City of Palo Alto

California Avenue – Transit Hub Corridor Project
Design RFP No. 140691

Pre‐Bidders Conference (Optional)

April 19, 2011
California Avenue – Background

• City received VTA Community Design for 
Transportation Program (CDT) grant in the amount of 
$1,175,200
• $550,000 Local Match for Design Phase‐Construction
• Funding for Construction available Feb. 2012
• City completed CEQA  
• Negative Declaration ‐ No Significant Impact
• Traffic Impact Analysis Completed

California Ave – Transit Hub Corridor Project – Pre‐bidder’s Conference


California Avenue – Vision for Street

• Promote pedestrian and bicycle safety
• Complement adjacent land uses and provide 
pedestrian/bicycle amenities on the sidewalk
• Balance needs of all modes of travel
• Promote connectivity to surrounding existing and 
planned pedestrian and bicycle facilities
• Encourage streetscape design elements that are 
attractive to pedestrians and bicyclists
• Support use of public transportation

California Ave – Transit Hub Corridor Project – Pre‐bidder’s Conference


Cal Ave Transit Hub Corridor Project – Project Benefits

• Multi‐Modal Use of Street
• Increased Safety for Pedestrians and Bicyclists
• Enhanced Amenities and Landscaping

• Opportunities for Public Interaction
• Park Benches
• Outdoor Seating
• Bulb‐Outs
• Public Art Elements

• Continue to Maintain High Level of Service for
Automobiles and Transit

California Ave – Transit Hub Corridor Project – Pre‐bidder’s Conference


Cal Ave Transit Hub Corridor Project – Project Description

Project Elements
• Streetscape Elements
• Community Identity Markers
• Large Shade Trees
• Park Plaza Park
• News Racks
• Bicycle Parking
• Traffic Calming Improvements
• Parking Improvements
• Bulb‐Outs
• 4‐ to 2‐Lane Reduction

California Ave – Transit Hub Corridor Project – Pre‐bidder’s Conference


Cal Ave Transit Hub Corridor Project - Concept Plan

California Ave – Transit Hub Corridor Project – Pre‐bidder’s Conference


California Ave & El Camino Real
California Ave & Birch St

California Ave – Transit Hub Corridor Project – Pre‐bidder’s Conference


California Ave & Park Blvd

California Ave – Transit Hub Corridor Project – Pre‐bidder’s Conference


Cal Ave Transit Hub Corridor Project – Project Alternative

Sidewalk Widening Opportunities – City Council Request
• Entire corridor
• Specific locations
• Use of dividers (decorative elements)

Return to PTC and City Council at 15% Design

California Ave – Transit Hub Corridor Project – Pre‐bidder’s Conference


Cal Ave Transit Hub Corridor Project –Fountain Design
• Fountain to be designed and constructed prior to project
Cal Ave Transit Hub Corridor Project – Plaza Design
• Propose a design to revamp and Improve the Plaza.
• Plaza design should complement the new fountain design.
Cal Ave Transit Hub Corridor Project – Project Alternative

Street Resurfacing
• Consultant to Prepare Street Resurfacing Plans
• Cost of Resurfacing D&C Funded from Street Program

California Ave – Transit Hub Corridor Project – Pre‐bidder’s Conference


Cal Ave Transit Hub Corridor Project – Next Steps
• CEQA complete (current lawsuit against NOD)
• Design w/Extensive Community Outreach– 12 months
• E‐76 Certification and NEPA required
• Historical Preservation Study
• Hydraulic Study Report
• Tree Removal Summary
• Flood Plan Study
• Traffic Impact Analysis (City Furnished)
• ROW clearance –as required
• Construction
• Grant Funds Available – Feb 2012
• Construction Advertise – Spring 2012
• Construction Begin – Summer 2012

California Ave – Transit Hub Corridor Project – Pre‐bidder’s Conference


Cal Ave Transit Hub Corridor Project – Schedule

• Deadline for Questions – April 27, 2011
• Proposals Due – May 3, 2011

• Finalists Indentified – Week of May 20, 2011
• Consultant Interviews – Week of May 30, 2011
• Consultant Selection ‐ Week of June 6, 2011
• Contract Awarded ‐ June 20, 2011
• Notice to Proceed – July  2011

California Ave – Transit Hub Corridor Project – Pre‐bidder’s Conference


QUESTIONS?

www.cityofpaloalto.org/calave

California Ave – Transit Hub Corridor Project – Pre‐bidder’s Conference