1. you have to get LV design approval 2. the summary sheet should be complete for 13 transformer 3.

Above ground floor and hatch above the substaion room (attach full floor) 4. basement floor and hatch below the substaion room (attach full floor) 5. the substation section details should be indicate the following

1. Cable route below the substation room tray or trench 2. FFL of the Substation should be higher by minimum 0.15mtrs. to maximum 0.3mtrs. with respect to adjacent ground level (towards substation door).

Answers: 1. 2. 3. 4. 5. 6. LV design approval is in process. The correct summary sheet is attached. Our substation is an external single story building separate from the main building. Same as answer 3. Substation elevation has been attached as well as trenches layout. FFL of substation relevant to the adjacent ground level is between 0.15m to 0.30m, however the FFL levels indicated on the drawings aare the absolute levels.