D/AICO/6----/1433 January 10, 2012

M/s Saudi Electricity Company SEC EOA P.O. Box:5190 Dammam-31422, Kingdom of Saudi Arabia
Attention to: Mr. Bader N. Al-Mansour /Division Manager/CTAPD/EHVPD

Subject: Gentlemen,

FAT FOR HVAC EQUIPMENTS FOR EPC OF JUBAIL COMMUNITY-2 ( 8AB ) 380/115 KV BSP CONTRACT # 564-C27 (RC)

With reference to SSEM, request to carry out inspection of above captioned equipment; we are pleased to inform you that the inspection was carried out for the above captioned equipment at M/s SKM Factory - Sharjah (UAE) on December 15, 2011 and January 8, 2012. A detailed report with the complete required documents is attached herewith for your kind attention. Trust that all attached shall meet with your requirements. For any inquiry or clarification please do not hesitate to give us a call back, we shall be more than happy to assist you. Thanking you, With best regards, For Arab Inspection & Q. A. Co. - AICO Dr. O. M. Alomar/G.M. ********* CC: ROYAL COMMISSION /JUBAIL Attn: Mr. Akhtar A. Choudry / Facilities Contracts Supervisor CC: M/s Saudi Services for Electro Mechanic Works Co. Ltd (SSEM) Attn: Mr. Umesh Malaviya / Project Manager

AICO Job No.: 4/T/2/S/ Report No.: SEC/RC/SSEM/SKM/01

Job for: Saudi Services for Electro Mechanic Works Co. Ltd (SSEM) Manufacturer: SKM Factory Sharjah (UAE)

For additional information, contact: Eng. F. H. AL-IMAM Description of the job Notification No. Dated Duration Place of Intervention Date(s) of Intervention(s) Type of Performed Controls Inspected Items : : : : : : : : Third Party Final Inspection Emails December 5, 2011 02 Days SKM Factory Sharjah (UAE) December 15, 2011 and January 8, 2012 Visual Inspection + Functional Tests + Electrical Tests Packaged Air Condition Units, Model # PACF-6070 RM, PACU 3 & 4 PACF 6140 RM, PACU 5 & 6 PACF 6140 RM, PACU 1 & 2 Total 06 Units Conclusions This report contains _____ Pages

Quantity Distributions:

Eng. Azizullah Khan AICO Inspector

Inspection and testing of subject PACU gave acceptable results as per applied specifications, refer to comments and manufacturer reply on page no.2 of report. Recommendation for shipmen release is issued for client approval. Eng. Fadul Al-Imam
Technical Manager

Page 1

INSPECTION REPORT
CLIENT PROJECT : Saudi Electricity Co, Eastern Operating Area (SEC-EOA) : EPC of Jubail Community-2 ( 8AB ) 380/115 kv BSP

CONTRACT # CONTRATOR MANUFACTURER MATERIAL

: 564 - C27 (RC) : Saudi Services for Electro Mechanic Works Co. Ltd (SSEM) :SKM Sharjah- UAE :AIR CONDITIONING PACKAGE UNITS

PLACE OF INSPECTION :SKM Sharjah- UAE DATE OF INSPECTION : December 15, 2011 and January 08, 2012 -------------------------------------------------------------------------------------------------------------1. INSPECTED ITEMS: 06 AIR CONDITIONING PACKAGE UNITS (02) units for model # PACF-6070RM and (04) units for Model PACF- 6140 RM 2. SPECIFICATION APPLIED: Tests were carried out according to the followings: - SEC Specification # 73-TMSS-1 & 01-TMSS-01, PTS -07EN305 - Technical Submittal / Standard Catalogue. - Vendor ITP SCOPE OF INSPECTION The following activities were carried out as per vendor ITP and applied relevant documents. Documents Review, Control Functional / Run test, HI POT TEST, Nameplate Verification and Final Visual Inspection::
3.1

One unit of TAG # PACU 4 and one unit of TAG # PACU 6, and one unit TAG# PACU 1 were selected for witnessed testing. For other 03 unit factory test records were reviewed. 1. 2. 3. 4. Visual Inspection for Marking / Models / Ratings. High Pot (Megger) Test. Functional Test for Blowers, Fans & Compressors. Functional Test for Valves gauges and Pressure Switches.

The following tests were performed on:

Page 2 5. Measurement of Motors Currents. 6. Inspection of Electrical Control Panel. 7. Review of Factory Test Records. INSPECTION RESULTS AND COMMENTS: Below were the inspection comments and SKM reply, which were required as per 73 TMSS-1, Technical Submittal. INSPECTION COMMENTS:

1. Each Unit should be provided with an integral control panel in NEMA 4, enclosure ( SEC Request ), SKM confirmed that enclosure is NEMA 4, could not be confirmed). 2. For PACU 1, 2, 5 & 6, unit model mentioned in selection sheet and data schedule, as PACF 6140 RM, whereas on name plates and factory test records, mentioned as 6140M, without letter R (R shows the power supply as 380 Volts, 3phase, 60hz). 3. In fitted SS, name plate, full information as SEC requirements, not available. ( I remove # 4 it is same as # 3 ) 4. As per clause 4.4.6.h, vendor has to provide two sets of matching fan belts for each unit but could not found. SKM POINTS WISE BELOW REPLIES FOR COMMENTS, 1. SKM complied with NEMA 4 as per SEC Specification# 73-TMSS-01-R0, and SKM confirmation letter that NEMA 4 is complied. 2. There is no difference between them, however it will be corrected in revised name plate 3. Revised Name Plate will be provided at site. 4. Spares of belts Will be provided at Extra (loose items) INSPECTION RESULTS CONCLUSION: - Tests and checks performed gave satisfactory results as shown in attached test certificate. - Unit Color RAL 7038 The inspected 06 PACU units were considered acceptable as per applied specifications. Recommendation for shipment release is issued for client approval. Eng. Azizullah Khan AICO Inspector ******* Attachments 1. Recommendation for Shipment Release. 2. Witnessed Test Results & Factory Test Records. Page 3 Report No.: SEC/RC/SSEC/SKM/01

LIST OF INSPECTED UNITS


06 Package UNITS

S# 1. 2 3

Model Number MODEL- PACF-6070RM MODEL- PACF-6140RM MODEL- PACF-6140RM

Tag # PACU- 3 & 4 PACU- 5 & 6 PACU- 1 & 2

Quantity 02 02 02

Eng.Azizullah Khan AICO-Inspector

Inspection Report Of HVAC For EPC of Jubail Community-2 ( 8AB ) 380/115 KV BSP Contract #564-C27 (RC)