Beruflich Dokumente
Kultur Dokumente
750
4500
3000
45
Rate
(Tk)
6
24
1.5
150
Amount
(Tk)
23.4
108000
4500
6759
cft
cft
cft
cft
cft
cft
cft
cft
460
550
1000
90
190
17
400
75
250
250
250
250
250
250
250
250
115000
137500
250000
22500
47500
4250
100000
18750
Column
kg
Beam[GF Roof Slab]
kg
Slab[GF Floor Slab]
kg
Stair
kg
Lift Core & Shear Wall
kg
Guard,Entry-Lin & F.Slab etc
kg
Col+Footing+G.B of boundary wall+Coping etc
kg
Rod for Car parking,apron,main entry etc
kg
3238
2237
5208
350
335
1000
1200
130
75
75
75
75
75
75
75
75
242850 15'+Lap
167775
390600
26250
25125
75000
90000
9750 Lift Lobby+G.room
1100
3450
700
2600
2850
4150
520
3572
700
3318
160
4
2
2
55
1
100
50
50
100
125
2900
60
13.5
13.5
13.5
12
12
100
9
9
9
20
10000
5000
1500
400
110000
135
130
330
330
95
100
SL
1
2
3
4
Description
Earth Cutting(Boundary:Footing & GB.)
Brick Flat Soling(inc. boundary wall etc)
Polythene(inc. base wall,parking etc)
C/C casting-GF/RCC casting (0"-4" Th)
Unit
Qty
cft
sft
sft
cft
Remarks
Column(R::1:1.5:3)
Beam[GF Roof Slab(R::1:2:4)]
Slab[GF Roof Slab(R::1:2:4)]
Stair[(R::1:2:4)]
Lift Core & Shear Wall (R::1:2:4)
Guard,Waiting,Society -Lin & F.Slab etc
Col+Footing+G.B of B.wall+Coping etc
Car parking,apron,main entry etc
Reinfocement work
7.1
7.2
7.3
7.4
7.6
7.7
7.8
7.9
Finishing work
8
9
10
11
12
13
14
15
16
17
18
19
21
22
23
24
25
26
27
27
28
sft
sft
sft
sft
sft
sft
sft
sft
sft
sft
sft
Nos
Nos
Nos
sft
nos
sft
sft
sft
sft
sft
sft
Total:
66000
46575
9450
35100
34200
49800
52000
32148
6300
29862
3200
40000
10000
3000
22000
110000
13500
6500
16500
33000
11875
290000
2763142
7590.00
G.Room
Entry01
Entry02
Page 2 of 23
6.92
11
8.75
S-Dim
12.75
12.75
7.16
12.58
5.67
Space
Kg
6.00 212.27
6.00 577.10
6.00 212.87
1002.24
L-Dim
7.50
21.50
SFT
95.63
274.13
Remarks
Reception
Lift & Lobby
Page 3 of 23
Nos
Size
S-D
L-D
Floor
Area
Beam(10x20)
2 Beam(12x20)
Beam(10x18)
1
1
1
10
12
10
2144
20 1.388889
20 1.666667
18
1.25
Col-C1a
Col-C1b
Col-C1c
Col-C2b
Col-C3
3
Col-C4
Col-C5a
Col-C5b
Col-C6
Col-C7
2
1
1
1
1
2
1
1
2
4
10
10
15
10
10
10
10
12
10
10
20
20
15
25
30
35
30
25
40
20
4 Lift W-01
10
60
Lift W-02
10
52
B/W Footing
B/W Column
B/W G.Beam
Coping
30
10
10
6
30
10
12
10
F.S-01[M.B-1]
125
F.S-02[M.B-2]
50
F.S-03[Com.]
68
F.S-04[Ser]
20
F.S-05[C.B]
53
F.S-06[Ver]
24
6 Lintel[ upto5']
Lintel[abov5']
7
8
16
16
15
15
Drop Wall
Stair
5
5
2
6
10
Thik/Ht
Len/Per
5.00
135.00
23.00
258.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
10.00
10.00
Vol
893.33
187.50
38.33
322.50
548.33
41.67
20.83
23.44
26.04
31.25
72.92
31.25
31.25
83.33
83.33
445.31
3% wastage
920.13
564.78
458.67
10
12
10
10
123.03
83.33
133.33
125.00
62.50
404.17
4.00
41.67
4.00
16.67
4.00
22.67
4.00
6.67
4.00
17.67
4.00
44.00
117.00
4.00
230.00
8.00
113.33
9.17
40.63
49.79
153.33 all peri
82.84
116.73
51.29
157.93
85.33
Type
Pave Tiles
Area
2900
SL
Room
Remarks
From Cad
Venti
Stair
Lobby
Reception
Pr/L
Floor
Recep-01 Skirt
Floor
Toi 01 Wall
Floor
Toi 02 Wall
Floor
Cabinet Skirt
Floor
Skirt
Wall
Trade
Stair
Skirt
Stair
Riser
Landing Floor
Lobby
Lift wall
Ht/W
Area
12.16
33.66
4.16
17.82
5.5
21
3.25
16.5
4.67
0.5
4.75
7
5
7
5
3
56.7872
16.83
19.76
124.74
27.5
147
16.25
49.5
18.42
30
5.58
16
32.5
10.5
8.5
5
0.5
15
3.83
0.5
3.83
4.5
92.1
15
83.7
122.56
16.25
80.43
38.25
1.5
1.5
Venti
W
Door01
W
Door02
H
W
1.5
2.5
1.5
2.5
Win-01
H
W
Win-02
W
Remarks Area
Floor
56.7872
16.83
19.76
Area
Wall
Toi
Floor
19.76
139.99
27.5
4.5
7.0
27.50
162.25
9.3
16.25
49.5
187
92
15
3.0
302.24
62.7
123
16
80
38
365
62.7
47.3
Toi
Border
17.82
21.00
38.82
Brick Works
Type
Brick Soling
Boundary Wall
Height
8
Length
153.67
Area
Thick
2900
1229.36
4129.36
Type
Height
Length
CC Casting
Area
Thick
2900
Exterior Paint
Type
Boundary Wall
Reception
Height
9.5
Length
153.67
Area
2919.73
200.00
3119.73
Thick
k Works
Vol
Remarks
From Cad
Vol
Remarks
725
From Cad
Vol
Remarks
rior Paint
Type
CC Casting
Height
Length
Area
2900
Thick
3
Vol
725
Remarks
From Cad
SL Room
Name
South
wall (L)
North
East
west
Door (L) Window Veranda
Wall (L) Wall (L) Wall (L)
(L)
/open(L)
15.00
10.50
5.00
Gard Room(Total)
13.58
Ded.n
Ded.n
Ded.n
Bath Room 13.50
1(Tot.)
Ded.n
Bath Room 8.50
2(Tot.)
Ded.n
Gard Post (Total)
21.50
Ded.n
Ded.n
Column (Front
5.25si.)
Boundary Wall
11.83
61.17
2.50
2.50
2.50
2.50
89.50
16.25
11.33
2.50
1.67
1.67
9.50
9.50
2.50
9.50
2.50
9.50
7.00
9.50
9.50
9.50
7.00
2.00
9.25
9.50
2.00
9.50
7.00
8.00
7.00
2.00
9.25
8.00
8.00
8.00
5.00
5.00
152.76
19.00
6.25
57.00
7.50
156.75
105.00
99.75
47.50
129.01
17.50
23.13
128.25
3.34
80.75
17.50
172.00
17.50
3.34
48.56
1105.08
716.00
94.64
489.36
81.25
56.65
1437.90
187.31
917.78
10"
D.duct
Remark
Nos
Thik/Ht
Len/Per
S.Area
Beam(10x10)
10
10
Beam(10x15)
10
15
Beam(10x18)
10
18
2
1
1
2
1
1
2
1
1
2
4
18
2
1
10
10
15
10
10
10
10
10
12
10
10
20
20
15
25
25
30
35
30
25
40
20
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
15.00
150.00
75.00
75.00
1
1
60
52
15.00
305.00
15.00
132.50
Col-C1a
Col-C1b
Col-C1c
Col-C2a
Col-C2b
Col-C3
Col-C4
Col-C5a
Col-C5b
Col-C6
Col-C7
Lift W-01
Lift W-02
Size
S-D
L-D
Drop Wall
135.00
450.00
23.00
95.83
258.00
1204.00
87.50
100.00
225.00
100.00
92.50
250.00
300.00
230.00
460.00
4102
1749.83
1455.00
Upto 2nd FL roof
Upto 2nd FL roof
437.50
460.00 all peri
Size
Nos
S-D
Area
L-D
Floor
2
Stair
2144
8.5
21
1428
Total:
3572
2144.00
Room
Lobby
G.Room
Rception
Toi
Door01
W
Door02
W
W.D Nos
7 2.5
7 15.0
7 2.5
2.5
P.D
Nos
Area(W)
42.0
35.0
1.0
7
2.5
2.0
77.0
Frame (rft)
Main Frame (rft)
Enamel paint (Door shutter)
154.00
Enamel paint (Door shutter)
0.00
Area(P)
Area(G)
Remarks
Frame
34.0
33.0
105.0
Sliding
35.0
35.0
Plastic
67.0
Face
2
Length
Ht
154
Area
8.5
2618
3572
700
3318