Date: 10-02-2012 THE EXECUTIVE ENGINEER MAJOR WORKS DIVISION. KPTCL, MANGALORE.

REF NO: DWA NO: T&P/TL-432/1846 Dtd 30.11.2010 FOR Supply. Name of the project:
Conversion of existing 110kv SC SRS-KIOCL line to 110kv DC line from 220/110kv SRS Kavoor to the existing MCF tapping point (from LOC no 1 to LOC 17) for a distance of 3.88 Km and construction of 110 kv Terminal Bay at 220/110/33/11 kv R S Kavoor and 110/33/11kv Baikampady Substation in Mangalore Taluk, D K District on Total Turnkey Basis including supply of all Materials/Equipments and Erection Including of all Materials / Equipments , Testing and Commissioning. Dear Sir, Kind Attn: Mr Devaraj Accounts Officer. Sub : Issue of C forms. With reference to the letter no. GNB/KPTCL/TL-432/S/2112 dated 28-10-2011 we request you to issue C forms quaterwise as per the following statement.
2nd Quarter (July 2011 to Sept 2011) Sr No 1 Baan Invoice NO 70I/4000263

Claim Letter Refernce No GNB/KPTCL/TL-432/S/04

Date 23-7-2011

Amount 9315531

GNB/KPTCL/TL-432/S/06

70I/4000267

11/8/2011

135810

BR No And Date 314/30-7-2011 312/30-7-2011 313/30-7-2011 512/30-7-2011 513/15.10.2011 514/15.10.2011

Kindly arrange to issue the C forms against the Baan Invoices. Thanking you Yours Faithfully For Godrej & Boyce Mfg Co Ltd.

Authorized Signatories Copy to: Financial Advisor (A&R) KPTCL. The Chief Engineer, (Transmission) KPTCL , Hassan Company Secretary, KPTCL Kaveri Bhavan , Bangalore. The Section Engineer, Major Works Division, KPTCL, Mangalore The Controller of Accounts. T&P KPTCL, Kaveri bhavan, Bangalore