Sie sind auf Seite 1von 14

30-Jan-12 Name of the Site:Sricity Masons Labour contractor (Inamul Haque) Local Labour contractor (Guna Sekhar) Local

Labour contractor (Selvam) Local Labour contractor (K.Venkatesh) Mc Fc Masons Mc Fc Masons Mc Fc Masons Mc Fc 1 1 9 4 Man Power

31-Jan-12

01-Feb-12 02-Feb-12 03-Feb-12 04-Feb-12 05-Feb-12 06-Feb-12 07-Feb-12 08-Feb-12 09-Feb-12 10-Feb-12

11-Feb-12

1 9 3

1 9 3

1 8 4

1 9

1 2

1 1

Masons Local Labour Mc contractor (Murugan) Fc Shuttering Contractor Fitters (S.Raja) Helpers Barbending (T.Ravi) Total :Work Description:Fitters Helpers 23 20 20 22 18 0 0 0 0 0 0 0 0 5 3 4 2 4 2 4 2 4 2

Dust filling,Collection tankRaft area bottom matsides Shuttering plinth walls andfor bending, deshutteringandconcrete area. for T-106 cross walls,Rods rods straightning and bending, Dust levellingplastering,Maintank completed,and consolidationrod main portion balance raft T-106,reinforcement shifting,shuttering plates cleaning andthe structure. and consolidation,pcc levelling,earth for beams rodbending and& bending for wall concreting Reinforcement for Raft top mat, chairs haunch tank placing,1st lift tying, 1st Lift,Cover blocks casting,12mm shifting,Curing applying shutt Reinforcement

Material Used Cement Sand Steel Conc M10 in (Cum) Conc M15 Conc M30 Dust filling & Consolidation in (Cum) Shuttering Qty in (Sqm) Diesel in (Ltrs) Petrol in (Ltrs) 2.72 8.58 3.66 1 8.90

Machinery Used Jcb Company Owned Jcb Hired Tractor Company Owned Tractor Hired Water Tanker Company Owned Baby Millar Hired Lift Hired Generator Hired Name of the Site:South Masons Labour contractor (Ramanamma) Local Labour contractor (A.Seenaiah) Brick Masonry contractor (G.Hari Babu) Mc Fc Masons Mc Fc Masons Mc Fc 6 8 6 11 3 10 3 13 3 8

Man Power

Masons Brick Masonry Mc contractor (T.Prasad) Fc Shuttering Contractor Fitters (Malli) Helpers Total :Work Description:13 16 14 17 11 0 0 0 0 0 0 0 0

CC Blocks shifting to GF to SF,SecondBallies,plywood for20mm for stacking, 2nd floors,terrace works. properly,deshuttering for strucked plates in 2nd floor roof slab removing,curing Sand,& CC Sand shifting from Cleaning boards,shuttering steel plates stacking,out side Blocks shifting from GF Brick shifting Aggregate shifting for floor GF toto SF, Ceiling plastering SF,Ballies well 1st, and

Material Used Cement Sand Steel Conc M10 Conc M15 Conc M20 Machinery Used

Jcb Company Owned Jcb Hired Tractor Company Owned Tractor Hired Water Tanker Company Owned Baby Millar Hired Lift Hired Generator Hired Name of the Site:CVR F Masons Labour contractor (Ramanamma) Local Labour contractor (A.Seenaiah) Brick Masonry contractor (G.Hari Babu) Mc Fc Masons Mc Fc Masons Mc Fc 5 5 6 9 6 10 7 11 5 10

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1

1 1 1 1

Man Power

Masons Brick Masonry Mc contractor (T.Prasad) Fc Brick Masonry contractor (K.Sreenivasulu) Masons Mc Fc Masons Brick Masonry Mc contractor (T.Prasad) Fc Shuttering Contractor Fitters (Malli) Helpers Electrical Contractor Fitters (V.Ravi) Helpers Plumbing Contractor Fitters (Mahesh) Helpers Total :Work Description:18 2 2 28 30 26 26 0 0 0 0 0 0 0 0 2 2 2 2 1 1 4 4 4 4 4 4 5 4 3 4

Septic tank excavated earth dressing,BrickFloorShuttering for PCC, Marking,PCC laying,Coast wallprogress,Block-2 GF and sanitary fixingbw plastering is and rubbish cleaning,water Septic Tank Pcc forLevelling,Side Cum done, brickCompleted,3rdblock east sideis innos and 2 units Sand shifted.Curing & wall progress. in guard rooms, Coastblock trench septic tank 12 Bricks Concrete block,GF 2nd reinforcement 600 curing,runners and shuttering sheets stacking,plastering progress. 3rd work at 2nd shifting, Septic tank raft floor,700nos,water plastering,plumbing Dormitory inner Cleaning for coast for GF block-1,and Gua Raft floor 2nd shfting for 3rd Floor Bricks guards rooms tiles cleaning,GF 2nd block in dismantling

Material Used Cement Sand Steel Conc M10 in (Cum) Conc M15 in (Cum) Conc M20 in (Cum) Machinery Used Jcb Company Owned Jcb Hired Tractor Company Owned Tractor Hired Water Tanker Company Owned Baby Millar Hired Lift Hired Generator Hired 14-Feb-12 Name of the Site:Sricity Masons Labour contractor (Inamul Haque) Local Labour contractor (Guna Sekhar) Local Labour contractor (Selvam) Local Labour contractor (K.Venkatesh) Mc Fc Masons Mc Fc Masons Mc Fc Masons Mc Fc Man Power 15-Feb-12 16-Feb-12 17-Feb-12 18-Feb-12 19-Feb-12 20-Feb-12 21-Feb-12 22-Feb-12 23-Feb-12 24-Feb-12 25-Feb-12 26-Feb-12 12.032 7.29

Masons Local Labour Mc contractor (Murugan) Fc

Shuttering Contractor Fitters (S.Raja) Helpers Barbending (T.Ravi) Total :Work Description:Fitters Helpers 0 0 0 0 0 0 0 0 0 0 0 0 0

Material Used Cement Sand Steel Conc M10 Conc M15 Conc M20 Machinery Used Jcb Company Owned Jcb Hired Tractor Company Owned Tractor Hired Water Tanker Company Owned Baby Millar Hired Lift Hired Generator Hired Name of the Site:South Masons Labour contractor (Ramanamma) Local Labour contractor (A.Seenaiah) Brick Masonry contractor (G.Hari Babu) Mc Fc Masons Mc Fc Masons Mc Fc

Man Power

Masons Brick Masonry Mc contractor (T.Prasad)

Brick Masonry contractor (T.Prasad) Fc Shuttering Contractor Fitters (Malli) Helpers Total :Work Description:0 0 0 0 0 0 0 0 0 0 0 0 0

Material Used Cement Sand Steel Conc M10 Conc M15 Conc M20 Machinery Used Jcb Company Owned Jcb Hired Tractor Company Owned Tractor Hired Water Tanker Company Owned Baby Millar Hired Lift Hired Generator Hired Name of the Site:CVR F Masons Labour contractor (Ramanamma) Local Labour contractor (A.Seenaiah) Brick Masonry contractor (G.Hari Babu) Mc Fc Masons Mc Fc Masons Mc Fc

Man Power

Masons Brick Masonry Mc contractor (T.Prasad) Fc

Brick Masonry contractor (K.Sreenivasulu)

Masons Mc Fc

Masons Brick Masonry Mc contractor (T.Prasad) Fc Shuttering Contractor Fitters (Malli) Helpers Electrical Contractor Fitters (V.Ravi) Helpers Plumbing Contractor Fitters (Mahesh) Helpers Total :Work Description:0 0 0 0 0 0 0 0 0 0 0 0 0

Material Used Cement Sand Steel Conc M10 Conc M15 Conc M20 Machinery Used Jcb Company Owned Jcb Hired Tractor Company Owned Tractor Hired Water Tanker Company Owned Baby Millar Hired Lift Hired Generator Hired

12-Feb-12

13-Feb-12

aunch portion bending and tying, reinforcement shifting,shuttering plates cleaning and applying shuttering oil and shifting ply boards for 2nd lift. And Curing works.

Floor Bricks 600 nos and 2 units Sand shifted.Curing & Cleaning for coast guard rooms, Coast Guard rooms corridor parapet wall completed.

27-Feb-12

28-Feb-12