Sie sind auf Seite 1von 8

Quota per

Part Number: Standard Work Date Prepared Shift Manual -----------


Automatic - - - - -
Part Name: Combination Sheet Dept. TAKT Time Walking ~ ~ ~ ~ ~
ST EP T IME Op e ra tio n Time (in s e co nd s )
NUMBER Operation Name Man. Auto. Walk

To ta l
Percent Loading
Prepared by: Date:
Time

Operators
Standard Worksheet
Prepared by: Scope of From: Circle one
Date: Operations To: "As Is" / Proposed

Quality Safety Standard Work- # of Pieces of Std. TAKT Cycle Operator


Check Precaution in-Process Work-in-Process Time Time Number
Time Observation
Process for Prepared by: Operation # Circle one
Observation
Observation "As Is" / Proposed
Date:
Component
No. Component Task 1 2 3 4 Notes:
Task Time

Floorplan of Work Area

Time for 1 Cycle


Target Progress Report
Team Name: Event Period:
Product Cell: TAKT Time:
Product/Process: Team Leader:

Target Final
Measurements "As Is" Actual / % Day 1 Day 2 Day 3 Actual / %

Space (sq.ft.) / /

Inventory / /

Walking Distance / /

Part Travel Distance / /

Lead-time / /

5S / /

EH&S / /

Setup / /

Visuals / /

Crew Size / /

Remarks:
Continuous Improvement Newspaper
Cell:

Action Task Assigned Date


Date Name Problem
(Suggestion) (Name / Date) Complete
Continuous Improvement Newspaper
Cell:

Action Task Assigned Date


Date Name Problem
(Suggestion) (Name / Date) Complete
Table of Production Capacity by Process
New/Rev Date: Page of
Current Output
Manager: Prepared by: Part No. Line Name
Person-Day
Max Output Workers
Supervisor: Date: Part Name
Daily Needed up to Pcs

Base Time Tools Remarks Time Manual


Step Machine Processing
No.
Process Name Number Walking Manual Auto Run Time to # of pieces Time to Capacity Indicated Automatic ------
Time/Piece
Time Task Time Time Complete to change Change Walking ~~~~~

Totals (Note) Revise Times, Every Time Kaizen Has Shortened Them and Write the Reason For The New Times In The
Grand Total "Remarks" Columns.

Das könnte Ihnen auch gefallen