Sie sind auf Seite 1von 1

Page 1 of 1

Radiogram No. 5567u Form 24 for 06/21/07


DEVICE ША 575Л (БП1А) R&R
GMT CREW ACTIVITY
06:00-06:10 Morning inspection
06:10-06:40 Post-sleep
06:40-07:30 BREAKFAST
07:30-07:35 FE-1 Cryogem-03M Thermostat Temperature Check
08:45-09:00 E15, E13, and E14 Crew Conference (S-band)
Installation of Replaceable Condensate Removal Lines [СМОК] - prep ops
09:00-10:00 FE-1
(equipment search)
09:20-10:20 CDR Physical Exercise (VELO + RED) day 4
10:20-11:50 FE-1 Physical Exercise (TVIS), day 4
11:20-11:30 CWC audit
11:30-11:45 FE-2 RED inspection and access evaluation
11:45-12:45 Physical Exercise (RED)
11:50-12:35 CDR ША 575Л (БП1А) R&R. Tagup with specialists (S-band)
12:45-13:45 FE-1, FE-2 LUNCH
12:45-13:05 LUNCH
13:05-13:20 CDR ЦВМ1 and ТВМ2 channels health check. Tagup with specialists (VHF)
13:20-14:00 LUNCH
13:45-14:25 FE-1 СОЖ Maintenance
14:00-14:20 FE-2 P/TV-BPSMU stowage
14:50-15:15 CDR ЦВМ1 and ТВМ2 channels health check. Tagup with specialists (VHF)
15:10-15:15 FE-2 Power up CUP PCS
15:15-16:25 CDR Physical Exercise (TVIS), day 4
15:25-16:25 FE-1 Physical Exercise (VELO + RED) day 4
15:50-16:50 FE-2 DOUG Software Review
16:25-16:35 ЦВМ1 and ТВМ2 channels health check. Tagup with specialists (VHF)
CDR Elektron activation at 32A mode, and Temperature monitoring on Secondary
16:45-17:25
Purification Unit after Elektron activation
16:50-17:00 Terminate EMU METOX Regeneration
17:00-17:10 FE-2 Start EMU Metox Regeneration
17:10-18:40 Physical Exercise (TVIS)
18:15-18:45 CDR, FE-1 Evening work prep
18:40-18:45 FE-2 Transfer TVIS/RED/CEVIS/HRM data to MEC
18:45-19:00 Daily Planning Conference (S-band)
19:00-19:30 Evening work prep
19:30-20:00 DINNER
20:00-20:30 Daily Food Prep
20:30-21:30 Pre-sleep
21:30-06:00 SLEEP
Note: See OSTP for references to US activities.
End of Radiogram

Das könnte Ihnen auch gefallen