Sie sind auf Seite 1von 2

LT SECTION –I

6.6 KV / 415 V Tr. # 1 ( HT ASG SEC-1B )


PANEL NO: FEEDER
1A JET PUMP
1B ECR UPS SUPPLY
1C FIRE FIGHTING PUMP 1&2
2B PCM PUMP #3 SUPPLY
3A TG # 3 G.V MCC MAIN SUPPLY
3B BOILER # 3 MCC RESURVE SUPPLY
3C MSG COMPRESSOR SOURCE -3
4A TG#3 AUX MCC RESERVE SUPPLY
4B 110 V ACDB # 3
4C LSHS PUMP HOUSE SOURCE-1 (PUMP NO:1)
5A EOT CRANE
5C TG # 1 S.E.E
6A UCR AC NO:1 &2
8B VENTILATION MCC MAIN SOURCE
9C REPAIR SHOP FEEDER
10A 110 V AC DB NO:1 (BMS # 1)
10B TG # 1 G.V MCC MAIN SUPPLY
10C BOILER # 1 SOOT BLOWER MCC MAIN SUPPLY
11A CENTRIFUSE IA & 1B
11B TG #1 AUX.MCC MAIN SUPPLY
11C LPDA MCC MAIN SUPPLY
12A KELTRON SUPPLY FEEDER # 1
12B OLTC 50MVA TRANSFORMER NO: 1
12C 60 V BATTERY CHARGER ( AT ECR )
13A MWBP NO :1
13B TG # 1 AOP
14A CEP # 1A
15B MSG COMPRESSOR FEEDER # 1
15C BOILER # 1 MCC MAIN SUPPLY

Power Systems Department


Bhilai Steel Plant

Date: 10-12-10
Time07.30hrs
To
The Station Engineer
PP2, NSPCL

Sub: Request for Backing-down of Generation to 65MW


Dear Sir,

The following Shops is under Repair for the period indicated on (date) 10-12-10.____

Sl.No.ShopReason
1 SP-3CAPITAL REP.
2BF-7CAPITAL REP.

Due to this, our power demand will be reduced by 10MW during that period.

You are therefore requested to back down the generation at PP-2 and limit the generation to _65MW during the period 07.30hrs 10/12/10 to 14.00hrs
(10/12/10)

Thanking you,

Name: A Mondal
Shift Manager (Power Systems)
Bhilai Steel Plant

TO

THE SHIFT MANAGER

PSD (BSP)

R/Sir

AS PER YOUR e-MAIL POWER GENERATION REDUCED TO 65 MW FROM 07:30 Hrs 10/12/10 TO 14:00 Hrs. ON 10/12/10 COMPLIANCE IS IN
PROGRESS

SHIFT/IC
GROUP-D
PP-II