Sie sind auf Seite 1von 8

IBM SCPM Replenishment - Receipts

August 20, 2011

2004 E2open. All Rights Reserved.

Receipt Types
There are two Receipt types: 1. Site Goods Receipt (in the Pull and Bypass cycles) States:
Complete without Data No checking performed and state is changed Complete with Data Mandatory fields checked for completion before state is changed to On-Site Goods Receipt

2. RSC Receipt - from the Hub to the Supplier as part of the Refill Cycle
States:
Complete without Data No checking performed and state is changed Complete with Data Mandatory fields checked for completion before state is changed to RSC Receipt

Receipts are usually created via S2S, but can be created via the UI You can create a Receipt against a: 1. Pull 2. ASN 3. Item (stand alone)
SCPM August 20, 2011 2

Site Goods Receipt


Can have multiple line items IBM sends to E2open via S2S Note: Functionality exists to manually create via E2open UI, but under normal circumstances, do not do this RSC can view via E2open UI Always references the original Pull Request and RSC GI, except for Unassigned Pull Request

SCPM

August 20, 2011

RSC Receipt
Has only one line RSC sends to E2open via S2S (functionality exists to manually creates via E2open UI, but all Hubs are S2S)

SCPM

August 20, 2011

Accessing a Receipt

1. Follow the Menu Path: Receipts Receipts page.

Search Receipts to access the Search

2. Enter your search criteria and click the Search button to access the filter the Results list.
SCPM August 20, 2011 5

Accessing a Receipt

1. From the Receipt List page, click the Receipt number you want to access.

SCPM

August 20, 2011

Navigating the Receipt Page

A B

From the State drop-down menu, choose the state of schedules (A) you want to view and then click the Filter button (B)

SCPM

August 20, 2011

Receipt Email Alerts

Cycle Refill Cycle

Alert Type Detail Errors for SD / RSC GR Record CS

Selection

SCPM

August 20, 2011

Das könnte Ihnen auch gefallen