Beruflich Dokumente
Kultur Dokumente
Periode
LOKO A LOKO B LOKO C LOKO D
1 1963 1445 1533 1567
2 1963 1464 1533 1567
3 1963 1430 1533 1567
4 1963 1326 1533 1567
5 1963 1444 1533 1567
6 1963 1283 1533 1567
TOTAL 11778 8392 9198 9402
Wb(detik) 138.088430025 33.3381825 139.54844295 83.619972975
Wb(jam) 0.038357897229 0.00926060625 0.038763456375 0.023227770271
Faktor Konversi 1 0.241426327274 1.010573028636 0.605553795925
Inventory 1200 253.49764363794 1061.1016800682 544.99841633275
LOKO A B C D
Inventory awal 1200 1050 1050 900
inv.awal x f.konv. 1200 254 1062 545
HASIL PERAMALAN
Periode
LOKO A LOKO B LOKO C LOKO D
1 1963 1445 1533 1567
2 1963 1464 1533 1567
3 1963 1430 1533 1567
4 1963 1326 1533 1567
5 1963 1444 1533 1567
6 1963 1283 1533 1567
JUMLAH
4200
3061
6508 1 3447
6527 2 6527
6493 3 6493
6389 4 6389
6507 5 6507
6346 6 6346
NO DATA ASUMSI LOKO A LOKO B LOKO C LOKO D
1 Inventory awal (item) 1200 1050 1050 900
2 Inventory akhir (item) - - - -
3 Maximum backorder (unit) - - - -
4 Maximum subkontrak (unit) 900 1110 1080 1200
5 safety stock (unit) - - - -
6 maximum overtime perhari 4
7 jam kerja/hari(jam) 8
8 jumlah tenaga kerja (orang) 15
9 BIAYA-BIAYA
regular time/jam 5500
overtime/jam 9500
undertime/jam -
subkontrak/produk agregat 15000
hire/orang 110000
layoff/orang 345000
backorder/produk agregat -
lost sales/produk agregat 63000
inventory/produk agregat 4000
holding cost 4500
bahan baku 6000
bulan ke jumlah hari/bulan
1 20
2 16
3 20
4 24
5 24
6 16
LEVEL STRATEGY
Metode
Level Strategy
Subcontract Strategy
Chase Strategy
Mixed Strategy
Subcontract strategy
Total Cost
Rp. 102.168.000
Rp. 225.405.000
Rp. 454.935.000
Rp. 4.586.017.500
Chase strategy
561659000 236488000
413516000 174112000
532722000 224304000
652593000 274776000
651472000 274304000
415235500 174836000
Changing Work Force TOTAL
0 Rp 798,147,000.00
0 Rp 587,628,000.00
0 Rp 757,026,000.00
0 Rp 927,369,000.00
0 Rp 925,776,000.00
0 Rp 590,071,500.00
Rp 4,586,017,500.00
Periode Hari Kerja Jam Kerja Jumlah Tenaga Kerja Waktu Baku
1 20 8 15 0.038357897229167
2 16 8 15 0.038357897229167
3 20 8 15 0.038357897229167
4 24 8 15 0.038357897229167
5 24 8 15 0.038357897229167
6 16 8 15 0.038357897229167
Periode
1
2
3
4
5
6
Regular Time Capacity in Unit Bahan Baku Regular Time per Jam
44000
44000
44000
44000
44000
44000
Regular Cost per Unit Maximum Overtime Overtime Capacity per Unit
6211 4 31285
6211 4 25028
6211 4 31285
6211 4 37542
6211 4 37542
6211 4 25028
Overtime Cost per Unit Initial Inventory (+) or Backorder (-) Unit Inventory Holding Cost
3061
44000 4500
44000 4500
44000 4500
44000 4500
44000 4500
44000 4500
Maximum Sub
900
1
900
Subcontract Capacity in Unit
2987
Maximum Subcontract
1110 1080 1200
0.241426327274228 1.010573 0.605554
267.983223274393 1091.419 726.6646