-3.19 42.23
3.19 42.23
-3.33 44.17
P/A between 1.4 - 3.5 Mpa
Balance at least SW + 50% of SDL
Since extra prestress force doesn't increase the cost, use maximum
5 strands per duct
Duct spacing = 0.8 - 1.2 m
Min radius of curvature = 2.5m
Interval of straight cable = 0.5m
Prestessing force determined by load balancing, but concrete stresses at transfer and full loading checked
Ultimate moment capacity checked
1m wide strip
Walls are 200mm
Deflection
kcs 2.00
Dload,long 22.74 kN/m
Deff,1 9.71 kN/m
Deff,2 14.61 kN/m
Deff,3 14.02 kN/m
Span1/250 32 mm
Span2/250 51.2 mm
Span2/250 40 mm
Dtotal,1 4.52 mm
Dtotal,2 -41.83 mm
Dtotal,3 -20.6 mm
Crack Control
f'c 32 MPa
f'ci 25 MPa
Fti 1.25 MPa
Fci -12.50 MPa
Ft 2.83 MPa
Fc -14.40 MPa
ermined without haunching moments and downward force included
Cover 25 mm
D 220 mm
yc 110 mm
bw 2400 mm
As 5.28E+05 mm2
I 2.13E+09 mm4
Stirrup 12 mm
Duct 19 mm
Strand 12.7 mm
Strands/Du 5
MBL 184 kN
fpu 1840 kPa
Pduct 782 kN
Lossi 8%
Losst 15%
f'c 32 MPa
SW 12.67 kN/m
SDL 2.4 kN/m
G 15.072 kN/m
Q 7.2 kPa
ys 0.70
yl 0.30
wt 15.07 kN/m
ws 20.11 kN/m
Leff,1 6.5 m Subtract width of column
Leff,2 9.1 m
Leff,3 9.1 m
Leff,4 8.7 m
Leff,5 9.1 m
Leff,6 9.1 m
Leff,7 6.5 m
emax,mid 60.35 mm
emax,sup 41.35 mm Beam duct must go under the slab duct
e1,L 0 mm
e1 60.35 mm
e1,R 41.35 mm
e2 60.35 mm
e2,R 41.35 mm
e3 60.35 mm
e3,R 41.35 mm
e4 60.35 mm
e4,R 41.35 mm
e5 60.35 mm
e5,R 41.35 mm
e6 60.35 mm
e6,R 41.35 mm
e7 60.35 mm
e7,R 0 mm
esag,1 81.025 mm
esag,2 101.7 mm
esag,3 101.7 mm
esag,4 101.7 mm
esag,5 101.7 mm
esag,6 101.7 mm
esag,7 81.025 mm
Pe 1800 kN
Pi 2118 kN
Pj 2302 kN
Pe/A 3.41 MPa
Ducts 2.94 i.e. 3 ducts at 800 cts
Spacing 815.37 mm