CapacityMix
LUZON VISAYAS MINDANAO
63.94%
71.88%
37.31%
Note: BaseloadPowerPlantsarethefacilitiesusedto meet some or all of agiven continuous energy demand, andproduceenergyataconstantrate,usuallyatlowcostrelativetootherfacilitiesavailabletothesystem
2012MaxPeak =7,463MW
MinCapacity =7,592MW
2012Min Peak=5847 MW
Legend:
Geothermal Coal Natgas Source: DOR & DOH of NGCP Hydro Oilbased 2012SystemPeakDemand
MinCapacity =1,545MW
2012Max Peak=1,423 MW
2012Min Peak=1,205 MW
Legend:
Geothermal Coal Source: DOR & DOH of NGCP Hydro Oilbased 2012SystemPeakDemand
MindanaoPowerSituation
StatusofHydroelectricPowerPlant
PlantName Agus1 Agus2 Agus4 Agus5 Agus6 Agus7 Pulangi Total Installed Capacity(MW) 80 180 158.1 55 200 54 255 982.1 AvailableCapacity(MW) Peak 56 90 150 54 130 26 140 646 Offpeak 40 70 130 48 130 26 90 534
MindanaoPowerSituation
StatusofThermalPowerPlant
PlantName MindanaoCoal(STEAG) Mt.ApoGeo APTMI1 APTMI2 SPPC WMPC PB104 IDPP Total Installed Capacity(MW) 210 108.5 100.3 100.3 56 112 32 102 821.1 AvailableCapacity(MW) Peak 200 92 96 96 50 90 10 0 634 Offpeak 180 92 60 60 45 85 5 0 527
PowerSupplyDemandSituation
March2012
PowerSupplyandDemand AvailableCapacity PeakDemand* Surplus/(Deficit) RequiredReserveMargin PeakDemand+Reserve Margin Surplus/(Deficit)@Demand +ReserveMargin LUZON 9,127 7,346 1,781 1,588 8,934 193 VISAYAS 1,843 1,423 420 257 1,680 163 MINDANAO 1,280 1,300 (20) 150 1,450 (170) Pulangiafter repair Embedded Generation Notes: Sourceofdata,NGCPDailyOperationReport *ActualSystemPeakDemandfortheMonthofMarch2012forLuzonVisayasGrid *ProjectedSystemPeakDemandfortheMonthofMarch2012forMindanaoGrid 100 74