Beruflich Dokumente
Kultur Dokumente
PRESENTED BY
E.M.U.CARSHED / HOWRAH
EASTERN RAILWAY
INTRODUCTION
EMU COACHES ARE PROVIDED WITH DOUBLE STAGE SUSPENSION SYSTEM PRIMARY SUSPENSION SECONDARY SUSPENSION
PREVIOUSLY END GROUNDED CLOSED COIL HELICAL SPRINGS WITH OIL DUMPER / SHOCK ABSORBER ARE USED BOTH FOR PRIMARY AND SECONDARY SUSPENSION. BUT NOW AIR COLUMN IS USED IN PLACE OF COIL SPRING IN SECONDARY SUSPENSION DUE TO ITS CLASSIC CHARACTERISTICS OF VARYING STIFFNESS.
LEVELING VALVE
HISTORY
In the year 2001a trial had been done by RDSO on 3-point and 4-point air suspension coaches. After the trial RDSO declared that the 3-point suspension system is not suitable for EMU service. Only 4-point suspension system remain is in system and one trailer coach with 3-point suspension is converted to 4-point suspension as per ICF drawing by CS/HWH & in one Motor with 3-point suspension is in service with conventional coil springs in secondary.
LEVELING VALVE
WORKING PRINCIPLE
Air from MR flows to air spring bellow through leveling valve when this valve is in charging position. As the pressure inside the bellow increases bellow height increases as well as bolster also lifts up and the link of leveling Valve approaching to horizontal position. When the Leveling valve enters within dead band zone no further air will flow to bellow. Now if the load on air spring increases, bolster goes down and leveling valve will be in charging condition admitting more air into the bellow. This causes bolster again lifts up to the preset level.
WORKING PRINCIPLE
Now when the load on air spring decreases, the bolster goes up and leveling valve will be in discharging mode. Then air from bellow flows out to atmosphere through leveling valve. Thus bolster as well as leveling valve goes down up to the same preset level.
20 LTRS. RESERVOIR
AS
AS
INSTALLATION LEVER
20 LTRS. RESERVOIR
POPULATION
PNEUMATIC
Division Bellow (Contitech) Bellow (Firestone) Leveling valve Leveling valve Duplex check Duplex check valve valve (Knorr(FTIL) bremse) (Knorr-bremse (FTIL)
39 80 119
96 200 296
58 92 150
48 94 142
MECHANICAL
Division Vertical Shock absorber (300 kg.) (ESCORTS) Vertical Shock absorber (300 kg.) (Gabrial) Vertical Shock absorber (300 kg.) (IAI) Lateral Shock absorber (200 kg.) (ESCORTS) Lateral Shock absorber (200 kg.) (Gabrial) Lateral Shock absorber (200 kg.) (IAI)
NIL 86 86
18 26 44
NIL 86 86
18 26 44
312
12 NOS. 07 YRS. 54 NOS. - 03.33 YRS. 54 NOS. - 03 YRS. 54 NOS. 01.17 YRS. 30 NOS. 0.42 YRS. 54 NOS. - 0.25 YRS. 54 NOS. 01 MONTHS.
30 NOS.
5.8
AVAILABLE GUIDELINES FROM RDSO/LKO CMI 9802 (REV. 1) MAY 2001 & (REV. 2) FEBRUARY 2008.
PROCEDURE FOR LEAKAGE TESTING AND PERMISSIBLE PROCDURE OF CHECKING BOGIE CLEARANCES AND CE . PROCEDURE FOR PROCEDURE FOR INSTALLATION LEV GENERAL TECHNICAL DATA FOR SPRINGS. MAINTENANCE SCHEDULE. SUSPENSION DATA.
GUIDELINE REQUIRED
MR PRESSURE SETTING. CLEANING OF FILTER FOR LEVELING VALVE. EXCESS RUNNING TIME OF MCP. PROBLEM WITH MAINTENANCE OF M/S FTIL MAKE LEVELING VALVE REGARDING LEAKAGE. NON INTERCHANGEABILITY OF BASE PLATE FOR AIR SPRING BELOW.