Sie sind auf Seite 1von 3

Table of Contents (CPIM BSCM 2012 Ed.

)
CPIM MODULE ONE: BSCM 4 4 9 9 10 13 13 14 14 15 15 16 17 19 19 20 21 22 23 23 24 28 28 29 30 30 31 31 32 33 34 37 37 39 39 40 42 43 43
1

QUICKPREVIEWQUESTIONS: ELEMENTS OF THE SUPPLY CHAIN


SUPPLY CHAIN SCM E- SUPPLY CHAIN AND E-SCM SUPPLY CHAIN DECISIONS, MODELS AND METHODS SUPPLY CHAIN MODELING SWOT ANALYSIS SCOR SUPPLY CHAIN DESIGN SUPPLY CHAIN REENGINEERING SUPPLY CHAIN COLLABORATION SUPPLY CHAIN VISIBILITY, INTELLIGENCE, EVENT MANAGEMENT AND CHANNEL MANAGEMENT SUPPLY CHAIN ORGANIZATIONAL DYNAMICS SUPPLY CHAIN CONFLICTS RESOLUTION ADR SUPPLY CHAIN COLLABORATIVE PLANNING SUPPLY CHAIN QUALITY SIGNIFICANT LEAN TERMINOLOGIES SUPPLY CHAIN CSR AND ETHICS GREEN SUPPLY CHAIN ENVIRONMENTALLY RESPONSIBLE PROCUREMENT PRODUCT CATEGORIES IN A PRODUCTION ENVIRONMENT HIGH VOLUME/LOW MARGIN LOW VOLUME/HIGH MARGIN DESIGNER PRODUCTS NPD MANUFACTURING FLEXIBILITY FLEXIBILITY AND MANUFACTURING STRATEGY FMS MCM APS CNC, CMM AND ROBOTICS MANUFACTURING CONSTRAINTS SUPPLY CHAIN METRICS SUPPLY CHAIN CHALLENGES THE TECHNICAL TERMS BOM

PRODUCT DESIGN DOCUMENTS SKU EOQ REORDER POINT OUTSOURCING MAKE VS BUY LEASE VS BUY LEASING ARRANGEMENTS OUTSOURCING OFFSHORE THE PROS OUTSOURCING OFFSHORE THE CONS INTERNATIONAL SOURCING THE TECHNICAL TERMS MANAGING SUPPLY CHAIN PROJECTS MANAGING PROJECT TIME AGGREGATE PRODUCTION PLANNING

46 47 47 49 50 51 51 52 54 57 60 62 66 68 69 70 71 73 75 75 75 76 79 80 80 81 81 81 82 82 83 84 85 86 86 87 87 89 90 91 91 94
2

JUST-IN-TIME (JIT)
WASTE ELIMINATION AND QUALITY IMPROVEMENT THE JIT BENEFITS KANBAN

QUALITY MANAGEMENT (QM)


AN OVERVIEW OF THE TERM QUALITY QUALITY ASSURANCE, CONTROL AND MANAGEMENT TQM TOYOTA PRODUCTION SYSTEM MUDA AND SCRUM POKA-YOKE QUALITY CIRCLE PDCA ADRI CONTINUOUS IMPROVEMENT PROJECTS STATISTICAL PROCESS CONTROL CONTROL CHARTS CONTROL CHART, RUN CHART, PARETO CHART, SCATTER DIAGRAM, AND CAUSE & EFFECT DIAGRAM C CHART, P CHART AND U CHART PRE-CONTROL ZERO DEFECTS MATERIAL IDENTIFICATION LEAN SIX SIGMA SIX SIGMA TERMINOLOGIES GOOD PRACTICE SYSTEMS BALANCED SCORECARD QUALITY STANDARDS ISO 9001: 2008

MRP AND MRP II


A QUICK SUMMARY SO WHAT ARE THEY EXACTLY? MASTER SCHEDULING MRP II ERP OVERVIEW REVERSE LOGISTICS, DRP, DISTRIBUTION PLANNING AND SPECIALIZATION

95 95 95 99 101 103 104 112 112 112 113 114 115 117 119 121 121 121 122 123 124 125 189

DEMAND PLANNING & MANAGEMENT


OVERVIEW PLANNING THE DEMAND NATURE OF DEMANDS DEMAND MANAGEMENT VS DEMAND PLANNING HOW DO YOU ACTUALLY MANAGE THE DEMAND? DEMAND FORECASTING VMI

CAPACITY MANAGEMENT
OBJECTIVE CAPACITY PLANNING, CAPACITY REQUIREMENTS PLANNING (CRP), AND COLLABORATIVE PLANNING, FORECASTING, AND REPLENISHMENT (CPFR) RATED CAPACITY CAPACITY CONTROL BSCM LAST MINUTE TIPS PRACTICE QUESTIONS CONTENTS UPDATE

Das könnte Ihnen auch gefallen