMES OF

practical advice for avoiding problems


23
Safety:
Safety training is critical where working with
heavy equipment, hazardous chemicals, repetitive
activities, etc., but can also be useful with practical
advice for avoiding problems.

24
25

* Certification *
industry standards
of qualification
insure the quality
of the inspection
outcome
Utilization of supplemental Boiler
Inspection Team Members

26
Intra Company

Contracted Professionals
27
outage management

• cost
control

• maintain
repair
budget

28
inspections beyond availability

29
COAL YARD TO THE STACK

treating the system as a whole we can achieve far more constructive results

30
Coal Coal Mills

Furnace Coal Burner

Air heater Fly Ash and Flue Gas Conditioning   

Sulfur Trioxide and Ammonia Conditioning Systems

Water Injection

maintenance & operational

challenges & factors


31
streamline the inspection and
repair process
organization and execution of
these procedures and practices
is the key
Plan
Organize
Execute
Follow up
32
The concept of TEAM (Together Everyone Achieves More) rings out when
we talk about total plant optimization