Sie sind auf Seite 1von 1

MONTHLY RETURN OF STATUS OF 18 NOS LIFT AT HYDERABAD ESTATE NEPEAN SEA ROAD MUMBAI

MONTH-APRIL-2005 DIVISION:MCED-I
Sl No Name of the building No of Make Lift ID Number Normal Duration Duration of Failure of Lift Duration Reason For Break Down
Floor of Operation For Which Service
Served Was
Unavailable
From To Date From To
1 HYD.ESTATE-A G+8 OTIS ED-I-HY-E-A-O-I 24 hrs NIL
2 HYD.ESTATE-A G+8 OTIS ED-I-HY-E-A-O-II 24 hrs NIL
3 HYD.ESTATE-B G+8 OTIS ED-I-HY-E-B-0-I 24 hrs 11-4-05 7.00P.M 8.00 P.M 1.00hr 5th floor door lock not working.
4 HYD.ESTATE-B G+8 OTIS ED-I-HY-E-B-0-II 24 hrs NIL
5 HYD.ESTATE-C G+8 OTIS ED-I-HY-E-C-O-I 24 hrs NIL
6 HYD.ESTATE-C G+8 OTIS ED-I-HY-E-C-O-II 24 hrs NIL
7 HYD.ESTATE-D G+6 OTIS ED-I-HY-E-D-O-I 24 hrs NIL
8 HYD.ESTATE-D G+6 OTIS ED-I-HY-E-D-O-II 24 hrs NIL
9 HYD.ESTATE-E G+6 OTIS ED-I-HY-E-E-O-I 24 hrs NIL
10 HYD.ESTATE-E G+6 OTIS ED-I-HY-E-E-O-II 24 hrs NIL
11 HYD.ESTATE-F G+12 OTIS ED-I-HY-E-F-O-I 24 hrs NIL
12 HYD.ESTATE-F G+12 OTIS ED-I-HY-E-F-O-II 24 hrs NIL
13 HYD.ESTATE-G G+12 OTIS ED-I-HY-E-G-O-I 24 hrs NIL
14 HYD.ESTATE-G G+12 OTIS ED-I-HY-E-G-O-II 24 hrs NIL
15 HYD.ESTATE-H G+14 B.BJLEE ED-I-HY-E-H-B-I 24 hrs NIL
16 HYD.ESTATE-H G+14 B.BJLEE ED-I-HY-E-H-B-II 24 hrs NIL
17 HYD.ESTATE-APT G+12 OTIS EDI-HY-E-APT-O-I 24 hrs 11-4-05 6.30 P.M 7.00P.M 1/2 hr 7th floor door lockcontact not working.
18 HYD.ESTATE-APT G+12 OTIS EDI-HY-E-APT-OII 24 hrs 11-4-05 6.30 P.M 1.00PM 18.50 hr Transformer problem.Replaced next day.

Das könnte Ihnen auch gefallen