Sie sind auf Seite 1von 2

EASTERN REGIONAL LOAD DESPATCH CENTRE

. 303 6-Dec-11

TO

1) 2) 3)

DY.SECY, MOP; N.DELHI ( FAX NO. 011-3717519/ 3731266) CEO, POSOCO / NPSD CONTROL ROOM MEMBER SECRETARY,ERPC / CE(GM),CEA,N.DELHI 011-26109750 (O) 5-Dec-11

DATE :

POWER SUPPLY POSITION FOR EASTERN REGION FOR 1) REGIONAL GEN & DEMAND

REGIONAL GENERATION (MW) REGIONAL AVAILABILITY (MW) REGIONAL EXPORT (MW) DEMAND MET (MW) EXCESS (+)(MW) / SHORTFALL(-) (MW) UNRESTRICTED DEMAND(MW) FREQUENCY (HZ) 2) FREQUENCY PROFILE FOR 5-Dec-11 <49.5 Hz
23.20

5-Dec-11 at 09:00 Hrs 12071 12071 2195 9876 -992 10868 49.70

5-Dec-11 at 18:00 Hrs 13768 13768 1781 11987 -1027 13014 49.79

. 6-Dec-11 at 09:00 Hrs 12058 12058 1824 10234 -788 11022 50.02

FREQUENCY (HZ) % AGE OF TIME . MAX FREQ(06:03HRS.) MIN FREQ(11:16HRS.) 3) VOLTAGE FOR STATION MAXIMUM MINIMUM 5-Dec-11 400 KV ( ROURKELA ) KV AT HRS 425 2:00 420 10:00 ACT. ENERGY (MU)
7.591 6.248 -0.396 34.478 47.921 45.937

49.5 - 49.7 Hz 49.7 - 50.2 Hz


46.60 29.90

>50.2
0.30

50.29 49.07

AVERAGE FREQUENCY FVI

49.62 1.74

400 KV ( BINAGURI ) KV AT HRS 429 0:00 411 18:00 MAXIMUM (MW)


597 532 466 1894 1935

220KV ( SILIGURI ) KV AT HRS 242 1:00 229 18:00 MAXIMUM MW FLOW

400 KV ( MUZ'PUR ) KV AT HRS 435 0:00 416 18:00

400 KV( N PURNEA ) KV AT HRS 420 1:00 411 18:00

4)

REGION NER SR WR NR TOTAL SR( TALCHER - STAGE- II)

MINIMUM (MW)
210 -129 -658 970 1870

2625 MW 14:40 HRS.

5)

SYSTEM WISE LOAD SHEDDING : SYSTEM LOADSHED(09:00 HRS) LOADSHED(09:00 HRS) LOADSHED(18:00 HRS) FOR DATE 6-Dec-2011 5-Dec-2011 5-Dec-2011 BSEB 350 600 300 JSEB 38 142 177 DVC 0 0 0 GRIDCO 400 250 500 WBSEB+CESC 0 0 50 TOTAL 788 992 1027 REMARKS

6)

MAJOR GEN. OUTAGE FOR ISGS AND CONSTITUENTS(200MW & ABOVE). No. STATION UNIT NO CAP(MW) DATE 8 1 CTPS 250 13.09.11 8 2 MEJIA 500 08.11.11 1 3 TALCHER 500 09.11.11 5 4 KAHALGAON 500 21.11.11 2 5 MEJIA 210 25.11.11 3 6 KOLAGHAT 210 26.11.11 1 7 STERLITE 600 27.11.11 1 8 MPL 525 27.11.11 2 9 TENUGHAT 210 29.11.11 6 10 SANTALDIH 250 03.12.11 3 11 STERLITE 600 05.12.11 4 12 KOLAGHAT 210 05.12.11 4 13 BAKRESWAR 210 05.12.11 14 BOKARO B 3 210 07.12.11

TIME(Hrs)

REASONS FOR OUTAGE

Expected date of Restoration

16:35 21:15 16:16 0:00 21:24 4:13 0:57 1:44 5:25 13:04 0:24 10:30 20:12 0:13

HP CONTROL VALVE PROBLEM COAL SHORTAGE OVER HAULING COAL SHORTAGE COAL SHORTAGE OVERHAULING
CONDENSOR PUMP TRIPPED

08.12.11
AVAILABILITY OF COAL

15.12.11
AVAILABILITY OF COAL AVAILABILITY OF COAL

31.12.11 08.12.11
07.12.11 AVAILABILITY OF COAL 08.12.11

DRUM LEVEL VERY HIGH COAL SHORTAGE TUBE LEAKAGE


LEAKAGE IN SUPER HEATER SPRAY LINE

SUPER HEATER TUBE LEAKAGE TUBE LEAKAGE MAINT.

09.12.10 07.12.11
07.12.11 25.12.11

7)

LINE OUTAGES:NO. LINES DATE 2005 04.09.11 10.05.11 15.09.11 31.10.11 03.12.11 29.10.11 04.11.11 07.11.11 10.11.11 28.11.11 29.11.11 29.11.11 07.12.11 REASONS FOR OUTAGE TOWER COLLAPSE & CONDUCTOR THEFT
OPEND DUE TO O/L OF 220KV BUDHAPADAR-KORBA D/C.

Expected Date of Restoration NO DEFINITE PROGRAME 15/12/2011 Feb-12 SUBJECT TO VOLTAGE CONDITION SUBJECT TO VOLTAGE CONDITION SUBJECT TO VOLTAGE CONDITION SUBJECT TO VOLTAGE CONDITION SUBJECT TO VOLTAGE CONDITION SUBJECT TO VOLTAGE CONDITION SUBJECT TO VOLTAGE CONDITION SUBJECT TO VOLTAGE CONDITION SUBJECT TO VOLTAGE CONDITION

1 220KV PATRATU - BODHGAYA - I , II & III 2 220 KV BUDHIPADAR - RAIGARH - I 3 400 KV MAITHON - JAMSHEDPUR 4 400 KV TEESTA - BINAGURI - II 5 400KV BINAGURI- TALA - II 6 400KV BINAGURI - TALA - IV 7 400 KV ROURKELA - RAIGARH - IV 8 400 KV MAITHON - RANCHI - II 9 400 KV BINAGURI- PURNEA - II 10 400 KV RANCHI - SIPAT - I 11 400 KV ROURKELA - RAIGARH - I 12 400 KV BINAGURI- PURNEA - IV 13 400KV BARH - BALIA - II 14 400KV MUZAFFARPUR-GORAKHPUR-II

S/D FOR CONSTRUCTION OF MULTICKT TOWER

S/D TILL PERMANENT RESTORATION OF TOWER ISOLATOR PROBLEM AT TALA END/SD O/V OPENED O/V OPENED TRIPPED ON O/V O/V OPENED O/V OPENED O/V OPENED O/V OPENED O/V TRIPPED O/V OPENED

STATION FARAKKA KHSTPS STG - I KHSTPS STG - II


TALCHER STG - I

EFFECTIVE CAPACITY (MW) 1489 765 1385 935

DECLARED CAPACITY (MW) 1520 710 700 470

REMARKS

U#5 IS OUT BAR U#1 IS OUT OF BAR


`

IMPORTANT EVENTS :

SCM, ERLDC

Das könnte Ihnen auch gefallen