Whats FMS ? Factory Monitoring System A production supervision system using a set of data collection software and hardware installed directly on the shop-floor, allowing real-time statistical analysis of key performance indicators related to quantities produced and production losses.
Optical sensors capturing board assembly pass. Defining: Quantity, Rythim and stoppages of the line.
Production Area
Route r Finui E N G I N E Labeling Equipments SOp
Route r
Production Improvements !
Photo Sensor Collect the Structure Board Collect Flash and Assembly / Finui Data by Routers Data by PDMS Data Base Photo Sensor
EnO-FA
Network
Revision meetings
Mo del
A B
When?
Each shift change Beginning of each shift Weekly Weekly Weekly Weekly
Durat ion
10 min. 10 min. 15 min. 30 min. 60 min. 60 min.
Who?
Ending shift KO and beginning shift KO. Supervisor, Key Operator and operators Supervisor, Key Operator and operators. Chief and supervisor Production Manager, all chiefs. Main Manager and Area Managers.
FMS reports
B+R C D E
AVAILABLE TIME
OPERATIONAL TIME
RUNNING TIME
GROSS PRODUCTIVE TIME TIME LOST BY SPEED LOSS NET PRODUCTIVE TIME TIME LOST BY REWORKING PIECES TIME LOST BY PIECES SCRAPPED
Overall Equipment Effectiveness OEE = FTT x Performance x Availability Asset Effectiveness AE = OEE x TIME AVAILABLE TOTAL TIME
5
RE
NET PRO
CTIVE TIME
TIME LO T BY OR IN PIECE
TIME LO T BY LO
RO
PRO
R NNIN
TIME
CTIVE TIME
NPLANNE TOP
PLANNE TOP
PEE
O R AY
TOTAL TIME
NON TIME
OR IN
K n o w n
PERFORMANCE AVAILABILITY OEE (Overall Equipment Effectiveness) AE (Asset Effectiveness) QUALITY EFFICIENCY UTILIZATION PRODUCTIVITY UNPLANNED STOPS PLANNED STOPS 6
OEE * Available Time/Total Time (TIME LOST BY SCRAPPING + TIME LOST BY REWORKING) (GROSS PRODUCTIVE TIME) NET PRODUCTIVE TIME / RUNNING TIME RUNNING TIME / OPERATIONAL TIME NET PRODUCTIVE TIME / OPERATIONAL TIME UNPLANNED STOPS / OPERATIONAL TIME PLANNED STOPS / AVAILABLE TIME
F M S
AVAILABLE TIME
OPERATIONAL TIME
RUNNING TIME
GROSS PRODUCTIVE TIME TIME LOST BY SPEED LOSS NET PRODUCTIVE TIME TIME LOST BY REWORKING PIECES TIME LOST BY PIECES SCRAPPED
QUALITY =
AVAILABLE TIME
OPERATIONAL TIME
RUNNING TIME
GROSS PRODUCTIVE TIME TIME LOST BY SPEED LOSS NET PRODUCTIVE TIME TIME LOST BY REWORKING PIECES TIME LOST BY PIECES SCRAPPED
EFFICIENCY =
AVAILABLE TIME
OPERATIONAL TIME
RUNNING TIME
GROSS PRODUCTIVE TIME TIME LOST BY SPEED LOSS NET PRODUCTIVE TIME TIME LOST BY REWORKING PIECES TIME LOST BY PIECES SCRAPPED
USAGE =
AVAILABLE TIME
OPERATIONAL TIME
RUNNING TIME
GROSS PRODUCTIVE TIME TIME LOST BY SPEED LOSS NET PRODUCTIVE TIME TIME LOST BY REWORKING PIECES TIME LOST BY PIECES SCRAPPED
PRODUCTIVITY =
AVAILABLE TIME
OPERATIONAL TIME
RUNNING TIME
GROSS PRODUCTIVE TIME TIME LOST BY SPEED LOSS NET PRODUCTIVE TIME TIME LOST BY REWORKING PIECES TIME LOST BY PIECES SCRAPPED
UNPLANNED STOPS =
AVAILABLE TIME
OPERATIONAL TIME
RUNNING TIME
GROSS PRODUCTIVE TIME TIME LOST BY SPEED LOSS NET PRODUCTIVE TIME TIME LOST BY REWORKING PIECES TIME LOST BY PIECES SCRAPPED
PLANNED STOPS =
AVAILABLE TIME
OPERATIONAL TIME
RUNNING TIME
GROSS PRODUCTIVE TIME TIME LOST BY SPEED LOSS NET PRODUCTIVE TIME TIME LOST BY REWORKING PIECES TIME LOST BY PIECES SCRAPPED
FTT =
AVAILABLE TIME
OPERATIONAL TIME
RUNNING TIME
GROSS PRODUCTIVE TIME TIME LOST BY SPEED LOSS NET PRODUCTIVE TIME TIME LOST BY REWORKING PIECES TIME LOST BY PIECES SCRAPPED
PERFORMANCE =
AVAILABLE TIME
OPERATIONAL TIME
RUNNING TIME
GROSS PRODUCTIVE TIME TIME LOST BY SPEED LOSS NET PRODUCTIVE TIME TIME LOST BY REWORKING PIECES TIME LOST BY PIECES SCRAPPED
AVAILABILITY =
TOTA T
2 2
0)
24 HOU
X 365
AVA
ET
O E AT O A T
'
O UCT VE T
EE
# #
# $"
ET
O UCT VE T
# $"
'
OEE =
OEE = FTT X
ET
E FO
O UCT VE T
A CE X AVA
O UCT VE T
E x
ECE
ECE
87
93733 5
87
6 54 @@ 59
87
6 54
O UCT VE T
AVA
ET
87
AB A7
87
93733 5
OEE =
87 7 6 54 @@ 59 3
ET
AVA
16
O UCT VE T
ET
E E
E E
AE = OEE x AE = ET
ET E E
F F
P QI
ET
O UCT VE T
E O T
P P
P II Q P II Q F I G E D C H C F I T SQ Q C C U C C R G U E D R H H C C F F E E I FF I FF G G E D E D C C FH FH F F
C C
C C
P QI
O UCT VE T
D D
I I F F F F P T T EIT P T T EIT
O E AT O A T
A TO
I I F F P TT EI P TT EI
C C
D D
E T
T TT Q T TT Q C U C
EG E EG E
AVA
ET
24 HOU
X 365
Y Y
C C
D D
C C
WV E E
TOTA T
C C
FF
Q I
C C
E O T O
EE
Areas
Line BA
Line FA
Sectors
Sector A
Sector B
Sector C
Sector D
Groups
Group A
Group B
Group C
Group D
Group E
Group F .
Resources
R1
R2
R3
R4
R5
R6
R7
R8
R9
R10
18
Resource Visualization
Resources
19
Consolidation Hierarchy
Visualization by Management Level
Managers
Supervisors
Resources
20
Resources
21
Technical overview
22
MS-SQL MPWS
ALARM ENGINE
MS-SQL2k FMS
BROWSER
VIEW WEB
LICENSE MANAGER
23
Architecture
Application server Database server File server
User workstations
Servers room
ADAM-6050
Toten Line - 01
Toten Line - 02
User workstations
Each line has its own shop-floor server; Each shop-floor server has one PCI-1750 I/O card and Electrical panel, allowing the connection of, at most, 16 sensors. 24
Some pictures
25
27
Line is Running
Line Stopped
UNKNOWN STOPS
1.4
WAITING TECHNICIAN
28
REPORT SCREENS
29
Option: Synoptic
30
Option: Indicators
Time Summary and KPIs
31
Option: Indicators
Productivity indicators
32
Option: Indicators
Trends
33
34
Thank You !
35
b.
Non-scheduled time
c.
Running Time
General Six Big Losses 1. Breakdowns 2. Setup and adjustments 3. Small stops
OEE indicates - how effectively available time is utilized - how much of our available capacity we use in an efficient way AE (Asset Effectiveness) indicates - how well total time and lines theoretical maximum capacity can be utilized - how effectively assets/ investments are used
Speed Losses
Quality Losses
OEE = AE =
Net Productive time Qualit Planning Factor y X X (Pf) Total time (Q)
Lack Production Time diagram of Demand is moved from Available Time area
Pure OEE%
a. Total Time (365/6 x 24 h)
Non-scheduled time (Holidays, Weekends) Non-Schedule Time (Lack of Demand)
b.
Available Time
c.
Running Time
General Six Big Losses 1. Breakdowns 2. Setup and adjustments 3. Small stops
OEE -elements Pure Availability Factor (A)=c/b Pure OEE indicates - how effectively available time is utilized - Lack of Demand is excluded from available time - how much of our available capacity we use in an efficient way AE (Asset Effectiveness) indicates - how well total time and lines theoretical maximum capacity can be utilized - how effectively assets/ investments are used
Speed Losses
Quality Losses
Pure OEE = AE =
Pure Availability Performance (A) X (P)X Pure Availability Performance X (A)X (P) 37
Net Productive time Qualit Planning Factor y X X (Pf) Total time (Q)