Beruflich Dokumente
Kultur Dokumente
April,2012
ASSETNAME
REQUIRMENT
CATEGORY
PRIORITY
COST
CAPITOLBUILDING
ElectricalPenetrations:FireStoppingMissing
CodeCompliance
0CurrentlyCritical
$4,525.00
ElectricalWiring:OpenEnclosures
CodeCompliance
0CurrentlyCritical
$18,134.00
ExitSigns/EmergencyLights:Insufficient
LifeSafety
0CurrentlyCritical
$126,982.00
ExteriorDoors:OperationalProblems(Roof)
Integrity
0CurrentlyCritical
$2,582.00
InteriorDoors:WearandNonCompliantFRR
CodeCompliance
0CurrentlyCritical
$100,654.00
AirHandlingUnitsAged
BeyondUsefulLife
1PotentiallyCritical
$2,172,382.00
BasementParkingLotNotEquippedWithCOMonitor
CodeCompliance
1PotentiallyCritical
$8,239.00
DrySprinklerSystemAged
LifeSafety
1PotentiallyCritical
$4,780.00
ExteriorPlaza:Reconstruction
Integrity
1PotentiallyCritical
$737,935.00
ExteriorStairs:Damage
Integrity
1PotentiallyCritical
$69,308.00
ExteriorStairs:MortarLoss(SouthElevation)
Integrity
1PotentiallyCritical
$16,473.00
ExteriorWall:CrackingLimestone(Cupola)
Integrity
1PotentiallyCritical
$476,078.00
InsulationDamagedonMechPiping
Energy
1PotentiallyCritical
$44,312.00
PipeandDuctPenetrationsNotSealed
LifeSafety
1PotentiallyCritical
$15,181.00
Roadways:AgedPavement
Integrity
1PotentiallyCritical
$170,917.00
Superstructure:ConcreteSpallingRustingRebar,Catacombs
Integrity
1PotentiallyCritical
$276,223.00
VentilationDampersDamaged
Integrity
1PotentiallyCritical
$2,240.00
Windows:MalfunctioningGasketsandHardware
Energy
1PotentiallyCritical
$667,469.00
ATCAirCompressorAged
BeyondUsefulLife
2NecessaryNotYetCritical
$14,243.00
AirConditioningUnitsElevatorMachRoomAged
BeyondUsefulLife
2NecessaryNotYetCritical
$25,960.00
BuildingAutomationSystemLimited/Outmoded
Modernization
2NecessaryNotYetCritical
$893,226.00
Casework:AgedandNonADAKitchenette
BeyondUsefulLife
2NecessaryNotYetCritical
$26,102.00
CeilingFinishes:AgedandStainedACT
Integrity
2NecessaryNotYetCritical
$529,710.00
ComputerRoomACUAged
BeyondUsefulLife
2NecessaryNotYetCritical
$37,549.00
DomesticHotWaterHeater(Steam)Aged
BeyondUsefulLife
2NecessaryNotYetCritical
$8,826.00
ElectricalOutletsandSwitches:BeyondRatedLife
BeyondUsefulLife
2NecessaryNotYetCritical
$246,457.00
ExteriorDoors:Aged(MetalAssemblies)
BeyondUsefulLife
2NecessaryNotYetCritical
$29,416.00
ExteriorLightingEquipment:BeyondRatedLife
BeyondUsefulLife
2NecessaryNotYetCritical
$16,559.00
DeficiencyReportCapitolBuilding
April,2012
ExteriorWall:LimestoneCracking(MainBody)
Integrity
2NecessaryNotYetCritical
$21,822,884.00
ASSETNAME
REQUIRMENT
CATEGORY
PRIORITY
FanCoilUnitSystemAged
BeyondUsefulLife
2NecessaryNotYetCritical
$301,584.00
FireAlarmSystem:BeyondRatedLife
BeyondUsefulLife
2NecessaryNotYetCritical
$642,599.00
FloorFinishes:AgedCeramicTile(Cafeteria)
BeyondUsefulLife
2NecessaryNotYetCritical
$10,952.00
FloorFinishes:AgedandStained(Carpet)
BeyondUsefulLife
2NecessaryNotYetCritical
$528,602.00
HeatingandCoolingPipingDeteriorated
BeyondUsefulLife
2NecessaryNotYetCritical
$776,360.00
HotWaterHeatingSystemIncomplete
Modernization
2NecessaryNotYetCritical
$167,964.00
InteriorDoors:Refinish(WoodPanel)
Integrity
2NecessaryNotYetCritical
$168,874.00
InteriorDoors:Wear(HawthornRoom)
Integrity
2NecessaryNotYetCritical
$18,496.00
InteriorLightingEquipment:BeyondRatedLife
Energy
2NecessaryNotYetCritical
$964,206.00
PassengerElevators1to6:BeyondRatedLife
BeyondUsefulLife
2NecessaryNotYetCritical
$1,437,653.00
PrimaryChilledWaterPumpsAged
BeyondUsefulLife
2NecessaryNotYetCritical
$43,197.00
Restrooms:AgedandNotADAAGCompliant
CodeCompliance
2NecessaryNotYetCritical
$838,631.00
SecondaryChilledWaterPumpsAged
BeyondUsefulLife
2NecessaryNotYetCritical
$66,235.00
StandpipesandHoseConnectionsAged
LifeSafety
2NecessaryNotYetCritical
$123,129.00
AbandonedLift
Accessibility
3Recommended
$6,460.00
AbandonedSteamHeatingEquipment
Obsolescence
3Recommended
$8,516.00
Catwalks:InsufficientConstruction(Roof)
LifeSafety
3Recommended
$56,117.00
CeilingFinishes:HistoricRestoration
Appearance
3Recommended
$5,958,225.00
EgressAccess:NonCompliantArrangement(5thFloor)
LifeSafety
3Recommended
$452,747.00
ElectricalOutlets:NonGFCINearSinks
Functionality
3Recommended
$2,076.00
KitchenBugLights:NotPresent
Modernization
3Recommended
$2,447.00
LightingandBranchWiring:OccupancySensorsInsufficient
Energy
3Recommended
$46,881.00
LightningProtection:NotPresent
Functionality
3Recommended
$55,930.00
MasterClockSystem:BeyondRatedLife
BeyondUsefulLife
3Recommended
$195,827.00
OrnamentalDrinkingFountainsRequireRepair
Reliability
3Recommended
$8,511.00
ADAAccess:ProvideChairlift(SenateGallery)
Accessibility
4DoesNotMeetCurrentCodes/Standards
$34,804.00
Handrails/Guardrails:NonCompliantSpacing(ExitEnclosure)
CodeCompliance
4DoesNotMeetCurrentCodes/Standards
$324,673.00
COST
DeficiencyReportCapitolBuilding
April,2012
InteriorDoors:HardwareNotADACompliant
Accessibility
4DoesNotMeetCurrentCodes/Standards
$161,682.00
RaisedPlatform:AccessNotADACompliant
Accessibility
4DoesNotMeetCurrentCodes/Standards
$129,320.00
TOTALBASECOST
INFLATIONARYADJUSTMENT04/15/12
INFLATIONARYAMOUNT
TOTALADJUSTEDBASECOST
ADDITIONALPROJECTCOST(DESIGNFEES,ADM.FEES,CONST.CONTINGENCY,ETC.)
TOTALPROJECTCOST(PLANNING,DESIGNANDCONSTRUCTION)
$42,108,044.00
2.50%
$1,052,701.10
$43,160,745.10
$8,528,247.00
$51,688,992.10