Beruflich Dokumente
Kultur Dokumente
Functional loc.
Description
10186996
JRGH-UT03-BF02-BFLRSTA
10187000
JRGH-UT03-BF02-BFPCIPL
10187185
JRGH-UT03-BF02-BFLRSTA
10187193
JRGH-UT03-BF02-BFSTKHU
Stock House
10187194
JRGH-UT03-BF02-BFSTOVE
10187195
JRGH-UT03-BF02-BFLRSTA
10187254
JRGH-UT03-BF02-BFPCIPL
10187395
JRGH-UT03-BF02-BFSTKHU
Stock House
10188225
JRGH-UT03-BF02-BFPROPE
Furnace Proper
10188250
JRGH-UT03-BF02-BFSTOVE
10188331
JRGH-UT03-BF02-BFSGPAT
10188335
JRGH-UT03-BF02-BFSTKHU
Stock House
10188356
JRGH-UT03-BF02-BFPCIPL
10188357
JRGH-UT03-BF02-BFPROPE
Furnace Proper
10188360
JRGH-UT03-BF02-BF02TOP
Furnace Proper
10188363
JRGH-UT03-BF02-BFPROPE
Furnace Proper
10188364
JRGH-UT03-BF02-BF02TOP
Furnace Proper
10188370
JRGH-UT03-BF02-BFSTOVE
10188608
JRGH-UT03-BF02-BFSGPAT
10188616
JRGH-UT03-BF02-BFPCIPL
10188817
JRGH-UT03-BF02-DEDUSSY
10189799
JRGH-UT03-BF02-BFPCIPL
PCI
10190024
JRGH-UT03-BF02-BFLRSTA
PCM
10190198
JRGH-UT03-BF02-BFPIGCM
PCM
10190691
JRGH-UT03-BF02-BFPCIPL
PCI
10190693
JRGH-UT03-BF02-BFPCIPL
PCI
10190694
JRGH-UT03-BF02-BFSGPAT
10190695
JRGH-UT03-BF02-BFPCIPL
10191430
JRGH-UT03-BF02-BFPCIPL
PCI
PS PUMP TRIPPED
10191439
JRGH-UT03-BF02-BFCASTH
Furnace Proper
10191550
JRGH-UT03-BF02-BFCASTH
Furnace Proper
10191559
JRGH-UT03-BF02-BFPCIPL
10191782
JRGH-UT03-BF02-BFPIGCM
10192027
JRGH-UT03-BF02-BFCASTH
Furnace Proper
10192294
JRGH-UT03-BF02-BFSTKHU
10192296
JRGH-UT03-BF02-BFPCIPL
PCI
PS PUMP TRIPPED
10192649
JRGH-UT03-BF02-HTSS001
10193030
JRGH-UT03-BF02-BFPCIPL
PCI
Long Text
Nature of Problem
Man/Mat/Meth
Req. start
TLC NO-08 CURRENT TAKEN TOO MUCH HIGH ON CHECKING FOUND CURRENT TAKEN ABOVE 40 AMPERE & TRIPPED SO TOLD TO OPERATION THAT TLC WAS JAM. AFTER CHECKED FOUND BREAK SUPPLY NOT COMING AFTER CLEANING THE SOCKET PIN & ONE PIN (11 NO.) CIRCLIP NOT PROPER FIT, SO MADE IT OK. ACCORDING TO OPERATION REQUEST TADLE OPERATE IN DC SUPPLY , IN DC CHECKED FOUND LADLE OPERATED OK.NEED TO CHECK IN AC. 02.11.2011 06:07:24 Vikas Mohan (PMBF203) Phone 07762-227001 3553 CHECKED AT PANEL SIDE AND RESISTANCE BOX CHECKED FOUND NOTHING ABNORMAL. THEN SUPPLY CHECKED AT FEMALE SOCKET FOUND OK (BY SYSTEM ALLOWANCE BYPASS) THEN SYSTEM ALLOWANCE BYPASS REMOVED AND TRAIL TAKEN AFTER POURING AND FOUND SUPPLY COMING AT BREAK BUT IT WAS NOT RELEASING AS MECH PROBLEM. MECH MADE IT OK. THEN TRAIL TAKEN FOUND CURRENT 20-22A AT OTHER PCM AND LRS. (C-SHIFT) VINAY/PRINCE
MECH
11/01/2011
02.11.2011 04:00:04 Vikas Mohan (PMBF203) Phone 07762-227001 3553 PCI CA FAN -2 TRIPPED DUE TO OVERLOAD, ON CHECKING FOUND TRIPPED ON FAULT F-9 OVERTEMP, RESET DONE NOT STATED THE SAME AS MILL-2 JAMMED AT THE SAME TIME. 02.11.2011 06:54:53 Vikas Mohan (PMBF203) Phone 07762-227001 3553 OTHER INCHARGE-VINAYDESHMUKH AND PRINCE SAINI 02.11.2011 23:21:29 Vikas Mohan (PMBF203) Phone 07762-227001 3553 TLC-03 MOTOR TRIPPED DURING CHECKING-AFTER CHECKED ON DATED 31.10.2011 G SHIFT LOAD FOUND NORMAL(20 AMP) <80% MOVEMENT BUT ABOVE IT BOTH DIRECTION CURRENT FOUND >35 AMPS AND TRIPPED O/L.SO WE AGAIN TOLD TO OPERATION PEOPLE OTHER FOR CLEANING TLC JAMMING.---PANKAJ 03.11.2011 06:42:12 Vikas Mohan (PMBF203) Phone 07762-227001 3553 FOC -01 NEED TO TRIAL AS BELT CHANGE AFTER MECHANICAL WORK TRIAL TAKEN IN COUPLING ,AFTER MECHANICAL WORK FOUND 11.5-12.5 AMPERE & IN LOAD FOUND CURRENT 22 AMPERE , SETTING 29 AMPERE. BUT FOUND ZSS COMING , SO CHECKED & FOUND PROXIMITY OF ZSS DAMAGE SO CHANGE THE SAME FROM SPARE , BYPASS REMOVED FROM PANEL SIDE. AFTER TRIAL TAKEN FOUND OK. ........................ABHILASH/SAMIRAN. OTHER 03.11.2011 07:15:27 Vikas Mohan (PMBF203) Phone 07762-227001 3553 CA FAN-01 MOTOR CONNECTION NEED TO OPEN AS BEARING CHANGE BY MECHANICAL. POWER MADE OFF & POWER , RTD, EARTHING CONNECTION OPENED. NOW MECHANICAL WORK UNDER PROGRESS ( 09:00:00 AM TO 10:30:000 AM) CONNECTION DONE IN MOTOR TERMINAL & RTD CONNECTION . PROXYMITY CONNECTION ALSO DONE. AFTER MECHANICAL PERMIT CANCELLED POWER MADE ON, FOUND CURRENT 29-30 AMPERE IN NO LOAD COUPLING CONDITION . VIBRATION SHOWING 6 M/S .TEMPARATURE READING FOUND FOUND NORMAL . ONE EARTHING PLATE NOT CONNECT DUE TO NOT MATCH IN SUPPORT , NEED TO BE MOUNT , POWER MADE ON.(18:30 PM- 21:00 PM). OTHER ........... ABHILAS/SAMIRAN. 03.11.2011 07:30:22 Vikas Mohan (PMBF203) Phone 07762-227001 3553 TLC NO-07 WAS TRIPPED , PCM IN POURING TIME FOUND TRIPPED ON OVER LOAD, AFTER RESET FOUND CURRENT TAKEN >35 AMPERE , SO TOLD TO OPERATE SLOWING . AFTER OPERATOR OPERATE IN INCHING MODE, AFTER LADLE EMPTY & CURRENT GETTING NORMAL AS 20-25 AMPERE ............ABHILASH/SAMIRAN. OTHER 03.11.2011 10:53:13 Vikas Mohan (PMBF203) Phone 07762-227001 3553 COAL LINE V/V -3 CLOSE FAULT IN DISTRIBUTOR ON CHECKING FOUND VALVE NOT FULLY CLOSED , ONCE CLOSE FEEDBACK GIVEN FROM FIELD AFTER OPERATED 4-5 TIMES , AFTER FOUND OTHER NORMAL.
OPER
11/01/2011
OPER
11/01/2011
MECH
11/02/2011
MECH
11/02/2011
MECH
11/02/2011
MECH
11/03/2011
04.11.2011 05:50:07 Vikas Mohan (PMBF203) Phone 07762-227001 3553 RAL -02 of S/H ded tripped so checked found its fan was damagedand dust was imposed on same.so new fan mounting done from spare motor.now trial taken found 1.5 A. OTHER ----------------------------------------PKS,KABIR 08.11.2011 12:38:08 Vikas Mohan (PMBF203) Phone 07762-227001 3553 THERMOCOUPLE WAS CHECKED AND FOUND STUCK WITH THE WELL. SO CUTTING WAS DONE AND DUMMY WAS PROVIDED. OTHER
OPER
11/04/2011
OPER
11/07/2011
08.11.2011 13:37:46 Vikas Mohan (PMBF203) Phone 07762-227001 3553 Hot blast valve-02 not showing open so checked found stricker was not getting up to open proximity of valve so mechanical adjusted the stricker.now trial taken and found system ok. ----------------------kabir, pankaj OTHER 08.11.2011 20:12:49 Vikas Mohan (PMBF203) Phone 07762-227001 3553 C/H A BLOWING BOX VALVE NOT OPEN FROM CONTROL ROOM ON CHECKING FOUND VALVE NOT OPEN MANUALLY , DUE TO MECHANICAL PROBLEM , MECHANICAL WORK DONE . AFTER TRIAL FOUND OK. OTHER 08.11.2011 20:30:33 Vikas Mohan (PMBF203) Phone 07762-227001 3553 BFC-1 1&3 COMBINATION GOT STOPPED BFC-1 MOTOR 1 &3 COMBINATION STOPPED DUE TO PULL CHORD IN LEFT SIDE BY MATERIAL SPILAGE , RELEASE THE SAME BY OPERATOR .AFTER TRIAL 2 & 4 COMBINATION BUT 4 NO. MOTOR NOT STARTED , THEN AGAIN STARTED THE COMBINATION OF 1 & 3 THEN FOUND TIMER STARTED , SO RESET THE TIMER AFTER FOUND 1 & 3 NO. COMBINATION STARTED . AFTER 4 NO MOTOR CHECKED FOUND FIELD SIDE OK. HT BREAKER CHECKED FOUND VAJC 11 RELAY COIL OPEN CONTACT NOT MAKING OF OFF INDICATION , HENCE RELAY CHANGE. AFTER TRIAL TAKEN FOUND OK ( FOR THIS WORK TIME TAKEN 17:00:00 - 17:10:00 ) ............ABHILASH/SAMIRAN. OTHER
OPER
11/08/2011
MECH
11/08/2011
OTHER
11/08/2011
09.11.2011 04:17:07 Vikas Mohan (PMBF203) Phone 07762-227001 3553 PCI COMMON SCREW CONVEYER-2 ZSS FAULT 09.11.2011 04:18:57 Vikas Mohan (PMBF203) Phone 07762-227001 3553 FOUND GAP IS LARGE BETWEEN STRICKER AND PROXIMITY AS MECH WORKED ON SAME PREVIOUSLY. SO GAP ADJUSTMENT DONE AND TRAIL TAKEN FOUND OK. (AGAM, OTHER PRINCE)
MECH
11/07/2011
09.11.2011 04:25:18 Vikas Mohan (PMBF203) Phone 07762-227001 3553 FT-1706S READING SHOWING LOW AS DOUBT BY OPERATION 09.11.2011 04:27:44 Vikas Mohan (PMBF203) Phone 07762-227001 3553 CHECKED AT RIO AND FOUND mA SHOWING 10.9 AND ACCORDING TO mA READING SHOWING OK IN CONTROL ROOM, AT Tx END CHECKING NOT DONE AS APPROCH PROBLEM. STAIR CASE REQUIRED FOR CHECKING WORK. OTHER (AGAM/PRINCE)
OTHER
11/08/2011
09.11.2011 04:58:39 Vikas Mohan (PMBF203) Phone 07762-227001 3553 PRESSURE EQUALISING V/V OPEN FAULT COMING 09.11.2011 05:06:39 Vikas Mohan (PMBF203) Phone 07762-227001 3553 CHECKED AND FOUND STRICKER DISTURBED OF SAME AS IT WAS BENT 09.11.2011 05:07:25 Vikas Mohan (PMBF203) Phone 07762-227001 3553 OTHER ADJUSTMENT DONE OF SAME AND TRAIL TAKEN FOUND OK. 09.11.2011 06:39:31 Vikas Mohan (PMBF203) Phone 07762-227001 3553 ON CHECKING FOUND THAT THE WELL HAS BEEN BENDED. CUTTING OF THE WELL BEEN DONE AND NEW THERMOCOUPLE WITH WELL HAS BEEN OTHER INSERTED (1007MM) 09.11.2011 06:49:45 Vikas Mohan (PMBF203) Phone 07762-227001 3553 CHECKED AND FOUND THE PROCESS POINT JAMMED. PROCESS POINT CLEANING DONE OTHER AND AFTER THAT READING OBSERVED AND FOUND NORMAL.
MECH
11/07/2011
OPER
11/07/2011
OPER
11/07/2011
09.11.2011 07:30:59 Vikas Mohan (PMBF203) Phone 07762-227001 3553 STOVE PROXIMITY JB NEED TO CHANGE JB CHANGING JOB DONE FOR ALL THREE STOVES IN WHICH FOLLOWING VALVES JB REPLACING WITH TERMINATION WORK DONE. AFTER WORK TRIAL TAKEN AND FOUND WORKING OK AS SENCED BY PROXIMITY SENSING. STOVE # 1 BFGIV BFGIV cum VENT BFGSV CASV SPSV STOVE # 2 BFGIV SPSV BFGIV cum VENT BFGSV CASV STOVE # 3 BFGIV BFGIV cum VENT
OTHER
OTHER
11/07/2011
09.11.2011 21:48:32 Vikas Mohan (PMBF203) Phone 07762-227001 3553 C/H B BLOWING BOX VALVE NOT OPEN ON CHECKING FOUND IN VALVE MECHANICAL PROBLEM . THEY WORK AFTER FOUND OTHER OK. 10.11.2011 00:11:05 Vikas Mohan (PMBF203) Phone 07762-227001 3553 TUYERE-3 COAL LINE V/V NOT OPERATING SHOWING CLOSE FAULT, VALVE JAMMED OTHER V/V CLEANING DONE BY MECH, THEN TRIAL TAKEN FOUND OK. 10.11.2011 19:39:10 Vikas Mohan (PMBF203) Phone 07762-227001 3553 DEDUSTING DPT SHOWING HIGHER READING AS PER OPERATION AND MECAHNICAL AND DOUBT ON DP OF SAME.CHECKING DONE FOUND TRANSMITTER SHOIWING READING HIGH BUT CONNECTION AND LINE CHECKED FOUND OK.LATER FUSES OF COMPARTMENT SELECTION AND PULSING SOLENOID CHECKED FOUND WORKING NORMAL. SO TOLD TO OPERATION AND MECHANICAL FOR FURTHER CHECKING.--------------OTHER PANKAJ,ANIK........
MECH
11/09/2011
MECH
11/05/2011
OTHER
11/09/2011
16.11.2011 01:38:46 Vikas Mohan (PMBF203) Phone 07762-227001 3553 PCI CA FAN-2 TRIPPED 16.11.2011 01:41:21 Vikas Mohan (PMBF203) Phone 07762-227001 3553 CHECKED AND FOUND TRIPPED ON OVER TEMP FAULT NO.-9 SO RESET DONE AND MOTOR INSPECTION DONE FOUND NO ABNORMILITY. TRAIL TAKEN FOUND OK. 16.11.2011 01:47:15 Vikas Mohan (PMBF203) Phone 07762-227001 3553 OTHER VINAY/PRINCE
OTHER
11/02/2011
17.11.2011 05:35:51 Vikas Mohan (PMBF203) Phone 07762-227001 3553 TLC-07 NOT OPERATING 17.11.2011 05:37:32 Vikas Mohan (PMBF203) Phone 07762-227001 3553 CHECKED OVERLOAD TRIPPED, CURRENT TAKING HIGH AT STARTING, OPERATED IN INCHING AT STARTING CURRENT BECOMES NORMAL CURRENT OTHER TAKING 23A. 17.11.2011 13:55:19 Vikas Mohan (PMBF203) Phone 07762-227001 3553 MAGNET CRANE 115 T NOT WORKING ON CHECKING FOUND FLUSHING OCCURED NEAR MAGNET , NEAR 2 MTR FROM MAGNET , DUE TO OPERATOR MISTAKE FLUSHING OCCURED . Y PHASE GROUNDED SO SPARE B PHASE USE & TAKEN IN LINE . PANEL & MAGNET SIDE ( BOTH SIDE) CLIMPING & LUGGING DONE . DUE TO THIS FUSE BLOWN & FUSE BASE ALSO MELT , SO FUSE & FUSE BASE ALSO REPLACEMENT DONE . TRIAL TAKEN FOUND OK. OTHER ...................SHIB BAHADUR SINGH/ SAMIRAN KUITY.. 19.11.2011 23:53:59 Vikas Mohan (PMBF203) Phone 07762-227001 3553 CHECKED AND FOUND FLAME WAS LOW INSIDE BURNER.INFORMED OPERATION AND AFTER INCREASING GAS FLOW BY OPERATION FOUND SENSOR OTHER WORKING OK. 20.11.2011 00:15:04 Vikas Mohan (PMBF203) Phone 07762-227001 3553 CHECKED AND FOUND FLAME WAS LOW INSIDE BURNER.INFORMED OPERATION AND AFTER INCREASING GAS FLOW BY OPERATION FOUND SENSOR OTHER WORKING OK.
OTHER
11/17/2011
OPER
11/17/2011
OPER
11/16/2011
OPER
11/13/2011
20.11.2011 00:22:54 Vikas Mohan (PMBF203) Phone 07762-227001 3553 DUE TO LEAKAGE IN MS PIPE OF AIR LINE VALVE NOT OPERATE.OPERATED MANUALLY BY MECH AND DURING THIS PERIOD OPEN/CLOSE INDICATION GIVEN FROM OTHER LOGIX AS PER OPERATION REQUEST. 20.11.2011 00:31:43 Vikas Mohan (PMBF203) Phone 07762-227001 3553 FOUND TRIPED IN JAMING.CLEARED BY OPERATION.RESET DONE OTHER FOUND OK. 23.11.2011 12:27:00 Vikas Mohan (PMBF203) Phone 07762-227001 3553 PS PUMP TRIPPED SO RESET THE SAME AND MADE IT OK. -----------------------PANKAJ SKD OTHER 23.11.2011 12:42:22 Vikas Mohan (PMBF203) Phone 07762-227001 3553 TROUGH COOLINGV/V MIDDLE NOT OPERATING SO CHECDKED FOUND THERE WAS LEAKAGE IN REGULATOR SO ARRESTED THE SAME. BUT THERE WAS NO SOLENOIDE ASSEMBLY. NOW VALVE IS DIRECT SO NEED TO ASSEMBLE THE OTHER SAME. 24.11.2011 07:22:24 Vikas Mohan (PMBF203) Phone 07762-227001 3553 C/H A CRANE CT NOT WORKING OTHER FOUND TRIPPED , DUE TO ONERLOAD AFTER RESET FOUND OK. 24.11.2011 07:55:18 Vikas Mohan (PMBF203) Phone 07762-227001 3553 2 PT14802 A READING SHOWING POSSITIVE VALUE ONCE DRAINING DONE & WHEN DRAIN POINT LINE VALVE OPEN FOUND GAS COMING , NOT SUCTION , SO TOLD TO OPERATION TO CHECK THE LINE ,AFTER OPERATION CHECK FOUND IN LINE SAFETY VALVE OPEN , CLOSED BY MECHANICAL AFTER FOUND OTHER OK.
MECH
11/13/2011
MECH
11/13/2011
OPER
11/20/2011
OPER
11/21/2011
OPER
11/18/2011
OPER
11/22/2011
24.11.2011 21:42:29 Vikas Mohan (PMBF203) Phone 07762-227001 3553 MAGNET CRANE # 2 MAGNET NOT WORKING 24.11.2011 21:46:01 Vikas Mohan (PMBF203) Phone 07762-227001 3553 ON CHECKING FOUND MAGNET CABLE CUT AT SUPPORT CLAMP MOUNTED AT MAGNET, FAULTY CABLE LOOP REMOVED & RECONNECTION DONE AT MAGNET, CABLE CLAMPING DONE, CABLE SUPPORT TO BE CHANGED AS FOUND BEND, INFORMED MECH. SHIFT OTHER INCHARGE - ANUP KUMAR JHA 26.11.2011 00:32:12 Vikas Mohan (PMBF203) Phone 07762-227001 3553 TROUGH COOLINGV/V -A NOT OPERATING--VALVE OPERATION FOUND NORMAL BUT FEEDBACK NOT CAME PROPERLY DUE TO SHAFT JAMMING SO NEED TO BE CHECK.-OTHER AMIT 27.11.2011 05:19:03 Vikas Mohan (PMBF203) Phone 07762-227001 3553 S/H DED RAL-01 NOT RUNNING ON CHECKING FOUND MOTOR OK AND ROTATING BUT COUPLING FAILED SO NEED TO CHECK.MECHNICAL TAKEN PERMIT AND NOW POWER MADE ON. OTHER --------------------------------PANKAJ,DAS 27.11.2011 05:30:37 Vikas Mohan (PMBF203) Phone 07762-227001 3553 PS PUMP TRIPPED SO RESET THE SAME FOUND CURRENT ABOVE 40 A LATER BECAME OTHER NORMAL.
OPER
11/24/2011
MECH
11/21/2011
MECH
11/22/2011
OPER
11/25/2011
29.11.2011 04:41:51 Vikas Mohan (PMBF203) Phone 07762-227001 3553 HTSS#1 I/C-2 TRIPPED FROM P/P END AND PMCC-2 TR-1 ALSO TRIPPED ON O/C 29.11.2011 04:47:08 Vikas Mohan (PMBF203) Phone 07762-227001 3553 WHEN HTSS I/C-2 TRIPPED FROM P/P END THEN PMCC-2 TR-1 TRIPPED ON OVER CURRENT AND DG STARTED IN AUTO. SO RESET DONE, LATER POWER RESUMED FROM PP END (FROM GRID) THEN I/C-2 RESET DONE AND MADE NORMAL. OTHER (AGAM/PRINCE) 30.11.2011 11:09:15 Vikas Mohan (PMBF203) Phone 07762-227001 3553 MILL -01 GAS ANALYSER TRIPPED SO RESETTING DONE AND FOUND SYSTEM WORKING NORMAL. OTHER ---------------PANKAJ,SAMIRAN
OTHER
11/22/2011
OTHER
11/29/2011
Required End
BD TIME
DescEmpl.Resp.
Reported by
TechInspectn by
Remark
20:00:00
11/01/2011 23:00:00
KAPIL PAHUJA
PANKAJ/SKUIT
01:00:00
11/01/2011 01:25:00
PATNAYAK
VINAY,SAROJ
11:30:00
11/01/2011 12:00:00
OPERATOR
KABIR,SKD
15:00:00
11/02/2011 17:00:00
R.SHETTY
DAULAT VERMA
18:30:00
11/02/2011 21:00:00
MUKESH SAHU
DAULAT/MELUR
16:00:00
11/02/2011 18:00:00
VIRANT CHIT
DM,MS,OPD
09:40:00
11/03/2011 09:55:00
BHANU PATEL
MELURAM SAHU
05:50:07
11/04/2011
6:20
MAHIPAL
AKM,PS
11:00:00
11/07/2011 15:30:00
SHUT DOWN JO
MOHIT, GOPI
07:30:42
11/08/2011 07:50:00
DHANSENA
PANKAJ
16:30:00
11/08/2011 16:45:00
AMIT VERMA
MURLI KRISHN
15:30:00
11/08/2011 15:45:00
VIKRANT CHIT
MEL,MUR,RATH
21:30:00
11/07/2011 22:00:00
S.K.DAS
OMPARKASH
00:40:00
11/08/2011 01:10:00
AGAM K SINGH
DAULAT VERMA
22:40:00
11/07/2011 23:00:00
BHANNU
DAULAT VERMA
11:30:00
11/07/2011 16:00:00
SHUT DOWN JO
PVR,CHAITAIN
16:00:00
11/07/2011 18:00:00
SHUT DOWN JO
PVR,CHAITAIN
08:30:00
11/07/2011 17:30:00
SHUT DOWN JO
RM/DK/PC/SET
16:30:00
11/09/2011 17:00:00
AMIT VERMA
OMPARKASH
10:00:00
11/05/2011 10:30:00
M.L.REDDY
VINAY,DEEPAK
13:26:15
11/09/2011 14:00:00
SUDHIR
SUDAMA
01:30:00
11/02/2011 02:00:00
BHANNU
SAROJ PATEL
01:00:00
11/17/2011 01:30:00
BHANNU
SKD,PKS,CHT
07:30:00
11/17/2011 08:45:00
AMIT VERMA
RB,OPD
10:30:00
11/16/2011 10:40:00
PATNAIK
KABIR,SKD
16:10:00
11/13/2011 16:20:00
PATNAIK
KABIR,SKD
19:45:00
11/13/2011 20:00:00
ARYA
KABIR,SKD
19:30:00
11/13/2011 19:45:00
PATNAIK
KABIR,SKD
02:30:27
11/20/2011 03:00:00
0:29
ASRAF
RRB,MRS
17:00:47
11/21/2011 17:30:00
DANSENA
CKP
12:00:00
11/18/2011 12:20:00
VIKRANT.CHIT
DAULAT VERMA
12:00:00
11/22/2011 13:00:00
E V RAO
C K PATEL
19:30:00
11/24/2011 21:40:00
PRAJAPATHI
DEEPAK,DAULA
17:30:00
11/21/2011 17:45:00
DANSENA
PANKAJ,KABIR
19:00:48
11/22/2011 19:30:00
MAHARANA
OPD
10:30:14
11/25/2011 11:00:00
PATNAIK
CKP
05:45:00
11/22/2011 06:00:00
PATNAYAK
DAULAT/RAKSH
04:00:24
11/29/2011 04:15:00
0:14
ARYA
MELURAM SAHU