Presentation to Movement for a Liveable Cebu June 2012 Integrated Transport Planning Ltd.
1. 2. 3. 4. 5. 6. 7.
Background and History The BRT Pre Feasibility Study The BRT Feasibility Study BRT Route Choice BRT Infrastructure Design Fuente Osmea Design Issues Next Steps
2008: Request for World Bank funding for BRT development 2009-2011: DOTC Metro Cebu public transport strategy 2009: Cebu City BRT Pre Feasibility Study 2010: Cebu City Resolution to accept BRT 2011-2012: BRT Detailed feasibility study
Benefit Cost Ratio (BCR) Net Present Value (NPV) Internal Rate of Return (IRR)
Area Traffic Control system Partial restructuring of PUJ routes Institutional & regulatory restructuring
2 major junctions
All major junctions 7,000 across 52 barangays mix mode 3,000 on-board 11 PUJ routes BRT corridor and 6 other routes BRT corridor 11 PUJ routes 400 mixed mode/location
Service Plan
Services 1. Bulacao Talamban 2. Bulacao SRP 3. Bulacao IT Park 4. Bulacao Ayala 5. Talamban - SRP
Parade route
Leisure and celebratory function of Fuente Linearity of Boulevard
Infrastructure Design
Busway: Segregation
Draft perspective
Feasibility study complete Detailed design commences Design complete Earliest construction commences Operation!