TOWER CRANE INSTALLATION

TOWER CRANE INSTALLATION FOR SOME THINGS TO NOTE:

A. LOCATION / PROJECT B. LAYOUT OF TOWER CRANE C. TOWER CRANE FOUNDATION SYSTEM D. HOW TO SETUP E. HOW TO OPERATION F. TOWER CRANE SAFETY AFTER FREE STANDING G. HOW TO DISASSEMBLY H. ADDITIONAL AND OTHERS

A. LOCATION / PROJECT TOWER CRANE IN GENERAL WHERE CAN JUST INSTALLED include: I. Ashore II. IN THE MOUNTAINS III. BUILDING ABOVE IV. ABOVE SEA pontoon B. LAYOUT OF TOWER CRANE I. TOWER CRANE CAN INSTALLED IN THE EDGE OF BUILDING PLANS II. TOWER CRANE CAN PLAN OF BUILDINGS INSTALLED amid III. TOWER CRANE CAN INSTALLED SO AFTER THAT OF THE BUILDING IV. TOWER CRANE POSTED ABOVE CAN SHIP pontoon SOME OF THE LAYOUT OR THE PLACEMENT OF TOWER CRANE TO TERBAIAK CECARA CAREFULLY CALCULATED FROM SINCE FITTING, OPERATION, DISASSEMBLY AND THE EFFECT ON THE ENVIRONMENT

C. TOWER CRANE FOUNDATION SYSTEM I. TOWER CRANE FOUNDATION SYSTEM CAN USE Compiled ABOVE CONCRETE BLOCK CHASSIS

II. TOWER CRANE FOUNDATION CAN USE fixing ANGELES / anchor. UNT NEEDED FOUNDATION SOIL WITH CONDITIONS sized to fit FROM THE LAND OF THE TECHNICAL DATA IN ACCORDANCE WITH THE FACTORY IN GENERAL = 6 X 6 MT MT MT 1.2. ADJUSTED TO USE COMMON stake amount. ORDINARY stake USED = 40 CM X40CM X12 MT TOTAL 4/6 BH D. HOW TO SETUP I. TOWER CRANE INSTALLATION NORMALLY USE TOOLS AND STANDARD MINIMUM 35 TON CRANE CAR ACCORDING TO DISTANCE MAXSIMAL TOWER CRANE FOUNDATION LAYOUT WITH THE MOST NEAREST CAR CRANE. II. PREPARATION FOR THE INSTALLATION OF TOWER CRANE TO BE: A. AGE CONCRETE FOUNDATION 2. WEATHER CONDITIONS 3. EVENT LOCATION 4. KELEMNGKAPAN OF TOWER CRANE 5. PROCUREMENT TOOLS MOBILCRANE 6. EQUIPMENT MEMADAHI 7. LABOR skilled 8. WORK MUST FOLLOW ALL OF TECHNICAL AND NORMA Consult your owner - NORMA K 3. INSTALLATION OF TOWER CRANE III.URUTAN: A. CLEANING THE TOWER CRANE FOUNDATION LOCATION 2. CRANE CAR SETTINGS 3. POST Basic View SEKSEN MAST 4. Put telescopic 5. Slewing GEAR PAIRS 6. Put the landing slewing AND CABIN 7. TOP POST HEAD 8. POST COUNTER JIB 9. Reply STONE POST 1 (ONE) BH SMALL / 3250 KG 10. JIB SET AND POST BOM 11. Reply STONE POST 4 (FOUR) BH 12. ELECTRICAL SYSTEM SETTINGS 13. POST CRANE EQUIPMENT TOWQER 14. Sling SETTINGS Trolly 15. SETTINGS sling hoist 16. TEST SYSTEM COMBINED MECHANICAL ELECTRICAL WORK 17. PREPARATION JEKING 18. MAST NEEDS APPROPRIATE SETTINGS SEKSEN 19. JEKING

DESCRIPTION: THE TIME TO DO JEKING seyogjanya DAYLIGHT WITH GOOD WEATHER, TO EACH POSITION CONTROL too well NOT REMOVE THE POSSIBILITY OF THINGS THAT INTEREST CAN NOT HAPPEN.

E. HOW TO OPERATION TOWER CRANE OPERATION OF SOME THINGS TO NOTE: A. OPERATOR MUST BE LIABLE competent, skilled and SENSITIVE TOOL IN RUNNING. 2. GOOD TOOL IN ROUTINE MAINTENANCE MAINTENANCE AND REPLACEMENT servise PARTS. 3. TOWER CRANE EQUIPMENT TO BE EFFECTIVE AND NON BERMANUFER EQUIPMENT IN ACCORDANCE WITH THE REQUIREMENTS OF PROJECT FREE cultivated 360 free spins. 4. TOOL CAN FOLLOW THE NEED FOR INDEPENDENT PROJECT BERMANUFER BUT DO NOT REMOVE FROM THE RULES OF USER EQUIPMENT SUCH AS TYPE.

F. TOWER CRANE SAFETY AFTER FREE STANDING A. FREE STANDING AFTER THE TOWER CRANE TO BE INSTALLED LEVEL ADDITION TO TIE IN FIRST OR BRESING. 2. ADDITION TO ALTITUDE AFTER POST BRESING TOWER CRANE CAN ONLY ADD 12 BH MAST SEKSEN BRESING ABOVE. (ADJUSTED TO THE TECHNICAL DATA FROM FACTORY). 3. FOR INSTALLATION IN TECHNICAL TIPERHITUNGKAN BRESING MUST REMEMBER AFTER THE TOWER CRANE 12 MAST SEKSEN BRESING ABOVE FOR SUCH EQUIPMENT FROM THE MOMENT JUST bolsters MENGHADALKAN BRESING POWER. 4. ADDITION TO THE NEXT LEVEL PLEASE MADE WITH TECHNICAL DATA FROM FACTORY

G. HOW TO DISASSEMBLY TOWER CRANE FOR DISASSEMBLY DEMGAM DIFFERENT WAYS TO DO ACCORDING TO FIELD CONDITIONS; A. TOWER CRANE CAN USE NORMAL dismantled CRANE CAR 2. TOWER CRANE TO USE TOOL can be dismantled or portable CRANE CRANE MANUAL

3. TOWER CRANE MANUAL CAN dismantled coinciding with FIELD CONDITIONS.

H. ADDITIONAL TOWER CRANE GENERAL TOOL NEEDS A VERY IMPORTANT PROJECT FOR BUILDING HOUSE WITH BERINGKAT of the level of REACH ARMS AND THE VERY IDIAL. TOWER CRANE SOME TYPES AND BRANDS HAVE, ACCORDING TO THE EXPERIENCE THAT WE GET THIS JUST LIKE THE CHEAP Potain EASY MAINTENANCE AND OPERATION. THAT IS THE MOST IMPORTANT TOOL FOR: # TREATING IS BETTER THAN THE CORRECT #

BRIEF DESCRIPTION AND FEATURES SUCH AS SIMPLE TOOL FOR TOWER CRANE.

JAKARTA 13 OCTOBER 1998 PT. GRACE TRUST PERSADA.