Sie sind auf Seite 1von 1

HOMEWORK

answer A B C D
C A weight of 350 tons is loaded on your vessel 85 feet forward of the tipping center. The vessel's MTCT is 1150 tminch. What is the total change of trim? Your vessel's draft is 24'-06" forward and aft. The MTCT of your vessel is 1000 tminch. How many tons of cargo must be loaded in number 4 hold, which is 100 feet abaft the tipping center, if she is to have a 2 foot trim by the stern? Your vessel's draft is 16'-00" fwd. and 18'-00" aft. The MTCT is 500tminch. How many tons of water must be shifted from the after peak to the forepeak, a distance of 250 feet, to bring her to an even draft forward and aft? A vessel's mean draft is 29'-07". At this draft, the TPI is 152mts/inch. The mean draft after loading 1360 tons will be __________. Your vessel has a forward draft of 26'-11" and an after draft of 29'-07". How many tons of cargo can be loaded before the vessel reaches a mean draft of 28'06" if the TPI is 69mts/inch? 12.93 inches 23.75 inches 25.87 inches 38.50 inches

120 tons

240 tons

300 tons

480 tons

52 tons

50 tons

48 tons

24 tons

29'-09"

29'-11"

30'-04"

30'-07"

204 tons

207 tons

210 tons

213 tons

Das könnte Ihnen auch gefallen