Mobitel Stage4 Huawei BTS3900A Installation Guide V1.0


2008.9
www.huawei.com Liu Jiang 60307

rs :

rial

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

5pt B0 nt : um ers nd rs : rial

2G BTS3900A(outdoor)

APM30 for power and BBU Battery cabinet: 184Ah*2

2pt -5: 8pt ck nt : um ers nd rs : rial

RF cabinet for 6 DRFU

The layout of the BTS3900A is as shown in the picture. The APM30 and RF cabinet should be near to the cable ladder. Two battery cabinet should stack.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 2

5pt B0 nt : um ers nd rs : rial

Outlook of BTS3900A

2pt -5: 8pt ck nt : um ers nd rs : rial

BTS3900A cabinet

Stacked Battery cabinet

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 3

5pt B0 nt : um ers nd rs : rial

The plinth

2pt -5: 8pt ck nt : um ers nd rs : rial

The BTS should be installed on the steel rack or concrete plinth For the steel rack, use the bolt and nut to fix the base frame of cabinet. For the concrete plinth, use the expansion blot to fix the base frame.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 4

5pt B0 nt : um ers nd rs : rial

Install the base

2pt -5: 8pt ck nt : um ers nd rs : rial

Fix the base to the plinth and check the levelness with level bar, if the level bar is not in the middle, use the adjusting pad to adjust the levelness 2 base need to be installed, one is for BTS3900A, one is for battery cabinet
Huawei Confidential Page 5

HUAWEI TECHNOLOGIES CO., LTD.

5pt B0 nt : um ers nd rs : rial

Install the cabinet

2pt -5: 8pt ck nt : um ers nd rs : rial

Push the cabinet so that the cabinet can be in full contact with the installation block Use two bolts to fix the cabinet to the base

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 6

5pt B0 nt : um ers nd rs : rial

Install the component


PMU BBU

PSU
Special handle is needed to remove the DRFU

2pt -5: 8pt ck nt : um ers nd rs : rial

Install the BBU, DRFU, PMU and PSU to the cabinet as shown in the picture. The BBU should be close to the PDU panel, without space between PDU and BBU

DRFU

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 7

5pt B0 nt : um ers nd rs : rial

Connect the DC cable for BBU and DRFU

2pt -5: 8pt ck nt : um ers nd rs : rial

Load5
Connector to UPEU on BBU DC power cable for DRFU

Connect the DC cable to the Load5 of the PDU with OT terminal. Blue cable as 48v, and black as 0 V. Connect the power terminal to the UPEU card on BBU. Connect the power cable to the corresponding DRFU, 6 cables to 6 DRFU. The other end is already connected.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 8

5pt B0 nt : um ers nd rs : rial

Install the CPRI cable for DRFU

2pt -5: 8pt ck nt : um ers nd rs : rial

GTMU DRFU

CPRI cable

Connect the CPRI cable between the GTMU and DRFU, the 6 ports on GTMU should be connected to the corresponding DRFU. The port on DRFU should be port0 The CPRI cable route should be at left side of the cabinet, as show in the picture
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 9

5pt B0 nt : um ers nd rs : rial

Install E1 cable

2pt -5: 8pt ck nt : um ers nd rs : rial

UELP

GTMU

There are two E1 cable, one is between GTMU and UELP, the other is from UELP to MW The cable between GTMU and UELP is already made.

GTMU

UELP

MW

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 10

5pt B0 nt : um ers nd rs : rial

RF cable
Upper 6 jumper to be installed Usually, the lower 6 jumper is not needed

2pt -5: 8pt ck nt : um ers nd rs : rial

S2

S2 PBT S3 S4

Usually, one cabinet has 6 jumpers, please refer to the picture for the jumper and RF cable connection. One end of the jumper is straight DIN connector, the other end (BTS side) is right angle DIN connector. The connectors need to be made on site. The configuration of the cell is as showing in the picture:S2, S2 PBT, S3, S4
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 11

5pt B0 nt : um ers nd rs : rial

Stack two battery cabinet


Wiring cover

cover

2pt -5: 8pt ck nt : um ers nd rs : rial

Step 3

Step 1

Step 2

Step1:Install the lower cabinet and remove the cover Step2:Install the wiring cover to the lower cabinet Step3:Seal the wiring cover with mud. Step4:Install the upper cabinet on top of the lower cabinet, fasten the upper cabinet with 4 bolts.

Step 4

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 12

5pt B0 nt : um ers nd rs : rial

Install the battery


Install the DC cable to APM30 Install the DC cable between upper and lower battery

2pt -5: 8pt ck nt : um ers nd rs : rial

Upper battery cabinet

Lower battery cabinet

Battery breaker

Use the black DC cable as 48V, and red DC cable as 0V. 2 battery banks to be installed in each cabinet. Attention! Switch off the battery breaker in battery cabinet and APM30 when installing Battery terminal the battery!
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 13

5pt B0 nt : um ers nd rs : rial

Install the grounding cable

2pt -5: 8pt ck nt : um ers nd rs : rial

ECB inside the cabinet Install the PGND cable from APM30 to ECB Install another 2 pcs of equipotential cable from APM30 to upper battery cabinet and lower battery cabinet
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 14

5pt B0 nt : um ers nd rs : rial

Connect the AC input cable

2pt -5: 8pt ck nt : um ers nd rs : rial

PDU

short circuit bar

Install the 4 x 4mm^2 armored cable to the terminal of PDU, L1,L2,L3,N: brown, black, grey, blue. When 3 phase power is used, the short circuit bar should be removed; when single phase power is used, install the short circuit bar. AC power cable should be protected in the GI pipe , and the armor of the cable should be grounded with the hose clip
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 15

5pt B0 nt : um ers nd rs : rial

Lay the AC power cable


Dig a channel between meter cubicle and plinth. Lay the AC power cable with the protection of GI pipe. Flexible GI pipe should be used as bend. The armor of the AC cable need to be grounded. Ground the GI pipe with M8 x 25mm bolt & nut, using 25mm^2 grounding cable Bury the pipe

2pt -5: 8pt ck nt : um ers nd rs : rial

Dig the channel and lay the AC cable


HUAWEI TECHNOLOGIES CO., LTD.

Make the bend with the Gi flex pipe


Huawei Confidential

Ground the AC cable armor with the hose clip


Page 16

5pt B0 nt : um ers nd rs : rial

Install the SPD for BTS

2pt -5: 8pt ck nt : um ers nd rs : rial

Install the SPD box on the meter cubicle, the SPD should be grounded.

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 17

5pt B0 nt : um ers nd rs : rial

Alarm Cable
FMUA(COM)------BBU(MON0)

2pt -5: 8pt ck nt : um ers nd rs : rial

BBU(MON0)

FMUA(COM IN)

Connect the BBU(MON0) and FMUA(COM IN) with the cable(04070023)


HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 18

5pt B0 nt : um ers nd rs : rial

Alarm Cable
DPMU(COM)------APMI(J1)

2pt -5: 8pt ck nt : um ers nd rs : rial

One end of the cable is already connected to J1 port of APMI, the other end need to be connected to COM port of DPMU
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 19

5pt B0 nt : um ers nd rs : rial

Alarm Cable
DPMU(RS422)------APMI(RS422)

2pt -5: 8pt ck nt : um ers nd rs : rial

One end of the cable is already connected to RS422 port of APMI, the other end need to be connected to RS422 port of DPMU

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 20

5pt B0 nt : um ers nd rs : rial

Alarm Cable
BBU(MON1)------APMI(TX- TX+,RX- RX+)
Wire White Orange Blue White One pair One pair Port on APMI TX+ TXRX+ RX-

2pt -5: 8pt ck nt : um ers nd rs : rial

One end of the cable(04080029) is to MON1 port of BBU, another end need to be cut and connect the wire to the panel of APMI (TX- TX+,RX- RX+), The connection is as shown in the table.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 21

5pt B0 nt : um ers nd rs : rial

Install battery sensor cable

2pt -5: 8pt ck nt : um ers nd rs : rial

One end of the battery sensor cable is already connected to the APMI card BAT_TEM1 port, so connect the other end to one cell of the battery.
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 22

5pt B0 nt : um ers nd rs : rial

Connect the door sensor cable

2pt -5: 8pt ck nt : um ers nd rs : rial

Socket to connect the 2 sensor

Connect the door sensors of the two battery cabinets and the APM30 as red line shown in the picture Connect the sensor cable to the socket of the prior door sensor, so the connection of the 3 door sensors are serial
Huawei Confidential Page 23

HUAWEI TECHNOLOGIES CO., LTD.

5pt B0 nt : um ers nd rs : rial

Antenna system installation

2pt -5: 8pt ck nt : um ers nd rs : rial

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 24

5pt B0 nt : um ers nd rs : rial

Antenna system installation


Ground the feeder cable according to the standard in the picture Antenna azimuth and down tilt should follow the design file strictly. All the jumper connectors are waterproofed well. The feeders are arranged neatly, the feeder and jumper labels are attached neatly and oriented in the same direction. Use feeder clamp to fix the feeder each meter.

2pt -5: 8pt ck nt : um ers nd rs : rial

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 25

5pt B0 nt : um ers nd rs : rial

Installation check key point


Check the grounding cable of cabinets, SPD, Gi pipe, AC power cable, feeder. Check the water proof of the feeder and antenna connector. Check AC and DC power cable color code, complied with the standard. The cable should be tied neatly. Keep redundancy when cutting the cable tie. Antenna height, azimuth and down tilt should follow the design file strictly. The signal cable and battery cable outside the cabinet should be protected with PVC flexible pipe. All the cables should be labeled with the label provided. Bring back the rest of the materials and clean the sites after installation.

2pt -5: 8pt ck nt : um ers nd rs : rial

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 26

5pt B0 nt : um ers nd rs : rial

Power on the cabinet

2pt -5: 8pt ck nt : um ers nd rs : rial

AC input Breaker

DC output Breaker

Step1:Switch off all the AC and DC breaker Step2:Power on the AC input breaker, check the indicator of the PMU and PSU, For PMU, if RUN is 1s on and 1s off, and ALARM is off, it mean the module is working normally For PSU, if the is on, and is off, it means the module is working normally

Step3:Use the multimeter to measure the DC output voltage, the normal range should be -38.4V to -57V. Step4:Switch on the DC output breaker for the related module, switch on the DC output breaker on the DCDU
HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Page 27

5pt B0 nt : um ers nd rs : rial

Commission the BTS


LIU1

2pt -5: 8pt ck nt : um ers nd rs : rial

Connect the E1 cable to MW, check the indicator LIU1 on the GTMU, if its always off, it means the E1 is normal. After the BTS is on air, make some test call, check the cell broadcast service and GPRS service. The following alarm need to be checked on site: Door alarm of all the 4 cabinets Water sensor of the cabinet Temperature and Humidity Battery sensor Mains failure and PSU failure

HUAWEI TECHNOLOGIES CO., LTD.

Huawei Confidential

Page 28

Thank you
www.huawei.com