Sie sind auf Seite 1von 2

CODE NO: RR320105

RR

III B.TECH - II SEMESTER EXAMINATIONS, APRIL/MAY, 2011 ESTIMATING, QUANTITY, SURVEYING AND VALUATION (CIVIL ENGINEERING) Time: 3hours Max. Marks: 80 Answer any TWO questions from PART-A PART-B is compulsory --PART A (32 - Marks) 1. 2. Explain the Centre Line Method of estimation of buildings with an example? Calculate the unit rate per Cubic metre by performing Rate analysis for the following items. a) Cement Concrete Floor 1:2:4. b) 12 mm plastering 1:6. Write the detailed specifications for Damp Proof course (2.5 cm thick) C.C 1:1.5:3. What is a Contract? How do you prepare contract document? Write the general conditions of contract? PART B (48 Marks) 4. Figure 1 shows the plan and sectional details of a two roomed building. Estimate the quantities of the following items. i) Earthwork in Excavation in foundation ii) Lime Concrete in foundation iii) Ist Class Brick work in cement mortar 16 in foundation & plinth. iv) 2.5 cm c.c. damp proof course. v) Ist class brickwork in lime mortar in super structure.

3.a) b)

******

Das könnte Ihnen auch gefallen