Sie sind auf Seite 1von 8

LOGICAL CHANNELS

TRAFFIC SIGNALLING

FULL RATE HALF RATE


Bm 22.8 Kb/S Lm 11.4 Kb/S
BROADCAST COMMON CONTROL DEDICATED CONTROL

FCCH SCH BCCH


RACH
PCH AGCH
FCCH -- FREQUENCY CORRECTION CHANNEL
SCH -- SYNCHRONISATION CHANNEL
BCCH -- BROADCAST CONTROL CHANNEL
PCH -- PAGING CHANNEL
RACH -- RANDOM ACCESS CHANNEL SDCCH SACCH FACCH
AGCH -- ACCESS GRANTED CHANNEL
SDCCH -- STAND ALONE DEDICATED CONTROL CHANNEL DOWN LINK ONLY
SACCH -- SLOW ASSOCIATED CONTROL CHANNEL BOTH UP &
FACCH -- FAST ASSOCIATED CONTROL CHANNEL UPLINK ONLY DOWNLINKS
My Department
 Team of 23 Engineer and 6-8 trainees. Team is supervised by
Er.Nitesh Suri.
 Working round the clock 365days,24x7.
 Three shifts in a day each comprising of three engineer and
two trainees.
 Managing more than 1150 sites of five states:
 Punjab.

 Haryana.

 Himachal Pradesh

 J&K

 Rajasthan.
3.ALARM MONITORING
8.OUTAGE REPORT
1.Open Cellular Network
Administration (CNA).

Configuration
management

Network
Administration
(CNA)
New site checklist
New Site Checklist

Site Name: Date:


Commissioned by:
OMC Co-ordinator
Remarks/Results
GENERAL DATA
Site ID
CGI Value
Configuration
TG Number
DIP Name
Cell Definition in Switch
BSC/RBSC

FREQUENCY/HOPPING DATA
BCCH TCH HSN MAIO Hopping Type
a) SectorA
b) SectorB
c) SectorC

GENERAL PARAMETERS
BCCH Transfer Call test DTX U/L DTX D/L
a) SectorA
b) SectorB
c) SectorC

DEFINITIONS
a) MGCEP
b) MGOCP
c) RLDEP
Emergency Area
STATISTICS
DROP1 DROP3 ICM Intercell Handover
Clockwise Anticlockwise
a) SectorA
b) SectorB
c) SectorC
(Stat report after 15 min to be attached)

POWER RELATED INFO


BSPOWER(RLCPP)
ERP(RLLOP)

CHANNEL INFORMATION
RLSLP
a) LVA
B) ACL
ALARMS
a) Internal Alarms

b) External Alarms
Door Open
Fire/Smoke
Temp High
Mains Fail
DG On
DG fail to start
DG fail to stop
LLOP
Fuel level low
AC1 Faulty
AC2 Faulty
Alarms for RBS 2206 only
Rectifier faulty
Battery Voltage Low

Das könnte Ihnen auch gefallen