START OF CONSTRUCTION DEEP WELL DRILIING 2 DRIVE CASING INSTALL HAND PUMP
5 8
0/0
8
LAYOUT OF FACILITIES
8/8
14/14
18
26/26
5 31/31
36/36
21
57/57
16
64/64
7/8
12
15
INSTALLATION OF FOUNDATION REBARS INSTALLATION OF GROUND COLUMN REBARS 47/57
13
13/26
18/31
16
INSTALLATION OF REBARS FOR 2ND FLOOR COLUMNS ROUGH-IN ELECTRICAL GROUND FLOOR
10
19
12
33/146
18
9
CONSTRUCTION AND ERECTION OF CONCRETE ELECTRIC POLES AND ACCESSORIES EXCAVTION OF SEPTIC VAULT
20
27/125
35
10
% ACCOMPLISHMENT COMMULATIVE ACCOMPLISHMENT EXPECTED INCOME COMMULATIVE EXPECTED INCOME 1.30% 1.30% P 74,100.00 P 74,100.00 1.40% 2.70% P 79,800.00 P 153,900.00 2.80% 5.50% P 159,600.00 P 313,500.00 3.00% 8.50% P 171,000.00 P 484,500.00
80
82
84
86
88
90
92
94
96
98
100
102
104
106
108
110
112
114
116
118
120
122
124
126
128
130
132
21
31
68/85
22
20
CONCRETING TANK COLUMN
29
20
39/148
15
37
35
BACKFILL PARKING AREA
35
CONCRETING SLAB BASE
32
11
FORMS FOR GROUND SLAB BASE
100/132
33
10
CONCRETING GROUND SLAB
38
42
110/142
39
5
CONSTRUCTION OF GROUND CHB WALL
115/147
43
15
20
CRETING OF SECOND
21
127/139
21
FORMS FOR 2ND FLOOR COLUMNS
5
61/85
90/90
115/115
14
14
ROUGH-IN PLUMBING SECOND FLOOR
15
ROUGH-IN PLUMBING GROUND FLOOR
26
27
15
28/98
12
10
43/156
28 23
11
35
INSTALLATION OF DEEP WELL PUMP AND ACCESSORIE INSTALLATION OF TRANSFORMERS CONSTRUCTION OF SEPTIC VAULT
36
69/167
62/160
69/167
23/155 8.20% 16.70% P 467,400.00 P 951,900.00 9.00% 25.70% P 513,000.00 P 1,464,900.00 17.50% 43.20% P 997,500.00 P 2,462,400.00 28.50% 71.70% P 1,624,500.00 P 4,086,900.00
20
13.00% 84.70% P 741,000.00 P 4,827,900.00
JUFEL LUZ P LAURE BSCE -136 138 CE172 142 144 146 V Assignment 3 134 140
148
150
152
154
156
158
160
162
164
166
168
170
172
174
176
178
180
182
184
186
188
7
LOT ROAD AND DRAINAGE
CURING
20
85 % 80 %
28
25
44
75 % 2ND FLOOR DOORS AND WINDOWS END OF CONSTRUCTION PAINTING OF SECOND FLOOR
52
48 50
70 % 65 %
127/139
14
INTERIOR PARTITION OF SECOND FLOOR 151/151
16
16
INSTALLATION OF 2ND FLOOR CEILING 51 156/157
167/167
53
54
60 % 55 % 50 % 45 %
182/182
135/135
INSTALLATION OF ROOFING
15
150/151
10
8
SMOOTH FINISH SECOND FLOOR SMOOTH FINISH GROUND FLOOR
40 % 35 % 30 % 25 % 20 % 15 %
20
20
10 % 5 % 0 %
0 00