Sie sind auf Seite 1von 2

Engro Energy Power Plant - Qadirpur

OPERATING INSTRUCTIONS TITLE:

OPC Over Speed (103%) Test


Issue Date
PROCEDURE OBSERVATIONS

STEP NO.

Information

The following procedure describes the use of the control screens.

This procedure can be carried out with machine at FSNL


Before Start Testing no any Other Test in Progress. 1 2 3 4 Steam Turbine at 3000rpm. Set the target speed at 3100rpm; set the speed up rate at 50rpm/min. On DEH picture, select Yes for OPC Overspeed test in OPC Test. When the turbine speed is increased to 3090rpm, OPC solenoid valve is actuated and the regulating valve is turned to Closed. When the turbine speed drops to about 3000rpmthe Overspeed protection is reset and GV1/2 will Open to maintain Speed 3000 rpm. Relieve OPC Test, select No for OPC Test. Maintain the 3000rpm rating. Record on plant check sheet Check from field operator for any abnormality.

5 6 7

Rev : 01

Page 1 of 2

Engro Energy Power Plant - Qadirpur

Name Prepared By: Reviewed By: Approved By:

Designation

Dated Signature

MHB

( Supervisor Ops) Engineer (S. Coordinator) Sr. Manager Operations

Rev : 01

Page 2 of 2

Das könnte Ihnen auch gefallen