Facts

Independent studies put the PCU count at a maximum of 1262 PCU/hr during peak hours & a minimum of 439 PCU/hr during off peak hours As per IRC 86-1983 a one way 2 lane carriageway should take 2400 PCU/hr (LOS C) Total width on the bund road at the narrowest point including the sidewalk space is 12.7m. This should allow for 4 lane road with 3.2m wide lanes

Road currently being widened to 6 lane carriageway

2 lane wide slip roads. Can consider right turn grade separated loop here from CV Raman road into Bellary road southbound

Make non-destructive modifications to keep this as a 4 lane corridor & not 6 lane one

Overhead gantries to inform people to take Mekhri circle to reach Yeswantpur. VMS boards can be used to provide dynamic traffic information on the green & red corridor

Pedestrians & Bicylists can use the joggers track OR A steel attachment can be hung on the bund wall for pedestrians Acquire 2 meters of sidewalk on the bund road giving 13 m minimum width along the entire stretch A Ramp for pedestrians to get back to street level The sidewalk can move pedestrians to the other side of the tank