Gas Turbine Engines For Gas Pipelines

IN THE MARINE, POWER AND GAS INDUSTRY

The State Enterprise Zorya-Mashproekt Gas Turbine Reasearch & Production Complex has a 50-years experience in designing & production gas turbines for Navies, commercial and passenger vessels, power plants and gas piping units and drivers for production equipments. The turbines developed for marine application have been excellently proven on land. Since 1953 over 3000 marine & industrial gas turbines have been produced and supplied. Thousands of varies reduction gears for different class displacement ships, hovercrafts & hydrofoils also for industrial application have been produced. Ships of 20 countries worldwide, over 60 power stations, more than 100 gas pipelines compressor stations in Russia, Ukraine, Kazakhstan, Belarus, Czechia, Canada, Azerbaijan, Iran and other countries are equipped with Zorya-Mashproekt gas turbines. The total power of the turbines exceeds 24 million kW and total firing time over 26 million hours. According to GAZPROM statistics, the gas pumping units (GPU) driven by our gas turbines have been acknowledged most reliable comparing to driven by another companies. They have highest mean value of technical utilization coefficient, maximum time between failure and the highest availability factor. Owing to the constant work on support and upgrade of the technical level, the of-time of many turbines exceeded 80000 firing hours without factory repair. UGT16000 (DR59) second generation leading turbine have accumulated over 35000 hours, UGT25000 fourth generation turbine over 28000 hours, UGT10000 fourth generation turbine has been put in to trialcommercial operation at Kirovogradskaya compressor station (Ukraine) in 2002. Zorya-Mashproekt gas turbines were created for naval applications; they are also adjusted for working off-shore, on floating & stationary oil & gas platforms.

ZORYA-MASHPROEKT Nikolaev, Ukraine

FROM PROJECT THROUGH DELIVERY

The specialist of Mashproekt (Scientific Research & Experimental-Design Works Center) is constantly working at creating new & upgrading early-developed gas turbines widely using modern sophisticated CAD\CAM systems. Zorya-Mashproekt facilities & laboratories have been equipped with up-to-date tools, equipment & technologies, the personnel there is well trained. High-temperature steel & alloy precision casting, precise isothermal & impulse extrusion, electro-beam welding, electro-beam & plasma coatings, laser cutting, electric methods of metal treatment-these make an incomplete list of advanced technologies applied at the enterprise. Possessing tooling allows realizing on time & qualitative production preparation. Gas turbines parts & assembling operational development & testing are held on the test-beds of the Scientific Research Department. 11 test-beds for full-scaled turbines & units testing are situated on the main territory, & 5 test-beds are in Kaborga village where is a marine test station, & a special loading gas ring for testing GPU is built. The specialist of the complex perform contract supervision, adjustment & alignment, guaranteed maintenance of prototype & stock-produced items on-site of the customer, and also after-sale maintenance through the whole service life.

GAS TURBINE ENGINES FOR GAS PIPELINES COMPRESSORS DRIVE


Zorya-Mashproekt turbines for gas pumping incorporate merits of aviation engines (light weight & overall dimensions, easy transportation, ability fo replacement of the whole unit or its module), as well as reliability & long service life of industrial engines. The turbines are 3-shaft design: low- and highpressure compressors driven by own axial turbines, unified for each turbine type and a free power turbine. The combustion chamber is canannular type. Each type of the gas turbine has several modifications different in speed, power turbine rotation direction and support construction, which allow to use them as part of domestic and import gas pumping units without gearings. Zorya-Mashproekt gas turbines are adopted for lubrication by same lubrication oil as driven compressor what permits to simplify the compressor stations lubricating system. As a rule, the turbines are equipped with electrical starting devices.

Features
1 - Variable geometry inlet guide vane 2 - Low pressure compressor (LPC) 3 - High pressure compressor (HPC) 4 - Combustion chamber (CC) 5 - High pressure turbine (HPT) 6 - Low pressure turbine (LPT) 7 - Power turbine (PT) 8 - Auxiliary drive gearbox 9 - Electric starter 10 - Frame

UGT 3000 (DE76)


Compressor - axial, 8 stages LPC, 9 stages HPC. Pressure ratio - 13,5. Combustion chamber - can-annular reverse flow with 9 combustion liners, TIT - 1020 0C. Gas generator turbines - axial, single stage LPT and HPT. 3-stage power turbine speed - 9700 rpm. Start - electric motors AC U=380 V, N= 70 kW.
Power, MW

Ambient air temperature, 0C

Efficiency, %

Ambient air temperature, 0C

Power, kW Efficiency, % Heat rate, nm3/kW-hr Exhaust gas mass flow, kg/sec

Exhaust gas temperature, 0C Dimensions (LxWxH), m Weight, ton

UGT 6000, UGT 6000+ (DT71, DV71)


Compressor - axial, 8 stages LPC, 9 stages HPC. Pressure ratio - 14/15,3. Combustion chamber - can-annular reverse flow with 10 combustion liners, TIT - 1015 - 1100 C. Gas generator turbines - axial, single stage LPT and HPT. Power turbine speed - 3000, 4800, 5400, 8200, 9700 rpm. Start - electric motors AC U=380 V, N=70 kW.
Efficiency, % Ambient air temperature, 0C Power, MW

Ambient air temperature, 0C

Engine Power, kW Efficiency, % Heat rate, nm /kW-hr Exhaust gas mass flow, kg/sec
Note: ISO condition
3

Engine Exhaust gas temperature, 0C Dimensions (LxWxH), m Weight, ton

UGT 10000 (DN70, DI70, DU70)

Efficiency, %

Power, MW

Compressor - axial, 9 stages LPC, 9 stages HPC. Pressure ratio - 19,5. Combustion chamber - can-annular reverse flow with 10 combustion liners, TIT - 1200 0C. Gas generator turbines - axial, single stage LPT and HPT. Power turbine speed - 3600, 4800, 6500 rpm. Start - electric motors AC U=380 V, N= 70 kW.

Ambient air temperature, 0C

Ambient air temperature, 0C

Power, kW Efficiency, % Heat rate, nm3/kW-hr Exhaust gas mass flow, kg/sec

Exhaust gas temperature, 0C Dimensions (LxWxH), m Weight, ton

UGT 15000, UGT 15000+ (DB90, DG90, DA91)


Compressor - axial, 9 stages LPC, 10 stages HPC. Pressure ratio - 19,6. Combustion chamber - can-annular reverse flow with 16 combustion liners, TIT - 1075 1160 C. Gas generator turbines - axial, single stage LPT and HPT. Power turbine speed - 3000, 5300 rpm. Start - electric motors AC U=380 V, N= 2 70 kW.
Efficiency, % Ambient air temperature, 0C

Power, MW

Ambient air temperature, 0C

Engine
Power, kW Efficiency, % Heat rate, nm /kW-hr Exhaust gas mass flow, kg/sec
3

Engine
Exhaust gas temperature, 0C Dimensions (LxWxH), m Weight, ton

UGT 16000 (DG 59)


Compressor - axial, 7 stages LPC, 9 stages HPC. Pressure ratio - 12,8. Gas generator turbines - axial, 2 stage LPT and HPT. Combustion chamber - can-annular with 10 combustion liners, TIT - 865 0C. Power turbine - axial, 3 stages. Power turbine speed - 5300 rpm. Start - electric motors AC U=380 V, N=3 x 70 kW.

24

34

16 12 8 4 -35 -25 -15 -5 5 15 25


0

Efficiency, %
35 45

Power, MW

20

32 30 28 26 24 -35 -25 -15 -5 5 15 25 35 45

Ambient air temperature, C

Ambient air temperature, o0C

Power, kW Efficiency, % Heat rate, nm /kW-hr Exhaust gas mass flow, kg/sec
3

Exhaust gas temperature, 0C Dimensions (LxWxH), m Weight, ton

UGT 25000 (DG80, DI80, DN80, DU80)


Compressor - axial, 9 stages LPC, 9 stages HPC. Pressure ratio - 21.0 Combustion chamber - can-annular reverse flow with 16 combustion liners, TIT - 1245 0C. Gas generator turbines - axial, single stage LPT and HPT. Power turbine speed - 3600, 4850 rpm. Start - electric motors AC U=380 V, N=3 x 70 kW.
35 42

25 20 15 10 -35

Efficiency, %
-25 -15 -5 5 15 25 35 45

Power, MW

30

38 34 30 26 22

Ambient air temperature, 0C

-35 -25

-15

-5

15

25

35

45

Ambient air temperature, o0C

Power, kW Efficiency, % Heat rate, nm /kW-hr Exhaust gas mass flow, kg/sec
3

Exhaust gas temperature, 0C Dimensions (LxWxH), m Weight, ton

ZORYA-MASHPROEKT Gas Turbines For New & Modernized Gas Pumping Units
Experience of using Zorya-Mashproekt gas turbines as integrated parts of gas pumping units achieves over 25 years. To date most of the gas pumping units based on the DR59 gas turbine has exhausted their service life. The specialists of the company have developed the concept of using the third & fourth generation gas turbines in gas pumping units of compressor stations under construction & modernization for drive replacement, both domestic & foreign ones. 34 modernization projects have been developed for gas pumping units in operation. They include replacement of out-of-date drives with exhausted life by modern, more economical Zorya-Mashproekt gas turbines. As a result of such reconstruction, at the working compressor station the modern technical level is being provided something nonstop. The greatest economical effect attributes to the upgrading of the working compressor shops in the conditions, when the new shop construction is either impossible or extremely difficult (in the mountainous pipeline sections, frozen grounds of the Extreme North, in the swamped territories when there are problems with land a purchasing). Zorya-Mashproekt performs projects of on-site drive adjustment in the units under upgrading. It also prepares equipment sets document necessary for gas pumping units upgrading. They include field changing of the equipment available on site (blowers, supports, air intake devises, exhausters, serving the auxiliary equipment). By the customer's desire, the experts of the company can perform automatic control system engineer's project of the units under upgrading. To increase independence of the compressor stations work when the outer power source is off & with the purpose to decrease cost on buying electric power, Zorya-Mashproekt suggests using free space after outof-date engines removed for construction own power station for providing compressor station uninterruptible power supply. Zorya-Mashproekt offers power stations with rated power 2.5, 6, 16 MW as well as turboexpander generating sets.

DE76 gas turbine modification with speed 9700 rpm was developed for the direct drive Prague Energo 3RSC56/3RSD56 centrifugal compressor without gearbox. This unit is used for gas pumping in and out at underground gas storage in Czech. The turbine has absolutely new two channel burners for NOx reduction and a special cage design with many layer sound isolation. The DE76E gas turbine can be used also in URAL GPU-3C compressor set developed by ISKRA SPE, Perm, Russia.
Gas pumping unit driven by DE76E at Stramberk underground gas storage engine room

The UGT6000 (DT71) gas turbine engine is used in GPU-C-6,3C unit produced by the FRUNZE company as serial production. It is also used to replace NK-12ST aeroderivated engine while upgrading GT-750-6 gas pumping units. This gas turbine is possible to be used for upgrading GTN-6 and GT-6-750 units produced by Russian company Turbomotorworks. There is UGT6000+ boosted version with rated power up to 8MW.

Gas pumping unit GPA-C-6,3S with Dt71 gas turbine

The UGT10000 fourth generation gas turbine has been developed with several modifications: DN70L with 4-stage left-rotated power turbine and rated speed 4800 rpm for GTC-10-2, GTC-104 and GTU-10 gas pumping units upgrading; DI70P with 3-stage right-rotated power turbine and rated speed 6500 rpm for GTC-10I gas pumping units upgrading; DI70L with 3-stage left-rotated power turbine and rated speed 6500 rpm for GT-750-6 gas pumping units upgrading; DU70L gas turbine with modernized flowing part to the power of 16MW by means of steam injection with 4-stage left-rotated power turbine and rated speed 4800 rpm is used in Aquarius GPU-16K unit.

GTK-10-I gas pumping unit modernization via replacing old MS3002 by new one DI70P gas turbine
Air inlet modernization Exhaust gas vent DI70P Auxiliary mechanism gearbox

Auxiliary alternator

Auxiliary mechanism gearbox

Auxiliary mechanism gearbox

GTK-10-4 gas pumping unit modernization

Air inlet

Conteiner Intermediate bearing

Gas compressor

One of the features of this upgrading is the new gas turbine building in the acting design scheme of the original unit maintaining all of its functions including house generating drive & united lubricating oil system. Frequency converter provides constancy of the frequency of the electrical energy produced by the house generator. This converter is used also for gas turbine starter control and provides smooth gas pumping unit starting.

Air for gas turbine cooling

Gas compressor lubricating oil tank

Modernized GTK-10-4 gas pumping unit with air inlet chamber and lubricating oil unit in the assembling workshop

Container with gas turbine is manufactured with highest noise insulation degree. Turboblock and air inlet unit integral design gives opportunity to reduce building and assembly jobs period. Gas compressor lubricating is integrated with gas turbine lubricating oil system, this design gives opportunity to exclude electrically driven pump.

Modernized gas pumping unit GTK-10-4 with DN70L gas turbine at CS Kirovogradskaya, Ukraine

The UGT 15000 gas turbine engine has the following modifications: DG90L, DG90L2 with power turbine frequency 5300 rpm of left rotation to be used in new GPUs of compressor shops: GPA-C-16S - developed by "Frunze" company (Sumy, Ukraine); GPA-16 "Ural" - developed by "Iskra" company ((Perm, Russia); GPA-16 "Volga" (Kazan, Russia); GPA-16 "Neva" (St. Peterburg, Russia); while upgrading GPUs increasing the drive power: GTK-10-4 (GTK-10-2) developed by NZL (St. Peterburg, Russia) GPU-10 developed bu "Zorya"-"Mashproekt" (Nikolayev, Ukraine), GPU-16 developed by "Frunze" company (Sumy, Ukraine). - DG90P with power turbine speed of 5300 rpm of right rotation for upgrading Coberra-183 imported units by Cooper -Rolls company. The main pattern of DG90P engine was installed in 1994 at Bogandinskaya compressor station (Surgutgasprom) as a part of Coberra-182 upgraded unit. Two compressor shops were upgraded with DG90P engines at Bogandinskaya and Turtasskaya compressor stations. Some compressor stations with actual efficiency of no more then 20% were upgraded with DG90L2 engine (Surgutgasprom & Volgotransgas companies). GPU-10 (GPU10-01) upgrading is held by means replacing DR59L second generation engine rating at 10 MW & efficiency of 27% with DG90L rating at 16 MW. While upgrading new DG90L installation provided housed in the finished serial block from the reserve recourse stock. They perform upgrading or replacement of the blower supercharger, complex air cleaner, gas exhaust path, automatic control system, as well as ventilation, fuel & lubrication systems changes. At Vyngapurovskaya compressor station there's also a shop equipped with upgraded GPU16-16S units powered by DG90L2. DG90L2 engnes as part of new gas pumping units are used by gas transportation & production companies of Ukraine, Russia, Belarus, Turkistan (over 50 engines? As well as to power ammonia compressors at Odessa Port Plant (two engines). "Zorya"-"Mashproekt" has totally produced over 140 UGT15000 engines in different modifications. The leading engines at Surgutgasprom compressor station have accumulated over 37.00 fire hours.

Noise killer Inlet air filter

Gas turbine engine

GTE cooler

Luboil unit

Supercharger GTE container

The gas pumping unit diagram

Gas pumping unit GPA-16C driven by UGT15000 gas turbine

Container with ammonia compressor driven by UGT15000 gas turbine at Odessa Port Plant

Bt their design & parameters turbines of UGT16000 family (DR59, DJ59) are of the second generation, but they have proved themselves as the most reliable at the gas pumping stations. 10MW DR59 with efficiency of 28% is used in GPU-10 & GPU-10-01. Zorya-Mashproekt and KRTZ VOSKHOD have produced 536 turbines totally. The leading DR59 turbines have accumulated over 100000 firing hours. DJ59 with efficiency 30% and rated power 16MW is used in GPU-16 developed by Ukrainian company FRUNZE. Totally over 120 units like this have been manufactured. Beginning in 1992, DH59L2 have been widely used for replacing out-of-date drives while upgrading GTC-10-4 & GPU-25/76 units developed by Nevskiy Zavod from St. Petersburg, Russia, and replacing COBERRA-182 gas generator from Cooper-Rolls company. 33 DJ59L2 turbines are working in the upgraded units at 9 compressor stations of Permtransgas ltd and Vologotransgas ltd companies.

Gas pumping unit GPU-16A

UGT25000 fourth generation gas turbine also has several versions of power turbines in speed & rotation direction: DN80L with speed of 3300 rpm is used for upgrading GPU-25/76 at Ukrainian & Russian gas pipelines as well as at underground gas storages in Gasli (Uzbekistan). DI80P with speed of 4850 rpm & right rotation is intended to replace MS5003 engines (manufactured by General Electric) in GTC-25I units produced Nuovo Pignone. DU80L with speed 4850-5000 rpm and left rotation is intended for URAL GPU-C-25 and GPU-25C gas pumping units manufactured by Russian company ISKRA and Ukrainian company FRUNZE. Over 40 DN80L gas turbines have been produced and leading turbine has been accumulated over 28000 firing hours. Gas pumping unit GPA-26/76 modernization project with using of DN80L gas turbine

Sofievskaya compressor station, Ukraine

Modernized GPA-25/76 gas pumping in the Sofievskaya compressor station engine room

Sophisticated Cycle Installations For Gas Pumping


It increases efficiency & power of the units, decreasing contaminant emission in combustion products. Thus, 16MW gas pumping unit GPU-16K driven by UGT10000 gas turbine working in a heat recovery unit of Aquarius type with energetic & ecological steam injections and water recovery from combustion products. First GPU-16K is in service at Stavischi compressor station, Cherkassytransgas, Ukraine. The merits of the Aquarius are high efficiency up to 43% in ISO condition and low emission. The Nox emission levels for 25MW installation equal to 25 ppm at rated power and for 16MW installation they are 35 ppm. CO emissions amount to 30 ppm. The steam generated in the waste heat recovery boiler is used for generating additional power and for Nox/CO suppression down to 25/30 ppm. In the contact condenser, which is installed at the top of the waste heat recovery boiler water condensation and recovery out of the steam and gas mixture occur. The Aquarius type installations are capable of generating additional fresh water as a result of chemical reaction by fuel burning in the gas turbine when the cooling water in the installation inlet is lower than 30 centigrade. An experimental 25 MW Aquarius installation has been successfully operates since 1995 and has accumulated over 10000 working hours at the Zorya-Mashproekt test facility.

AQUARIUS Installation Diagram

Exhaust gas Cooling water Condansate Fuel Feed water

Ecological STIG Air

Energetical STIG

Steam-Gas Mix

1 - gas turbine 2 - waste heat recovery boiler 3 - contact condenser 4 - condensate collector 5 - condensate cleaning unit 6 - feed water tank 7 - water cooler 8 - pump 9 - gas compressor

Ecological STIG

Energetical STIG

UGT10000 (DU70L) gas turbine with STIG

Gas pumping unit GPU-16K at Stavischy compressor station

Interregional Center GASTURBOSERVICE on the repair of gas pumping units


In November 1996 Open JSC GASTURBOSERVICE Interregional Center on overhaul and maintenance of ZoryaMashproekt gas turbine engines being used in gas pumping units was created. Its founders are: Surgutgasprom Ltd., Open JSC Turbomotorworks and GTR PC Zorya-Mashproekt. Available up-to-date technology, highly precise equipment and skilled personnel provide qualitative repair and maintenance of products, being operated in Russia. Moreover, time of repair and transportation charges are being reduced, customs expenses are being excluded. Among the Customers of Open JSC Gasturboserviceare: Yamburggasdobycha, Tumentransgas, Severgasprom, Permtransgas, Uraltransgas, Bashtransgas, Samaratransgas, Tattransgas, etc. Open JSC Gasturboservice performs the repair and maintenance of DR59L, DJ59L, DC59 gas turbine engines for gas pumping units and autonomous power plants. In future Open JSC Gasturboservice plans to carry out the repair and maintenance of Zorya-Mashproekt third and fourth generation gas turbine engines.

Center address: 1, Khutoryanskiy Square, Tyumen-625014, Russia Tel/Fax: (3452) 21-34-74, 21-60-46, 21-09-37 (095) 719-60-99, e-mail: gazts@tyumen.ru

New and up-dating gas pumping units with "Zorya-Mashproekt" gas turbines
Efficiency, % (at station) Initial DE76 GPA-3S "Ural' DT71 GPA-C-6,3 GT-6-750-6 GT-6-750 GTN-6 GTK-10-2 GTK-10-4 GPU-10 GPU-10-1 DI70P DI70L DU70L GTK-10I GT-750-6 GPU-16K"Vodoley" New

Engine Type

Model

Power, MW

Speed, rpm

Units Type

DN70L

DG90L2

DG90P1 DG90P1

GTK-10-2 GTK-10-4 GPA-C-16S GPU-16S GPA-C-16S "Ural" GPA-16 "Volga" GPA-16 "Neva" GPU-16A Coberra-182 GPA STD 12,5

DJ59L2

GPA-16 GTK-10-4 GPA25/16 Coberra-182

DN80L DI80P DU80L

GPA25/16 GTK25I GPA-C-25S GPA-25S "Ural"

15

REFERENCE LIST DR59 for GPU-10, GPU-10-01


Beginning of operation Location
RUSSIA. Total number 284 GPU, total power 2840 MW
1980 1980 1982-83 1982-83 Bashtransgas. Total number 48 GPU, total power 480 MW CS Urgala, Bashkortostan CS Arkaulovo, Bashkortostan CS Polyanzkaya, Bashkortostan CS Sharan, Bashkortostan Volgotransgas. Total number 6 GPU, total power 60 MW 1995 CS Yavasskaya, Mordovia Kavkaztransgas. Total number 21 GPU, total power 210 MW CS Artezianskaya, Kalmykiya CS Zenzelinskaya, Astrakhan region CS Zamyanskaya, Astrakhan region Lentransgas. Total number 9 GPU, total power 90 MW OPCS Torzhok, Torzhok town CS Pikalevo, Leningrad region CS Volhovskaya, Leningrad region Permtransgas. Total number 8 GPU, total power 80 MW 1990 CS Gremyachinskaya, Perm region Samaratransgas. Total number 24 GPU, total power 240 MW 1990 CS Sokovka, Orenburg region Severgasprom. Total number 36 GPU, total power 360 MW CS Nyuksenitsa, Vologda region CS Privodino, Arkhangelsk region CS Urdoma, Arkhangelsk region CS Yubileinaya, Vologda region CS Sheksna, Arkhangelsk region Surgutgasprom. Total number 4 GPU, total power 40 MW 1996 CS Karasulinsraya, Tyumen region Tomsktransgas. Total number 5 GPU, total power 50 MW 1997 CS Kozhurlinskaya Novosibirsk region Tyumentransgas. Total number 91 GPU, total power 910 MW 1982-83 1982-83 1984-86 1985 1985 1990 1992-2002 1993 CS Peregrebnoe, Tyumen region CS Lyalinskaya, Ekaterinburg region CS Bobrovskaya, Tyumen region CS Purovskaya, Tyumen region CS Sosnovskaya, Tyumen region CS N. Komsomolskaya, Tyumen region CS Tayozhnaya, Tyumen region CS N. Ivdelskaya, Ekaterinburg region Uraltransgas. Total number 8 GPU, total power 80 MW CS Dolmatovskaya, Kurgans region hechensgas. Total number 3 GPU, total power 30 MW CS Chervlennaya, Chechnya 16 16 14 12 14 6 6 7 8 5 4 24 8 6 8 8 16 16

Number of gas turbines

1988 1991 1995

7 7 7

1978 1994 1995

3 3 3

1981 1981 1981 1981 1995

8 8 8 8 4

1981

1990

UKRAINE. Total number 44 GPU, total power 440 MW


1981 Donbastransgas. Total number 8 GPU, total power 80 MW CS Novopskov, Lugansk region Kievtransgas. Total number 21 GPU, total power 210 MW CS Romnenskaya, Sumy region CS Zenkovskaya, Sumy region CS Reshetilovskaya, Poltava region 8

1987-98 1987 1987

7 7 7

DR59 (prolongation)
Beginning of operation
1991 1996

Location
Prikarpattransgas. Total number 8 GPU, total power 80 MW CS Golyatinskaya, Zakarpatie region Cherkassytransgas. Total number 7 GPU, total power 70 MW CS Gusyatinskaya, Ternopol region

Number of gas turbines

7 7 8 7

KAZAKHSTAN. Total number 22 GPU, total power 220 MW


1998 1998 1991 CS Akkolskaya, Kaspi area CS Redutskaya, Kaspi area CS Taimanskaya, Kaspi area

UGT16000 (DJ59)
Beginning of operation Location
RUSSIA. Total number 133 GPU, total power 2128 MW
1995 1995 1998 Volgotransgas, 22 GPU, total power 352 MW CS Vyatskaya, Kirov region CS Morkinskaya, Maryi El Republic CS Pilnenskaya, Gorky region Permtransgas, 48 GPU, total power 768 MW CS Dobryanskaya, Perm region CS Ocherskaya, Perm region CS N. Kungurskaya, Perm region CS Almaznaya, Perm region CS Agryzskaya, Perm region CS Vavolzhskaya, Perm region CS Igrinskaya, Perm region CS Ordinskaya, Perm region 8 (3 modernization GPA-25/76) 8 (3 modernization GPA-25/76) 6 (GPU-16)

Number of gas turbines

1991-1994 1991 1992-1993 1993-1994 1994 1994 1996 1997--2000

7 (3 modernization GPA-25/76) 5 (GPU-16) 8 (GPU-16) 10 (GPU-16) 5 (modernization GTK-10-4) 5 (GPU-16) 5 (GPU-16) 3 (modernization GTK-10-4)

1995-1997

Tattransgas, 9 GPU, total power 144 MW CS Shemordan, Tatarstan

9 (6 modernization GTK-10-4, 3 modernization GPA-25/76)

1990-2002

Tumentransgas, 10 GPU, total power 160 MW CS N. Komsomolskaya, Tumen region

10 (GPU-16)

1995 1995 1997 1997 1998 2000

Yamburggasdobycha, 30 GPU, total power 480 MW DCS-1, Yamburg DCS-6, Yamburg DCS-2, Yamburg DCS-5, Yamburg DCS-3, Yamburg DCS-7, Yamburg

5 (GPU-16) 5 (GPU-16) 5 (GPU-16) 5 (GPU-16) 5 (GPU-16) 5 (GPU-16)

UKRAINE. Total number 8 GPU, total power 128 MW


1996 Kievtransgas, 4 GPU, total power 64 MW CS Grebenkovskaya, Poltava region Cherkassytransgas, 4 GPU, total power 64 MW CS Stavishchenskaya, Kiev region 4 (GPU-16)

1997

4 (GPU-16)

IRAN. Total number 12 GPU, total power 192 MW


1995 1996-2000 1998-2000 CS X-1, near Farrashband town CS X-2, near Nur Abad city CS X-4, near Zarin Shahr city 3 (GPU-16) 4 (GPU-16) 5 (GPU-16)

UGT3000 (D76)
Beginning of operation Location
CZECH, 1 GPU, power 3 MW 1995 CS Shtremberg 1 (3RS56/3RD56)

Number of gas turbines

UGT6000 (DT71)
Beginning of operation Location
RUSSIA. Total number 3 GPU, total power 18,9 MW 1995 1995 1996 Mostransgas, Total number 3 GPU, total power 18,9 MW CS Gavrilov Yam, Yaroslavl region CS Oktyabrskaya, Stavropol territory CS Tchaplyginskaya, Lipetsk region UKRAINE. Total namber 16 GPU, total power 100,8 MW 1995 2001 1993 Kievtransgas, 7GPU, total power 44,1 MW CS Diranka, Poltava region Prikarpattransgas 7 GPU, total power 18,9 MW , CS Yzhgorodskaya, Zakarpatie region Kharkovtransgas, 2 GPU, total power 12,6 MW CS Kupyanskaya, Khharkov region 7 (GPA-C-6,3S) 7 (GPA-C-6,3S) 2 (modernization GPA-C-6,3S) 1 (modernisation GPA-C-6,3S) 1 (modernisation GPA-C-6,3S) 1 (modernisation GPA-C-6,3S)

Number of gas turbines

UGT10000 (DN70, DU70)


Beginning of operation Location
UKRAINE. Total namber 2 GPU, total power 26 MW 2002 2002 Cherkassytransgas, 1 GPU, power 16 MW CS Stavishchenskaya, Kiev region Cherkassytransgas 1 GPU, power 10 MW CS Kirovogradskaya 1 DU70 (GPU-16K "Vodoley" 1 DN (modernization GTK-10-4)

Number of gas turbines

CS Stavishchenskaya, Kiev region

UGT 15000 (DG90)


Beginning of operation Location RUSSIA. Total number 66 GPU total power 1056 MW 1997 Volgotransgas, 5 GPU total power 80 MW CS Zavolzhskaya, Chuvashiya Noyabrskgasdobycha, 10 GPU total power 160 MW CS Komsomolskaya, Tyumen region CS Gubkinskaya, Tyumen region Surgutgasprom, 33 GPU total power 528 MW CS Bogandinskaya, Tyumen region CS Turtasskaya, Tyumen region CS Vyngapurovskaya-3, Tyumen region CS Demyanskaya, Tyumen region CS Vyngapurovskaya-1, Tyumen region Yamburggasdobycha, 18 GPU total power 288 MW DKS-1, Yamburg DKS-3, Yamburg DKS-6, Yamburg UKRAINE. Total number 6 GPU total power 96 MW Prikarpattransgas, 4 GPU total power 64 MW CS Tarutinskaya, Odessa region CS Dolyna, Ivano-Frankovsk region Odessa Port Plant BELARUS. Total number 5 GPU total power 80 MW CS Nesvizh, Minsk region 5 (modernization GTK-10-4) Number of gas turbines

1998 2002

6 4

1991 1995-2002 1997 1996 2001

5 (modernization GTK Coberra-182) 5 (modernization GTK-10-4) 5 (modernization GTK Coberra-182) 6 6 (modernization GTK-10-4) 6 (modernization GTK-10-4)

2002 2002 2002

6 6 6

2001 2001 1999

3 1 2 "Coberra"

1999

UGT25000 (DN80)
Beginning of operation Location Russia. Total number 15 GPU, total power 375 MW Permtransgas, 6 GPU, total power 150 MW CS Agryzskaya, Perm region CS Ordinskaya, Perm region Tyumentransgas, 9 GPU, total power 225 MW 2002 2002 2002 CS Tayozhnaya-4, Tyumen region CS Tayozhnaya-5, Tyumen region CS N.Komsomolskaya,Tyumen region UKRAINE. Total number 8 GPU, total power 200 MW Kievtransgas, 4 GPU, total power 100 MW CS Romnenskaya, Sumy region CS Grebenkovskaya, Poltava region Cherkassytransgas, 4 GPU, total power 100 MW CS Sofievskaya, Cherkassy region CS Barskaya, Vinnitsa region 3 (modernization GTK-25/76) 3 (modernization GTK-25/76) 3 (modernization GTK-25/76) Number of gas turbines

2002 2002

3 (modernization GTK-25/76) 3 (modernization GTK-25/76)

1998 1998

3 (modernization GTK-25/76) 2 (modernization GTK-25/76)

1995 1998

1 (modernization GTK-25/76) 2 (modernization GTK-25/76)

19
SRDP GC Zorya-Mashproekt also offers:
Industrial and marine gas turbine engines Gas turbine propulsion plants Gas turbine power plants Gas pumping units Fuel and pneumatic equipment for gas turbine engines Waste heat recovery boilers Another tailor-made industrial equipment

Everybody need reliable machines and reliable partners. We make reliable machines.

GTR&PC Zorya-Mashproekt 42a Oktyabrsky prospekt Nikolaev, 54018, Ukraine. Tel. +38 0512 50-90-40, 50-25-61, 55-69-92, Fax +38 0512 50-90-50, 55-68-68