Sie sind auf Seite 1von 2

Page 1 of 2

Radiogram No. 5606u Form 24 for 06/27/07


REGUL-ОС STRING 2 TEST. АСН-М TEST
GMT CREW ACTIVITY
06:00-06:10 Morning inspection
06:10-06:25 FE-1 Post-sleep
06:10-06:25 CDR Biochemical urine test
06:10-06:40 FE-2 Post-sleep
06:25-06:40 FE-1 Biochemical urine test
06:25-06:55 CDR Post-sleep
06:40-06:55 FE-1 Post-sleep
06:40-06:55 FE-2 Biochemical urine test
06:55-07:45 CDR, FE-2 BREAKFAST
06:55-07:05 FE-1 Stowing Urolux hardware
07:05-07:45 FE-1 BREAKFAST
07:45-08:00 Daily Planning Conference (S-band)
08:00-08:10 FE-1 BREAKFAST
08:00-08:20 CDR, FE-2
Prep for Work
08:10-08:30 FE-1
CDR, FE-2-
08:20-08:50 Periodic Health Status
assists
08:50-10:10 CDR Recovering SM ТМ168-04 sensor data (parameter Т265)
FE-1, FE-2-
08:50-09:20 Periodic Health Status
assists
FE-2, FE-1-
09:25-09:55 Periodic Health Status
assists
09:55-10:10 FE-2 Photo/TV setup for PFE footage
10:00-10:30 FE-1 Flushing БРПК separator
10:10-10:15 FE-2 Terminate BSA battery charge
10:10-10:20 CDR Mating ТМ168-04 sensor telemetry connectors to БИТС2-12
10:20-11:35 FE-2 OUM test prep
10:20-10:30 CDR Recovering SM ТМ168-04 sensor data (parameter Т265)
10:30-11:50 CDR PLASMA CRYSTAL. Hardware setup
10:35-11:05 FE-1 Testing БРИ power
FE-2, FE-1-
11:35-12:05 OUM Protocol
assists
11:50-12:00 CDR PLASMA CRYSTAL. Experiment set up
12:05-12:40 FE-2 OUM-PFE deactivation and stowage 1
12:10-12:20 CDR, FE-1 Testing БРИ power
12:20-12:40 CDR PLASMA CRYSTAL. Leak check before evacuation
12:25-13:05 FE-1 PHS Equipment stow
12:40-12:55 FE-2 Stow video equipment used to film PFE
12:40-13:00 CDR URAGAN. Familiarization with ТИУС hardware
13:00-13:05 CDR On MCC GO ISS О2 repress from Progress 359 СрПК (start)
Page 2 of 2

13:05-14:05 LUNCH
14:05-14:10 CDR ISS О2 repress using Progress 359 СрПК (terminate)
Measuring resistance on SM to establish the cause of BVS deactivation.
14:05-15:30 FE-1
Tagup (S-band)
14:05-14:15 FE-2 OUM-PFE Hardware Deactivation
14:10-14:30 CDR IMS Update
14:15-15:15 FE-2 US EVA Tool Stowage Ops
14:30-16:30 CDR PROFILAKTIKA. Cycle Ergometer Experiment
15:15-16:00 FE-2 Unpack cargo delivered on 13А
15:30-16:00 FE-1 PROFILAKTIKA. Cycle Ergometer Experiment (assistance)
16:00-17:00 FE-2 ISS crew orientation
16:05-16:20 Taking readings from АОК ГАНК-4М gas analyzer
16:20-16:30 FE-1 Hematocrit. Equipment setup
16:30-18:30 PROFILAKTIKA. Cycle Ergometer Experiment
16:30-17:10 СОЖ Maintenance
CDR
17:10-17:40 PROFILAKTIKA. Cycle Ergometer Experiment (assistance)
17:10-18:10 FE-2 Physical Exercise (RED)
17:40-17:50 URAGAN. Tagup with specialists (S-band)
CDR
17:50-18:15 URAGAN. Set up and Observation using ТИУС (Three-Stage Rate Sensor)
18:10-18:15 FE-2 Payload status check
18:15-19:05 CDR, FE-2 Evening work prep
18:30-18:35 Transferring water to SM Rodnik Water Tank БВ2 - closeout ops
18:35-18:40 FE-1 Transfer TVIS/RED/CEVIS/HRM data to MEC
18:40-19:05 Report prep
19:05-19:20 Daily Planning Conference (S-band)
19:20-19:30 Evening work prep
19:30-20:00 DINNER
20:00-20:30 Daily food prep
20:30-21:30 Pre-sleep
21:30-06:00 SLEEP
Notes:
1. Tagups with specialists during all activities related to:
URAGAN, PROFILAKTIKA, PLASMA CRYSTAL, БИТС, RODNIK
See OSTPV for S-band coverage
2. See OSTP for references to US activities.

End of Radiogram

Das könnte Ihnen auch gefallen