Sie sind auf Seite 1von 1

To monitor and to ensure that all the activities of the civil works (Road constr uction and Piling

works) under the TNB 132KV Rentis area is carry out according to the TNB and ST safety Regulation To allies with the reverent parties/authorities and to obtain Permit to Work befor e any construction works started under the TNB rentis. To inform reverent parties/authorities of the nature of works and the schedule a s planned and a copy of the report shall submitted to Suruhanjaya Tenaga for the ir references. To ensure that all the construction material and other rubbish is removed out by the construction contractor under the TNB rentis after works has been completed . To ensure that all the heavy vehicle/vehicles that enter the construction site u nder the TNB Rentis is within the safe limit of the lowest overhead transmission line To ensure that no temporary structure/hut/shuttle/vehicle is allow to construct or park under the transmission line To submit weekly report with photos of the construction works site To be at the work site all the time and to monitor the construction works during the construction works is carry out under the TNB Rentis To allies with TNB authorities during their visit/sport check at the constructio n site. To supervise and to ensure the safety of the construction people, vehicle enteri ng to the area, piling frame for piling works and the safety of Company/TNB prop erties during the construction period To allies with reverent authorities and to obtain the approval for PWO before the construction works is to carry out as in the Work Scope listed above

Das könnte Ihnen auch gefallen