Functional loc.

Description

10186996

JRGH-UT03-BF02-BFLRSTA

TLC NO-08 CURRENT TAKEN TOO MUCH HIGH

10187000

JRGH-UT03-BF02-BFPCIPL

PCI CA FAN -2 TRIPPED DUE TO OVERLOAD

10187185

JRGH-UT03-BF02-BFLRSTA

TLC-03 MOTOR TRIPPED DURING CHECKING

10187193

JRGH-UT03-BF02-BFSTKHU

Stock House

FOC -01 NEED TO TRIAL AS BELT CHANGE

10187194

JRGH-UT03-BF02-BFSTOVE

CA FAN-01 MOTOR CONNECTION NEED TO OPEN

10187195

JRGH-UT03-BF02-BFLRSTA

TLC NO-07 WAS TRIPPED , PCM IN POURING

10187254

JRGH-UT03-BF02-BFPCIPL

COAL LINE V/V -3 CLOSE FAULT IN DISTRIBU

10187395

JRGH-UT03-BF02-BFSTKHU

Stock House

RAL -02 of S/H ded tripped

10188225

JRGH-UT03-BF02-BFPROPE

Furnace Proper

TE-2010-3D THERMOCOUPLE CHANGING

10188250

JRGH-UT03-BF02-BFSTOVE

Hot blast valve-02 not showing open

10188331

JRGH-UT03-BF02-BFSGPAT

C/H A BLOWING BOX VALVE NOT OPEN

10188335

JRGH-UT03-BF02-BFSTKHU

Stock House

BFC-1 1&3 COMBINATION GOT STOPPED

10188356

JRGH-UT03-BF02-BFPCIPL

PCI COMMON SCREW CONVEYER-2 ZSS FAULT

10188357

JRGH-UT03-BF02-BFPROPE

Furnace Proper

FT-1706S READING SHOWING LOW

10188360

JRGH-UT03-BF02-BF02TOP

Furnace Proper

PRESSURE EQUALISING V/V OPEN FAULT

10188363

JRGH-UT03-BF02-BFPROPE

Furnace Proper

THERMOCOUPLE (TT-0503D) OF HB CHANGED

10188364

JRGH-UT03-BF02-BF02TOP

Furnace Proper

PT-3006B WAS NOT SHOWING READING

10188370

JRGH-UT03-BF02-BFSTOVE

STOVE PROXIMITY JB NEED TO CHANGE

10188608

JRGH-UT03-BF02-BFSGPAT

C/H B BLOWING BOX VALVE NOT OPEN

10188616

JRGH-UT03-BF02-BFPCIPL

TUYERE-3 COAL LINE V/V NOT OPERATING

10188817

JRGH-UT03-BF02-DEDUSSY

DEDUSTING DPT SHOWING HIGHER RATING

10189799

JRGH-UT03-BF02-BFPCIPL

PCI

PCI CA FAN-2 TRIPPED

10190024

JRGH-UT03-BF02-BFLRSTA

PCM

TLC-07 NOT OPERATING

10190198

JRGH-UT03-BF02-BFPIGCM

PCM

MAGNET CRANE 115 T NOT WORKING

10190691

JRGH-UT03-BF02-BFPCIPL

PCI

HGG-02 FLAME NOT SENSING.

10190693

JRGH-UT03-BF02-BFPCIPL

PCI

HGG-02 FLAME NOT SENSING.

10190694

JRGH-UT03-BF02-BFSGPAT

SGP BLOWING BOX VALVE-B NOT OPERATE.

10190695

JRGH-UT03-BF02-BFPCIPL

PCI DRAGCHAIN FEEDER-01 TRIPED.

10191430

JRGH-UT03-BF02-BFPCIPL

PCI

PS PUMP TRIPPED

10191439

JRGH-UT03-BF02-BFCASTH

Furnace Proper

TROUGH COOLINGV/V MIDDLE MOT OPERATIN

10191550

JRGH-UT03-BF02-BFCASTH

Furnace Proper

C/H A CRANE CT NOT WORKING

10191559

JRGH-UT03-BF02-BFPCIPL

2 PT14802 A READING SHOWING POSSITIVE VA

10191782

JRGH-UT03-BF02-BFPIGCM

MAGNET CRANE # 2 MAGNET NOT WORKING

10192027

JRGH-UT03-BF02-BFCASTH

Furnace Proper

TROUGH COOLINGV/V -A NOT OPERATING

10192294

JRGH-UT03-BF02-BFSTKHU

S/H DED RAL-01 NOT RUNNING

10192296

JRGH-UT03-BF02-BFPCIPL

PCI

PS PUMP TRIPPED

10192649

JRGH-UT03-BF02-HTSS001

P/H & HTSS

HTSS#1 I/C-2 TRIPPED FROM P/P END

10193030

JRGH-UT03-BF02-BFPCIPL

PCI

MILL -01 GAS ANALYSER TRIPPED

Long Text

E&I & OTHERS E &I /Mech/ Oper/Other LECT/INST/AUTO E

Nature of Problem

Man/Mat/Meth

Req. start

TLC NO-08 CURRENT TAKEN TOO MUCH HIGH ON CHECKING FOUND CURRENT TAKEN ABOVE 40 AMPERE & TRIPPED SO TOLD TO OPERATION THAT TLC WAS JAM. AFTER CHECKED FOUND BREAK SUPPLY NOT COMING AFTER CLEANING THE SOCKET PIN & ONE PIN (11 NO.) CIRCLIP NOT PROPER FIT, SO MADE IT OK. ACCORDING TO OPERATION REQUEST TADLE OPERATE IN DC SUPPLY , IN DC CHECKED FOUND LADLE OPERATED OK.NEED TO CHECK IN AC. 02.11.2011 06:07:24 Vikas Mohan (PMBF203) Phone 07762-227001 3553 CHECKED AT PANEL SIDE AND RESISTANCE BOX CHECKED FOUND NOTHING ABNORMAL. THEN SUPPLY CHECKED AT FEMALE SOCKET FOUND OK (BY SYSTEM ALLOWANCE BYPASS) THEN SYSTEM ALLOWANCE BYPASS REMOVED AND TRAIL TAKEN AFTER POURING AND FOUND SUPPLY COMING AT BREAK BUT IT WAS NOT RELEASING AS MECH PROBLEM. MECH MADE IT OK. THEN TRAIL TAKEN FOUND CURRENT 20-22A AT OTHER PCM AND LRS. (C-SHIFT) VINAY/PRINCE

MECH

11/01/2011

02.11.2011 04:00:04 Vikas Mohan (PMBF203) Phone 07762-227001 3553 PCI CA FAN -2 TRIPPED DUE TO OVERLOAD, ON CHECKING FOUND TRIPPED ON FAULT F-9 OVERTEMP, RESET DONE NOT STATED THE SAME AS MILL-2 JAMMED AT THE SAME TIME. 02.11.2011 06:54:53 Vikas Mohan (PMBF203) Phone 07762-227001 3553 OTHER INCHARGE-VINAYDESHMUKH AND PRINCE SAINI 02.11.2011 23:21:29 Vikas Mohan (PMBF203) Phone 07762-227001 3553 TLC-03 MOTOR TRIPPED DURING CHECKING-AFTER CHECKED ON DATED 31.10.2011 G SHIFT LOAD FOUND NORMAL(20 AMP) <80% MOVEMENT BUT ABOVE IT BOTH DIRECTION CURRENT FOUND >35 AMPS AND TRIPPED O/L.SO WE AGAIN TOLD TO OPERATION PEOPLE OTHER FOR CLEANING TLC JAMMING.---PANKAJ 03.11.2011 06:42:12 Vikas Mohan (PMBF203) Phone 07762-227001 3553 FOC -01 NEED TO TRIAL AS BELT CHANGE AFTER MECHANICAL WORK TRIAL TAKEN IN COUPLING ,AFTER MECHANICAL WORK FOUND 11.5-12.5 AMPERE & IN LOAD FOUND CURRENT 22 AMPERE , SETTING 29 AMPERE. BUT FOUND ZSS COMING , SO CHECKED & FOUND PROXIMITY OF ZSS DAMAGE SO CHANGE THE SAME FROM SPARE , BYPASS REMOVED FROM PANEL SIDE. AFTER TRIAL TAKEN FOUND OK. ........................ABHILASH/SAMIRAN. OTHER 03.11.2011 07:15:27 Vikas Mohan (PMBF203) Phone 07762-227001 3553 CA FAN-01 MOTOR CONNECTION NEED TO OPEN AS BEARING CHANGE BY MECHANICAL. POWER MADE OFF & POWER , RTD, EARTHING CONNECTION OPENED. NOW MECHANICAL WORK UNDER PROGRESS ( 09:00:00 AM TO 10:30:000 AM) CONNECTION DONE IN MOTOR TERMINAL & RTD CONNECTION . PROXYMITY CONNECTION ALSO DONE. AFTER MECHANICAL PERMIT CANCELLED POWER MADE ON, FOUND CURRENT 29-30 AMPERE IN NO LOAD COUPLING CONDITION . VIBRATION SHOWING 6 M/S .TEMPARATURE READING FOUND FOUND NORMAL . ONE EARTHING PLATE NOT CONNECT DUE TO NOT MATCH IN SUPPORT , NEED TO BE MOUNT , POWER MADE ON.(18:30 PM- 21:00 PM). OTHER ........... ABHILAS/SAMIRAN. 03.11.2011 07:30:22 Vikas Mohan (PMBF203) Phone 07762-227001 3553 TLC NO-07 WAS TRIPPED , PCM IN POURING TIME FOUND TRIPPED ON OVER LOAD, AFTER RESET FOUND CURRENT TAKEN >35 AMPERE , SO TOLD TO OPERATE SLOWING . AFTER OPERATOR OPERATE IN INCHING MODE, AFTER LADLE EMPTY & CURRENT GETTING NORMAL AS 20-25 AMPERE ............ABHILASH/SAMIRAN. OTHER 03.11.2011 10:53:13 Vikas Mohan (PMBF203) Phone 07762-227001 3553 COAL LINE V/V -3 CLOSE FAULT IN DISTRIBUTOR ON CHECKING FOUND VALVE NOT FULLY CLOSED , ONCE CLOSE FEEDBACK GIVEN FROM FIELD AFTER OPERATED 4-5 TIMES , AFTER FOUND OTHER NORMAL.

OPER

11/01/2011

OPER

11/01/2011

MECH

11/02/2011

MECH

11/02/2011

MECH

11/02/2011

MECH

11/03/2011

04.11.2011 05:50:07 Vikas Mohan (PMBF203) Phone 07762-227001 3553 RAL -02 of S/H ded tripped so checked found its fan was damagedand dust was imposed on same.so new fan mounting done from spare motor.now trial taken found 1.5 A. OTHER ----------------------------------------PKS,KABIR 08.11.2011 12:38:08 Vikas Mohan (PMBF203) Phone 07762-227001 3553 THERMOCOUPLE WAS CHECKED AND FOUND STUCK WITH THE WELL. SO CUTTING WAS DONE AND DUMMY WAS PROVIDED. OTHER

OPER

11/04/2011

OPER

11/07/2011

08.11.2011 13:37:46 Vikas Mohan (PMBF203) Phone 07762-227001 3553 Hot blast valve-02 not showing open so checked found stricker was not getting up to open proximity of valve so mechanical adjusted the stricker.now trial taken and found system ok. ----------------------kabir, pankaj OTHER 08.11.2011 20:12:49 Vikas Mohan (PMBF203) Phone 07762-227001 3553 C/H A BLOWING BOX VALVE NOT OPEN FROM CONTROL ROOM ON CHECKING FOUND VALVE NOT OPEN MANUALLY , DUE TO MECHANICAL PROBLEM , MECHANICAL WORK DONE . AFTER TRIAL FOUND OK. OTHER 08.11.2011 20:30:33 Vikas Mohan (PMBF203) Phone 07762-227001 3553 BFC-1 1&3 COMBINATION GOT STOPPED BFC-1 MOTOR 1 &3 COMBINATION STOPPED DUE TO PULL CHORD IN LEFT SIDE BY MATERIAL SPILAGE , RELEASE THE SAME BY OPERATOR .AFTER TRIAL 2 & 4 COMBINATION BUT 4 NO. MOTOR NOT STARTED , THEN AGAIN STARTED THE COMBINATION OF 1 & 3 THEN FOUND TIMER STARTED , SO RESET THE TIMER AFTER FOUND 1 & 3 NO. COMBINATION STARTED . AFTER 4 NO MOTOR CHECKED FOUND FIELD SIDE OK. HT BREAKER CHECKED FOUND VAJC 11 RELAY COIL OPEN CONTACT NOT MAKING OF OFF INDICATION , HENCE RELAY CHANGE. AFTER TRIAL TAKEN FOUND OK ( FOR THIS WORK TIME TAKEN 17:00:00 - 17:10:00 ) ............ABHILASH/SAMIRAN. OTHER

OPER

11/08/2011

MECH

11/08/2011

OTHER

11/08/2011

09.11.2011 04:17:07 Vikas Mohan (PMBF203) Phone 07762-227001 3553 PCI COMMON SCREW CONVEYER-2 ZSS FAULT 09.11.2011 04:18:57 Vikas Mohan (PMBF203) Phone 07762-227001 3553 FOUND GAP IS LARGE BETWEEN STRICKER AND PROXIMITY AS MECH WORKED ON SAME PREVIOUSLY. SO GAP ADJUSTMENT DONE AND TRAIL TAKEN FOUND OK. (AGAM, OTHER PRINCE)

MECH

11/07/2011

09.11.2011 04:25:18 Vikas Mohan (PMBF203) Phone 07762-227001 3553 FT-1706S READING SHOWING LOW AS DOUBT BY OPERATION 09.11.2011 04:27:44 Vikas Mohan (PMBF203) Phone 07762-227001 3553 CHECKED AT RIO AND FOUND mA SHOWING 10.9 AND ACCORDING TO mA READING SHOWING OK IN CONTROL ROOM, AT Tx END CHECKING NOT DONE AS APPROCH PROBLEM. STAIR CASE REQUIRED FOR CHECKING WORK. OTHER (AGAM/PRINCE)

OTHER

11/08/2011

09.11.2011 04:58:39 Vikas Mohan (PMBF203) Phone 07762-227001 3553 PRESSURE EQUALISING V/V OPEN FAULT COMING 09.11.2011 05:06:39 Vikas Mohan (PMBF203) Phone 07762-227001 3553 CHECKED AND FOUND STRICKER DISTURBED OF SAME AS IT WAS BENT 09.11.2011 05:07:25 Vikas Mohan (PMBF203) Phone 07762-227001 3553 OTHER ADJUSTMENT DONE OF SAME AND TRAIL TAKEN FOUND OK. 09.11.2011 06:39:31 Vikas Mohan (PMBF203) Phone 07762-227001 3553 ON CHECKING FOUND THAT THE WELL HAS BEEN BENDED. CUTTING OF THE WELL BEEN DONE AND NEW THERMOCOUPLE WITH WELL HAS BEEN OTHER INSERTED (1007MM) 09.11.2011 06:49:45 Vikas Mohan (PMBF203) Phone 07762-227001 3553 CHECKED AND FOUND THE PROCESS POINT JAMMED. PROCESS POINT CLEANING DONE OTHER AND AFTER THAT READING OBSERVED AND FOUND NORMAL.

MECH

11/07/2011

OPER

11/07/2011

OPER

11/07/2011

09.11.2011 07:30:59 Vikas Mohan (PMBF203) Phone 07762-227001 3553 STOVE PROXIMITY JB NEED TO CHANGE JB CHANGING JOB DONE FOR ALL THREE STOVES IN WHICH FOLLOWING VALVES JB REPLACING WITH TERMINATION WORK DONE. AFTER WORK TRIAL TAKEN AND FOUND WORKING OK AS SENCED BY PROXIMITY SENSING. STOVE # 1 BFGIV BFGIV cum VENT BFGSV CASV SPSV STOVE # 2 BFGIV SPSV BFGIV cum VENT BFGSV CASV STOVE # 3 BFGIV BFGIV cum VENT

OTHER

OTHER

11/07/2011

09.11.2011 21:48:32 Vikas Mohan (PMBF203) Phone 07762-227001 3553 C/H B BLOWING BOX VALVE NOT OPEN ON CHECKING FOUND IN VALVE MECHANICAL PROBLEM . THEY WORK AFTER FOUND OTHER OK. 10.11.2011 00:11:05 Vikas Mohan (PMBF203) Phone 07762-227001 3553 TUYERE-3 COAL LINE V/V NOT OPERATING SHOWING CLOSE FAULT, VALVE JAMMED OTHER V/V CLEANING DONE BY MECH, THEN TRIAL TAKEN FOUND OK. 10.11.2011 19:39:10 Vikas Mohan (PMBF203) Phone 07762-227001 3553 DEDUSTING DPT SHOWING HIGHER READING AS PER OPERATION AND MECAHNICAL AND DOUBT ON DP OF SAME.CHECKING DONE FOUND TRANSMITTER SHOIWING READING HIGH BUT CONNECTION AND LINE CHECKED FOUND OK.LATER FUSES OF COMPARTMENT SELECTION AND PULSING SOLENOID CHECKED FOUND WORKING NORMAL. SO TOLD TO OPERATION AND MECHANICAL FOR FURTHER CHECKING.--------------OTHER PANKAJ,ANIK........

MECH

11/09/2011

MECH

11/05/2011

OTHER

11/09/2011

16.11.2011 01:38:46 Vikas Mohan (PMBF203) Phone 07762-227001 3553 PCI CA FAN-2 TRIPPED 16.11.2011 01:41:21 Vikas Mohan (PMBF203) Phone 07762-227001 3553 CHECKED AND FOUND TRIPPED ON OVER TEMP FAULT NO.-9 SO RESET DONE AND MOTOR INSPECTION DONE FOUND NO ABNORMILITY. TRAIL TAKEN FOUND OK. 16.11.2011 01:47:15 Vikas Mohan (PMBF203) Phone 07762-227001 3553 OTHER VINAY/PRINCE

OTHER

11/02/2011

17.11.2011 05:35:51 Vikas Mohan (PMBF203) Phone 07762-227001 3553 TLC-07 NOT OPERATING 17.11.2011 05:37:32 Vikas Mohan (PMBF203) Phone 07762-227001 3553 CHECKED OVERLOAD TRIPPED, CURRENT TAKING HIGH AT STARTING, OPERATED IN INCHING AT STARTING CURRENT BECOMES NORMAL CURRENT OTHER TAKING 23A. 17.11.2011 13:55:19 Vikas Mohan (PMBF203) Phone 07762-227001 3553 MAGNET CRANE 115 T NOT WORKING ON CHECKING FOUND FLUSHING OCCURED NEAR MAGNET , NEAR 2 MTR FROM MAGNET , DUE TO OPERATOR MISTAKE FLUSHING OCCURED . Y PHASE GROUNDED SO SPARE B PHASE USE & TAKEN IN LINE . PANEL & MAGNET SIDE ( BOTH SIDE) CLIMPING & LUGGING DONE . DUE TO THIS FUSE BLOWN & FUSE BASE ALSO MELT , SO FUSE & FUSE BASE ALSO REPLACEMENT DONE . TRIAL TAKEN FOUND OK. OTHER ...................SHIB BAHADUR SINGH/ SAMIRAN KUITY.. 19.11.2011 23:53:59 Vikas Mohan (PMBF203) Phone 07762-227001 3553 CHECKED AND FOUND FLAME WAS LOW INSIDE BURNER.INFORMED OPERATION AND AFTER INCREASING GAS FLOW BY OPERATION FOUND SENSOR OTHER WORKING OK. 20.11.2011 00:15:04 Vikas Mohan (PMBF203) Phone 07762-227001 3553 CHECKED AND FOUND FLAME WAS LOW INSIDE BURNER.INFORMED OPERATION AND AFTER INCREASING GAS FLOW BY OPERATION FOUND SENSOR OTHER WORKING OK.

OTHER

11/17/2011

OPER

11/17/2011

OPER

11/16/2011

OPER

11/13/2011

20.11.2011 00:22:54 Vikas Mohan (PMBF203) Phone 07762-227001 3553 DUE TO LEAKAGE IN MS PIPE OF AIR LINE VALVE NOT OPERATE.OPERATED MANUALLY BY MECH AND DURING THIS PERIOD OPEN/CLOSE INDICATION GIVEN FROM OTHER LOGIX AS PER OPERATION REQUEST. 20.11.2011 00:31:43 Vikas Mohan (PMBF203) Phone 07762-227001 3553 FOUND TRIPED IN JAMING.CLEARED BY OPERATION.RESET DONE OTHER FOUND OK. 23.11.2011 12:27:00 Vikas Mohan (PMBF203) Phone 07762-227001 3553 PS PUMP TRIPPED SO RESET THE SAME AND MADE IT OK. -----------------------PANKAJ SKD OTHER 23.11.2011 12:42:22 Vikas Mohan (PMBF203) Phone 07762-227001 3553 TROUGH COOLINGV/V MIDDLE NOT OPERATING SO CHECDKED FOUND THERE WAS LEAKAGE IN REGULATOR SO ARRESTED THE SAME. BUT THERE WAS NO SOLENOIDE ASSEMBLY. NOW VALVE IS DIRECT SO NEED TO ASSEMBLE THE OTHER SAME. 24.11.2011 07:22:24 Vikas Mohan (PMBF203) Phone 07762-227001 3553 C/H A CRANE CT NOT WORKING OTHER FOUND TRIPPED , DUE TO ONERLOAD AFTER RESET FOUND OK. 24.11.2011 07:55:18 Vikas Mohan (PMBF203) Phone 07762-227001 3553 2 PT14802 A READING SHOWING POSSITIVE VALUE ONCE DRAINING DONE & WHEN DRAIN POINT LINE VALVE OPEN FOUND GAS COMING , NOT SUCTION , SO TOLD TO OPERATION TO CHECK THE LINE ,AFTER OPERATION CHECK FOUND IN LINE SAFETY VALVE OPEN , CLOSED BY MECHANICAL AFTER FOUND OTHER OK.

MECH

11/13/2011

MECH

11/13/2011

OPER

11/20/2011

OPER

11/21/2011

OPER

11/18/2011

OPER

11/22/2011

24.11.2011 21:42:29 Vikas Mohan (PMBF203) Phone 07762-227001 3553 MAGNET CRANE # 2 MAGNET NOT WORKING 24.11.2011 21:46:01 Vikas Mohan (PMBF203) Phone 07762-227001 3553 ON CHECKING FOUND MAGNET CABLE CUT AT SUPPORT CLAMP MOUNTED AT MAGNET, FAULTY CABLE LOOP REMOVED & RECONNECTION DONE AT MAGNET, CABLE CLAMPING DONE, CABLE SUPPORT TO BE CHANGED AS FOUND BEND, INFORMED MECH. SHIFT OTHER INCHARGE - ANUP KUMAR JHA 26.11.2011 00:32:12 Vikas Mohan (PMBF203) Phone 07762-227001 3553 TROUGH COOLINGV/V -A NOT OPERATING--VALVE OPERATION FOUND NORMAL BUT FEEDBACK NOT CAME PROPERLY DUE TO SHAFT JAMMING SO NEED TO BE CHECK.-OTHER AMIT 27.11.2011 05:19:03 Vikas Mohan (PMBF203) Phone 07762-227001 3553 S/H DED RAL-01 NOT RUNNING ON CHECKING FOUND MOTOR OK AND ROTATING BUT COUPLING FAILED SO NEED TO CHECK.MECHNICAL TAKEN PERMIT AND NOW POWER MADE ON. OTHER --------------------------------PANKAJ,DAS 27.11.2011 05:30:37 Vikas Mohan (PMBF203) Phone 07762-227001 3553 PS PUMP TRIPPED SO RESET THE SAME FOUND CURRENT ABOVE 40 A LATER BECAME OTHER NORMAL.

OPER

11/24/2011

MECH

11/21/2011

MECH

11/22/2011

OPER

11/25/2011

29.11.2011 04:41:51 Vikas Mohan (PMBF203) Phone 07762-227001 3553 HTSS#1 I/C-2 TRIPPED FROM P/P END AND PMCC-2 TR-1 ALSO TRIPPED ON O/C 29.11.2011 04:47:08 Vikas Mohan (PMBF203) Phone 07762-227001 3553 WHEN HTSS I/C-2 TRIPPED FROM P/P END THEN PMCC-2 TR-1 TRIPPED ON OVER CURRENT AND DG STARTED IN AUTO. SO RESET DONE, LATER POWER RESUMED FROM PP END (FROM GRID) THEN I/C-2 RESET DONE AND MADE NORMAL. OTHER (AGAM/PRINCE) 30.11.2011 11:09:15 Vikas Mohan (PMBF203) Phone 07762-227001 3553 MILL -01 GAS ANALYSER TRIPPED SO RESETTING DONE AND FOUND SYSTEM WORKING NORMAL. OTHER ---------------PANKAJ,SAMIRAN

OTHER

11/22/2011

OTHER

11/29/2011

Req. start time

Required End

Req. end time

BD TIME

DescEmpl.Resp.

Reported by

TechInspectn by

Remark

20:00:00

11/01/2011 23:00:00

3:00 Arvind Singh Chauhan

KAPIL PAHUJA

PANKAJ/SKUIT

01:00:00

11/01/2011 01:25:00

0:25 Arvind Singh Chauhan

PATNAYAK

VINAY,SAROJ

11:30:00

11/01/2011 12:00:00

0:30 Arvind Singh Chauhan

OPERATOR

KABIR,SKD

15:00:00

11/02/2011 17:00:00

2:00 Arvind Singh Chauhan

R.SHETTY

DAULAT VERMA

18:30:00

11/02/2011 21:00:00

2:30 Arvind Singh Chauhan

MUKESH SAHU

DAULAT/MELUR

16:00:00

11/02/2011 18:00:00

2:00 Arvind Singh Chauhan

VIRANT CHIT

DM,MS,OPD

09:40:00

11/03/2011 09:55:00

0:15 Arvind Singh Chauhan

BHANU PATEL

MELURAM SAHU

05:50:07

11/04/2011

6:20

0:30 Arvind Singh Chauhan

MAHIPAL

AKM,PS

11:00:00

11/07/2011 15:30:00

4:30 Arvind Singh Chauhan

SHUT DOWN JO

MOHIT, GOPI

07:30:42

11/08/2011 07:50:00

0:19 Arvind Singh Chauhan

DHANSENA

PANKAJ

16:30:00

11/08/2011 16:45:00

0:15 Arvind Singh Chauhan

AMIT VERMA

MURLI KRISHN

15:30:00

11/08/2011 15:45:00

0:15 Arvind Singh Chauhan

VIKRANT CHIT

MEL,MUR,RATH

21:30:00

11/07/2011 22:00:00

0:30 Arvind Singh Chauhan

S.K.DAS

OMPARKASH

00:40:00

11/08/2011 01:10:00

0:30 Arvind Singh Chauhan

AGAM K SINGH

DAULAT VERMA

22:40:00

11/07/2011 23:00:00

0:20 Arvind Singh Chauhan

BHANNU

DAULAT VERMA

11:30:00

11/07/2011 16:00:00

4:30 Arvind Singh Chauhan

SHUT DOWN JO

PVR,CHAITAIN

16:00:00

11/07/2011 18:00:00

2:00 Arvind Singh Chauhan

SHUT DOWN JO

PVR,CHAITAIN

08:30:00

11/07/2011 17:30:00

9:00 Arvind Singh Chauhan

SHUT DOWN JO

RM/DK/PC/SET

16:30:00

11/09/2011 17:00:00

0:30 Arvind Singh Chauhan

AMIT VERMA

OMPARKASH

10:00:00

11/05/2011 10:30:00

0:30 Arvind Singh Chauhan

M.L.REDDY

VINAY,DEEPAK

13:26:15

11/09/2011 14:00:00

0:33 Arvind Singh Chauhan

SUDHIR

SUDAMA

01:30:00

11/02/2011 02:00:00

0:30 Arvind Singh Chauhan

BHANNU

SAROJ PATEL

01:00:00

11/17/2011 01:30:00

0:30 Arvind Singh Chauhan

BHANNU

SKD,PKS,CHT

07:30:00

11/17/2011 08:45:00

1:15 Arvind Singh Chauhan

AMIT VERMA

RB,OPD

10:30:00

11/16/2011 10:40:00

0:10 Arvind Singh Chauhan

PATNAIK

KABIR,SKD

16:10:00

11/13/2011 16:20:00

0:10 Arvind Singh Chauhan

PATNAIK

KABIR,SKD

19:45:00

11/13/2011 20:00:00

0:15 Arvind Singh Chauhan

ARYA

KABIR,SKD

19:30:00

11/13/2011 19:45:00

0:15 Arvind Singh Chauhan

PATNAIK

KABIR,SKD

02:30:27

11/20/2011 03:00:00

0:29

ASRAF

RRB,MRS

17:00:47

11/21/2011 17:30:00

0:29 Arvind Singh Chauhan

DANSENA

CKP

12:00:00

11/18/2011 12:20:00

0:20 Arvind Singh Chauhan

VIKRANT.CHIT

DAULAT VERMA

12:00:00

11/22/2011 13:00:00

1:00 Arvind Singh Chauhan

E V RAO

C K PATEL

19:30:00

11/24/2011 21:40:00

2:10 Arvind Singh Chauhan

PRAJAPATHI

DEEPAK,DAULA

17:30:00

11/21/2011 17:45:00

0:15 Arvind Singh Chauhan

DANSENA

PANKAJ,KABIR

19:00:48

11/22/2011 19:30:00

0:29 Arvind Singh Chauhan

MAHARANA

OPD

10:30:14

11/25/2011 11:00:00

0:29 Arvind Singh Chauhan

PATNAIK

CKP

05:45:00

11/22/2011 06:00:00

0:15 Arvind Singh Chauhan

PATNAYAK

DAULAT/RAKSH

04:00:24

11/29/2011 04:15:00

0:14

ARYA

MELURAM SAHU