Sie sind auf Seite 1von 1

Side 1

Side 1 Elevation

1:50

Front

Rear

Front Elevation

Rear Elevation

1:50

1:50

Side 2

Side 2 Elevation

1:50

+3.455

0.414

Rear

12.805

0.115

0.950

0.115

0.950

0.115

0.950

0.115

1.740

0.230

1.740

0.115

0.950

0.115

0.950

0.115

0.950

0.115

0.950

0.230

0.470

1.064

0.230

+2.800

0.533

0.532

0.533

0.532

0.533

0.891

0.533

1.520

0.533

0.880

0.533

0.532

0.533

0.532

0.533

0.532

0.533

0.445

+2.330
0.230

1.611

NC5F
0.533 x 0.949

NC5F
0.533 x 0.949

NC5F
0.533 x 0.949

NC5F
0.533 x 0.949

NC5F
0.533 x 0.949

NC5F
0.533 x 0.949

4.735

Side 1

2.100

1.480

SHOWER

2.680

FEMALE

1.511

1.511 x 0.654
NE4

NE4
1.511 x 0.654

MALE

FEMALE
TOILETS

WC

0.115

1.850

DISABLED

DISABLED

URINAL

1.850
1.511

4.275

4.735

Side 2

+2.100

NC5F
0.533 x 0.949
0.230

NC5F
0.533 x 0.949

0.230

NC5F
0.533 x 0.949

0.000

4.115

0.230

1.770

0.230

0.230

0.900

1.770

0.150
0.230

2 x 0.125 = 0.250 m

0.845

0.025

4.461

0.230

4.000

4.575

1.770

0.230

1.770

0.230

0.690

Floor Plan
B.M

NB: ALL FOUNDATION WALLS TO BE


230mm MASONRY BLOCKWORK FILLED
SOLID WITH CONCRETE AND
BRICKFORCE APPLIED IN EVERY
COURSE UP TO FLOOR LEVEL.

FOUNDATIONS: 690 x 230mm r.c.


concrete strip footings. Depth to be
determined on site with a minimum
depth of 700mm below slab.

Front

DE SIGNED BY

0.690

4.461

12.805

0.

0.230

0.845

25mm grano screed on 100mm thick


concrete slan on 150u gunplas d.p.m.
on 25mm sand blinding on selected
and well compacted earth fill (each fill
to be approved and termite treated).
0.230

0.900

-0.160

0.230

0.025

6.53
13.06
%%

4.575

2 x 0.125 = 0.250 m

0.230

6.53
13.06
%%

1.374

SHOWER

1.374

SHOWER

1:50

Building Section

1:25

APP RO VED :

SIKHUPHE SEWERAGE

KINGDOM OF SWAZILAND
SWAZILAND WATER SERVICES CORPORATION

DESIGNED BY

R.R

DRAWN BY

N.M

CHECKED BY

R.R

APPROVEDED BY

APPROVED BY

CLIENT:

Swaziland Water Services


....................................................

........

FOR CONSULTING ENGINEER

DATE:....................

DATE

ABLUTION BLOCK

REGION:

11/10/03

No.

DRAWING No.:

AMENDMENTS

BY

DRAWING

No.

REFERENCE DRAWINGS

REVISION:

Das könnte Ihnen auch gefallen